  1. Pay special attention to the pronunciation and stress of the following words.

access [΄ækses] cellar [΄selə] accessory [ək΄sesərı] impact [΄ımpækt] evaluate [ı΄væljueıt] survey [΄sə:veı]

Terms and Vocabulary

access road

подъездной путь

be disposed offsite

быть расположенным за пределами территории

boundary

граница

bring in (v)

приносить

bring in a well

приготовить к эксплуатации

cellar

шахта под вышкой, устьевая шахта

conductor pipe

кондуктор, первая колонна обсадных труб

dig off (v)

выкопать, вырыть

dispose (v)

отделять (обломки пород)

drilling accessories

буровая арматура

ecologically sensitive area

экологически уязвимая территория

environmental impact studies

исследование влияния на окружающего среде

evaluate (v)

юридически оценить

go about (v)

приступать к чему-либо; начать работать над чем-то

lease agreement

договор об аренде

level (v)

выравнивать

line smth (v) with

обивать что-либо

marsh

болото

obtain (v)

получать, приобретать

reserve pit

запасной амбар для бурового раствора

right-of-way

доступ к территории

settle the legal issue

урегулировать правовые/ юридические вопросы

store (v)

хранить

survey (v)

исследовать; производить съемку

truck away (v)

увозить на грузовике

wilderness

пустыня, дикая местность

2. Read the text “Prepare to Drill” paying attention to the terms in bold and compare your variant of preparation to drill with that one mentioned in the text. Prepare to Drill

Once the site has been selected, it must be surveyed to determine its boundaries and environmental impact studies may be done. Lease agreements, titles and right-of-way accesses for the land must be obtained and evaluated legally. Once the legal issues have been settled, the crew goes about preparing the land:

  1. the land is cleared and levelled and access roads may be built;

  2. because water is used in drilling, there must be a source of water nearby. If there is no natural source, they drill a water well;

  3. they dig a reserve pit, which is used to dispose rock cuttings and drilling mud during the drilling process, and line it with plastic to protect the environment. If the site is an ecologically sensitive area, such as a marsh or wilderness, then the cuttings and mud must be disposed offsite –trucked away instead of placed in a pit.

Once the land has been prepared, several holes must be dug to make way for the rig and the main hole. A rectangular pit, called a cellar, is dug around the location of the actual drilling hole. The cellar provides a work space around the hole, for the workers and drilling accessories. The crew then begins drilling the main hole, often with a small drill truck rather than the main rig. The first part of the hole is larger and shallower than the main portion and is lined with a large-diameter conductor pipe. Additional holes are dug off to the side to temporarily store equipment – when these holes are finished, the rig equipment can be brought in and setup.

(Baker R. “A Primer of Oil Well Drilling”, 2001, Austin, Texas)

  1. crown block

  2. mast

  3. monkeyboard

  4. traveling block

  5. hook

  6. swivel

  7. elevators

  8. kelly

  9. kelly bushing

  10. master bushing

  11. mousehole

  12. rathole

  13. backup tongs

  14. drawworks

  15. weight indicator

  16. driller’s console

  17. doghouse

  18. rotary hose

  19. accumulator unit

  20. pipe ramp

  21. pipe rack

  22. substructure

  23. mud return line

  24. choke manifold

  25. mud-gas separator

  26. degasser

  27. reserve pit

  28. mud tanks

  29. desilter

  30. desander

  31. centrifuge

  32. mud pumps

  33. dry mud components

storage

  1. water storage

  2. engines and generators

  3. blowout preventer stack

Fig.1. Drilling rig components