- •Introduction to the Anchor Handling Course
- •Technical Specifications:
- •Winch Layout:
- •Power Settings / Bollard Pull
- •All operations on board must be performed in accordance with Company Procedures.
- •Risk Assessment
- •Planning
- •Planning:
- •Goal, example:
- •What to do:
- •Electrical winches
- •Winch operation
- •General Arrangement
- •A/H-Drum at full Capacity
- •Over speed
- •Water brake
- •Band brake
- •QUICK & Full Release
- •Hydraulic Winches
- •Lay out (B-type)
- •Hydraulic winch, “B-type”
- •TOWCON
- •Instruction for use of Wire Drums
- •Changing of Chain Wheels (Wildcats / Chain Lifter)
- •TRIPLEX - SHARK JAW SYSTEM.
- •Operation
- •Maintenance and inspections
- •Safety
- •2. OPERATION:
- •QUICK RELEASE:
- •EMERGENCY RELEASE:
- •CONTROL PANEL
- •Marks for Locked on Hinge Link
- •2.2- OPERATION OF THE "JAW IN POSITION ACCEPT" LEVER:
- •2.3 OPERATION OF THE CONTROL PANEL AT EMERGENCY POWER.
- •3. ELECTRIC AND HYDRAULIC POWER SYSTEM.
- •3. 1. ARRANGEMENT OF SYSTEM.
- •3.2. FUNCTIONING OF QUICK RELEASE - JAWS ONLY.
- •3.3. FUNCTIONING OF EMERGENCY RELEASE
- •4.2 Test without Load.
- •4.3 Test with Load.
- •5. General Maintenance
- •5.1 Accumulators Depressurising
- •5.2 Shark Jaw Unit
- •5.3 Guide Pins Units
- •5.4 Hydraulic System
- •5.5 Electric System
- •6. Control Measurements / Adjustments.
- •6.2 Adjustment of inductive proximity switches on lock cylinders.
- •6.3 Adjustment of Pressure Switches for Lock Pressure.
- •7. Test Program – Periodical Control
- •7.2 Checking List – Periodic Control Mechanical / Hydraulic.
- •7.3 Checking List – Periodic Control Electrical
- •7.4 Testing without Load – Yearly Testing.
- •7.5 Load Test – Emergency Release – 5 Year Control.
- •“Mark on line !”
- •“Double set of Jaws, Pins and Wire lifter”
- •View from the bridge.
- •“JAW READY FOR OPERATION”
- •“JAW LOCK POSITION ACCEPTED”
- •KARM FORK – SHARK JAW SYSTEM.
- •Wire and chain Stopper
- •Inserts for KARM FORK
- •Martensite:
- •Recommendations:
- •1. THE BASIC ELEMENTS OF STEEL WIRE ROPE
- •2. STEEL WIRE ROPE CONSTRUCTIONS
- •3. SPECIAL STEEL WIRE ROPES
- •4. USE OF STEEL WIRE ROPE
- •5. SELECTING THE RIGHT STEEL WIRE ROPE
- •6. ORDERING STEEL WIRE ROPE
- •7. STEEL WIRE ROPE TOLERANCES
- •8. HANDLING, INSPECTION AND INSTALLATION
- •9. INSPECTION AND MAINTENANCE
- •10. ELONGATION AND PRE-STRETCHING
- •11. OPERATING TEMPERATURES
- •12. MARTENSITE FORMATION
- •13. END TERMINATIONS
- •14. SOCKETING (WIRELOCK)
- •15. DRUM CAPACITY
- •16. CLASSIFICATION AND USE OF STEEL WIRE ROPE
- •17. ROPES
- •18. CHAINS AND LIFTING COMPONENTS
- •19. TECHNICAL CONVERSION TABLES
- •SWIVEL
- •MoorLink Swivel
- •Pin Extractor
- •Socket Bench
- •Chains and Fittings
- •STUD LINK MOORING CHAIN
- •OPEN LINK MOORING CHAIN
- •KENTER JOINING LINKS
- •PEAR SHAPE ANCHOR CONNECTING LINK
- •DETACHABLE CONNECTING LINK
- •D’ TYPE JOINING SHACKLES
- •‘D’ TYPE ANCHOR SHACKLES
- •SHACKLES
- •JAW & JAW SWIVELS
- •BOW & EYE SWIVELS
- •MOORING RINGS
- •FISH PLATES
- •PELICAN HOOKS
- •SLIP HOOKS
- •‘J’ CHASERS
- •PERMANENT CHASERS
- •DETACHABLE PERMANENT CHAIN CHASERS
- •PERMANENT WIRE CHASERS
- •‘J’ LOCK CHAIN CHASERS
- •The way to break the anchor loose of the bottom is therefore:
- •Table of contents
- •Introduction
- •General
- •Mooring systems
- •Mooring components
- •History of drag embedment anchors
- •Characteristics of anchor types
- •History of vryhof anchor designs
- •Criteria for anchor holding capacity
- •Theory
- •Criteria for good anchor design
- •Aspects of soil mechanics in anchor design
- •Soil classification
- •Fluke/shank angle
- •Fluke area
- •Strength of an anchor design
- •Anchor loads and safety factors
- •Anchor behaviour in the soil
- •Proof loads for high holding power anchors
- •Anchor tests
- •Soil table
- •Practice
- •Introduction
- •Soil survey
- •Pile or anchor
- •Setting the fluke/shank angle
- •Connecting a swivel to the Stevpris anchor
- •Chasers
- •Chaser types
- •Stevpris installation
- •Laying anchors
- •Retrieving anchors
- •Anchor orientation
- •Decking the Stevpris anchor
- •What not to do!
- •Racking the Stevpris
- •Deploying Stevpris from the anchor rack
- •Boarding the anchor in deep water
- •Ballast In fluke
- •Chaser equilibrium
- •Deployment for permanent moorings
- •Piggy-backing
- •Piggy-back methods
- •Stevmanta VLA installation
- •Installation procedure
- •Stevmanta retrieval
- •Double line installation procedure
- •Stevmanta retrieval
- •Double line installation with Stevtensioner
- •The Stevtensioner
- •The working principle of the tensioner
- •Measurement of the tensions applied
- •Umbilical cable and measuring pin
- •Break - link
- •Duration of pretensioning anchors and piles
- •Handling the Stevtensioner
- •General tensioning procedures
- •Hook-up
- •Lowering
- •Tensioning mode
- •Retrieving
- •Supply vessels/anchor handling vessels
- •Product data
- •Introduction
- •Dimensions of vryhof anchor types
- •Proof load test for HHP anchors (US units)
- •Dimensions of vryhof tensioners
- •Proof load/break load of chains (in US units)
- •Chain components and forerunners
- •Connecting links
- •Conversion table
- •Mooring line catenary
- •Mooring line holding capacity
- •Shackles
- •Wire Rope
- •Wire rope sockets
- •Thimbles
- •Synthetic ropes
- •Mooring hawsers
- •Main dimensions chasers
- •Stevin Mk3 UHC chart
- •Stevin Mk3 drag and penetration chart
- •Stevpris Mk5 UHC chart
- •Stevpris Mk5 drag and penetration chart
- •Stevmanta VLA UPC chart
- •Introduction
- •Propulsion system
- •Propellers
- •Thrusters
- •Rudders
- •Manoeuvring
- •Current
- •Wind
- •Other forces
- •Turning point (Pivot point)
- •Ship handling
- •General layout Jack-Up drilling unit:
- •General information about a Semi Submersible drilling unit:
MTC
Anchor Handling Course
4.Testing program for the Triplex Shark Jaw H-700.
Recommended and approved by the Norwegian Maritime Directorate. 4.1. Triplex Shark Jaw.
The Triplex Shark Jaw and central manoeuvring components have been tested by manufacturer with 240 bar oil pressure.
4.2Test without Load.
To be carried out on board after installation and start up.
a)The jaws to be closed and opened separately and simultaneously.
b)The wire lift to be moved to up and down positions.
c)QUICK RELEASE for jaws to be tested with the wire lift down.
d)EMERGENCY RELEASE to be tested when jaws have been locked and the pump is disconnected.
e)Check marks on link joints when Jaws are locked. If marks are not in line the Shark Jaw must be repaired before use.
4.3 Test with Load.
Wire of necessary strength to be locked in the Shark Jaw and a static load test to be carried out by pulling with a load corresponding to the ships bollard pull.
5.General Maintenance
For Triplex Shark Jaw Type H-700
Triplex Guide Pins Type S-300
5.1Accumulators Depressurising
Important!
Before maintenance work on Shark Jaw it is important to empty the accumulators for oil by opening of the ball valve on the power unit.
M:\ANCHOR HANDLING\Course Material\Training Manual New\Chapter 06\1.0 TRIPLEX-Shark Jaws.doc
Chapter 06 |
Page 12 |
MTC
Anchor Handling Course
5.2Shark Jaw Unit
Check regularly before use, that link joints and jaws have no wear and tear or damages that can cause any danger.
All bearings and bolts in all joints should be tight.
Check tightness of all bolts and nuts regularly or minimum two times per year.
The inside of the Shark Jaw housing and the moveable parts must be cleaned regularly.
Lubricate according to the lubricating chart.
Shark Jaw Unit Service / Inspection Safety Device:
Before service or inspection of parts inside the Shark Jaw with the jaws in locked position the jaws must be secured by welding a clamp on top of the Jaws. Remember to remove the clamp before starting pump.
5.3Guide Pins Units
Check torque on bolts for the top hats and guide plates on the lower end of the guide pins, regularly minimum two times per year.
Recommended torque for M24 bolts 10.9 qualities black and oiled is 108 kpm. Recommended torque for M30 bolts 10.9 qualities black and oiled is 175 kpm.
Check and clean regularly the inside of the guide pin housing.
Lubricate according to lubrication chart.
M:\ANCHOR HANDLING\Course Material\Training Manual New\Chapter 06\1.0 TRIPLEX-Shark Jaws.doc
Chapter 06 |
Page 13 |
MTC
Anchor Handling Course
Guide Pins Service / Inspection Safety Device:
Before service or inspection of parts on Guide Pins with the pins in upper position the pins must be secured with a support inside.
Remember to remove the clamp before starting pump.
5.4Hydraulic System
The filter element for the H.P. – and return line filter on power pack have to be changed when indicators show blocked filter or minimum one time per year.
Check regularly all high pressure hoses inside the Shark Jaw and Guide Pins.
Ensure that spare high pressure hydraulic hoses are always carried on board.
Hydraulic oil according to lubrication chart.
M:\ANCHOR HANDLING\Course Material\Training Manual New\Chapter 06\1.0 TRIPLEX-Shark Jaws.doc
Chapter 06 |
Page 14 |
MTC
Anchor Handling Course
5.5Electric System
5.5.1 With Power Switched off.
Tighten every screw connection for electrical termination. Check all cables for damage.
5.5.2 With Power Switched on.
Check that all operations from the control panel are functioning.
The same procedure shall be followed, also for the emergency release box.
5.6Control of Operation with Current from the Emergency Power Supply.
Switch off the automatic fuse inside the junction box and check the operation of the
Shark Jaw from the control panel. Check also the alarm functions.
M:\ANCHOR HANDLING\Course Material\Training Manual New\Chapter 06\1.0 TRIPLEX-Shark Jaws.doc
Chapter 06 |
Page 15 |