Добавил:
Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
reading / British practice / Vol A - 1990 PLANNING & LAYOUT (ocr).pdf
Скачиваний:
4
Добавлен:
15.03.2023
Размер:
14.62 Mб
Скачать

References

25.5.5Littlebrook D auxiliary gas turbine access and maintenance activities. The gas exhaust

installation

As mentioned previously, many of the CEGB's major conventional and nuclear power stations have been installed with auxiliary gas turbines. Figure 2.102 shows the layout of the installation at Littlebrook D power station. The three units, nominally one for each of the main generating units, are housed in a small building.in a transverse orientation.

The spacing between machines is largely governed by the requirement for providing adequate space for

chimney is located along the centreline of the central gas turbine unit in order to minimise the overall length of the gas exhaust ducts.

26 References

[ 1) BS476: Part 22: Methods for determination of the fire resistance of non-loadbearing elements of construction: 1987.

[2]Miller. D.S: Hydraulic design data for power station cooling water systems: British Hydro-Mechanics Research Association: December 1970.

CONSTRUCTION

DOOR

Fig. 2.102 Littlebrook 'D gas turbine installation layout

177

Соседние файлы в папке British practice