
- •Introduction to the Anchor Handling Course
- •Technical Specifications:
- •Winch Layout:
- •Power Settings / Bollard Pull
- •All operations on board must be performed in accordance with Company Procedures.
- •Risk Assessment
- •Planning
- •Planning:
- •Goal, example:
- •What to do:
- •Electrical winches
- •Winch operation
- •General Arrangement
- •A/H-Drum at full Capacity
- •Over speed
- •Water brake
- •Band brake
- •QUICK & Full Release
- •Hydraulic Winches
- •Lay out (B-type)
- •Hydraulic winch, “B-type”
- •TOWCON
- •Instruction for use of Wire Drums
- •Changing of Chain Wheels (Wildcats / Chain Lifter)
- •TRIPLEX - SHARK JAW SYSTEM.
- •Operation
- •Maintenance and inspections
- •Safety
- •2. OPERATION:
- •QUICK RELEASE:
- •EMERGENCY RELEASE:
- •CONTROL PANEL
- •Marks for Locked on Hinge Link
- •2.2- OPERATION OF THE "JAW IN POSITION ACCEPT" LEVER:
- •2.3 OPERATION OF THE CONTROL PANEL AT EMERGENCY POWER.
- •3. ELECTRIC AND HYDRAULIC POWER SYSTEM.
- •3. 1. ARRANGEMENT OF SYSTEM.
- •3.2. FUNCTIONING OF QUICK RELEASE - JAWS ONLY.
- •3.3. FUNCTIONING OF EMERGENCY RELEASE
- •4.2 Test without Load.
- •4.3 Test with Load.
- •5. General Maintenance
- •5.1 Accumulators Depressurising
- •5.2 Shark Jaw Unit
- •5.3 Guide Pins Units
- •5.4 Hydraulic System
- •5.5 Electric System
- •6. Control Measurements / Adjustments.
- •6.2 Adjustment of inductive proximity switches on lock cylinders.
- •6.3 Adjustment of Pressure Switches for Lock Pressure.
- •7. Test Program – Periodical Control
- •7.2 Checking List – Periodic Control Mechanical / Hydraulic.
- •7.3 Checking List – Periodic Control Electrical
- •7.4 Testing without Load – Yearly Testing.
- •7.5 Load Test – Emergency Release – 5 Year Control.
- •“Mark on line !”
- •“Double set of Jaws, Pins and Wire lifter”
- •View from the bridge.
- •“JAW READY FOR OPERATION”
- •“JAW LOCK POSITION ACCEPTED”
- •KARM FORK – SHARK JAW SYSTEM.
- •Wire and chain Stopper
- •Inserts for KARM FORK
- •Martensite:
- •Recommendations:
- •1. THE BASIC ELEMENTS OF STEEL WIRE ROPE
- •2. STEEL WIRE ROPE CONSTRUCTIONS
- •3. SPECIAL STEEL WIRE ROPES
- •4. USE OF STEEL WIRE ROPE
- •5. SELECTING THE RIGHT STEEL WIRE ROPE
- •6. ORDERING STEEL WIRE ROPE
- •7. STEEL WIRE ROPE TOLERANCES
- •8. HANDLING, INSPECTION AND INSTALLATION
- •9. INSPECTION AND MAINTENANCE
- •10. ELONGATION AND PRE-STRETCHING
- •11. OPERATING TEMPERATURES
- •12. MARTENSITE FORMATION
- •13. END TERMINATIONS
- •14. SOCKETING (WIRELOCK)
- •15. DRUM CAPACITY
- •16. CLASSIFICATION AND USE OF STEEL WIRE ROPE
- •17. ROPES
- •18. CHAINS AND LIFTING COMPONENTS
- •19. TECHNICAL CONVERSION TABLES
- •SWIVEL
- •MoorLink Swivel
- •Pin Extractor
- •Socket Bench
- •Chains and Fittings
- •STUD LINK MOORING CHAIN
- •OPEN LINK MOORING CHAIN
- •KENTER JOINING LINKS
- •PEAR SHAPE ANCHOR CONNECTING LINK
- •DETACHABLE CONNECTING LINK
- •D’ TYPE JOINING SHACKLES
- •‘D’ TYPE ANCHOR SHACKLES
- •SHACKLES
- •JAW & JAW SWIVELS
- •BOW & EYE SWIVELS
- •MOORING RINGS
- •FISH PLATES
- •PELICAN HOOKS
- •SLIP HOOKS
- •‘J’ CHASERS
- •PERMANENT CHASERS
- •DETACHABLE PERMANENT CHAIN CHASERS
- •PERMANENT WIRE CHASERS
- •‘J’ LOCK CHAIN CHASERS
- •The way to break the anchor loose of the bottom is therefore:
- •Table of contents
- •Introduction
- •General
- •Mooring systems
- •Mooring components
- •History of drag embedment anchors
- •Characteristics of anchor types
- •History of vryhof anchor designs
- •Criteria for anchor holding capacity
- •Theory
- •Criteria for good anchor design
- •Aspects of soil mechanics in anchor design
- •Soil classification
- •Fluke/shank angle
- •Fluke area
- •Strength of an anchor design
- •Anchor loads and safety factors
- •Anchor behaviour in the soil
- •Proof loads for high holding power anchors
- •Anchor tests
- •Soil table
- •Practice
- •Introduction
- •Soil survey
- •Pile or anchor
- •Setting the fluke/shank angle
- •Connecting a swivel to the Stevpris anchor
- •Chasers
- •Chaser types
- •Stevpris installation
- •Laying anchors
- •Retrieving anchors
- •Anchor orientation
- •Decking the Stevpris anchor
- •What not to do!
- •Racking the Stevpris
- •Deploying Stevpris from the anchor rack
- •Boarding the anchor in deep water
- •Ballast In fluke
- •Chaser equilibrium
- •Deployment for permanent moorings
- •Piggy-backing
- •Piggy-back methods
- •Stevmanta VLA installation
- •Installation procedure
- •Stevmanta retrieval
- •Double line installation procedure
- •Stevmanta retrieval
- •Double line installation with Stevtensioner
- •The Stevtensioner
- •The working principle of the tensioner
- •Measurement of the tensions applied
- •Umbilical cable and measuring pin
- •Break - link
- •Duration of pretensioning anchors and piles
- •Handling the Stevtensioner
- •General tensioning procedures
- •Hook-up
- •Lowering
- •Tensioning mode
- •Retrieving
- •Supply vessels/anchor handling vessels
- •Product data
- •Introduction
- •Dimensions of vryhof anchor types
- •Proof load test for HHP anchors (US units)
- •Dimensions of vryhof tensioners
- •Proof load/break load of chains (in US units)
- •Chain components and forerunners
- •Connecting links
- •Conversion table
- •Mooring line catenary
- •Mooring line holding capacity
- •Shackles
- •Wire Rope
- •Wire rope sockets
- •Thimbles
- •Synthetic ropes
- •Mooring hawsers
- •Main dimensions chasers
- •Stevin Mk3 UHC chart
- •Stevin Mk3 drag and penetration chart
- •Stevpris Mk5 UHC chart
- •Stevpris Mk5 drag and penetration chart
- •Stevmanta VLA UPC chart
- •Introduction
- •Propulsion system
- •Propellers
- •Thrusters
- •Rudders
- •Manoeuvring
- •Current
- •Wind
- •Other forces
- •Turning point (Pivot point)
- •Ship handling
- •General layout Jack-Up drilling unit:
- •General information about a Semi Submersible drilling unit:

|
Soil table |
|
|
|
|
|||||
|
|
soil |
ofCementation |
strength |
Rock.Approx |
|
Increasing grain size of |
|
|
|
|
|
|
particulate deposits |
|
|
|||||
|
|
|
|
|
|
|
|
|
||
|
lithificationIncreasing |
soilcemented |
WellfirmlytoweakVery |
|
toWeakweakVery |
0.002 mm |
0.063 mm |
2 mm |
60 mm |
%contentcarbonateTotal |
|
|
|
Carbonate silt |
Carbonate sand |
Carbonate gravel |
|||||
|
|
|
|
|
|
|
90 |
|||
|
|
|
|
|
|
Carbonate clay |
Siliceous carbonate |
Siliceous carbonate |
|
50 |
|
|
|
|
|
|
|
silt |
sand |
Mixed carbonate and |
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
non-carbonate gravel |
|
|
|
|
|
|
|
Calcareous clay |
Calcareous silica silt |
Calcareous silica sand |
|
10 |
|
|
|
|
|
|
Clay |
Silica silt |
Silica sand |
Silica gravel |
|
48 |
|
|
|
|
|
Calcilutite |
Calcisiltite (carb. |
Calcarenite (carb. |
Calcirudite (carb. |
90 |
|
|
|
|
|
|
(carb. Calystone) |
Siltstone) |
Sandstone) |
Conglom. Or Breccia |
|
|
|
|
|
|
|
|
||||
|
|
|
soilcemented |
|
weakmoderately |
Clayey calcilutute |
Siliceous calcisiltite |
Siliceous calcarenite |
Conglomeratic |
50 |
|
|
|
|
calcirudite |
||||||
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Calcareaous claystone |
Calcareous siltstone |
Calcareous sandstone |
Calcareous |
10 |
|
|
|
|
|
|
conglomerate |
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Claystone |
Siltstone |
Sandstone |
Conglomerate or |
|
|
|
|
|
|
|
breccia |
|
|||
|
|
|
|
|
Moderately |
|
|
|
|
|
|
|
|
|
|
Fine-grained limestone |
Detrital limestone |
Conglomerat |
90 |
||
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
limestone |
|
|
|
|
|
|
tostrong |
Fine-grained |
Fine-grained siliceous |
Siliceous detrital |
Conglomerate |
50 |
|
|
|
|
|
|
|
|
Calcareous |
||
|
|
|
|
|
agrillaceous limestone |
limestone |
limestone |
10 |
||
|
|
|
|
|
|
limestone |
|
|||
|
|
|
cemented) (well |
|
extemelytoStrong strong |
Calcareous claystone |
Calcareous siltstone |
Calcareous sandstone |
conglomerate |
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
Claystone |
Siltstone |
Sandstone |
Conglomerate of |
|
||
|
|
rock |
strong |
|
|
|||||
|
|
Conventional metamorphic nomenclature applies in this section |
|
|||||||
|
|
|
|
|
|
|
|
|
Breccia |
|
|
|
|
|
|
|
|
Crystalline limestone or marble |
|
50 |