- •VOLUME 1 CONTENTS
- •NOTATION
- •ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS
- •EXECUTIVE SUMMARY
- •ES.1 Background
- •ES.2 BLM Proposed Action
- •ES.2.1 BLM Purpose and Need
- •ES.2.2 BLM Scope of Analysis
- •ES.2.3 Applications for Solar Energy Development on BLM Lands
- •ES.2.4 BLM Alternatives
- •ES.2.4.1 Program Elements Common to Both BLM Action Alternatives
- •ES.2.4.3 Solar Energy Zone Program Alternative
- •ES.2.4.4 No Action Alternative
- •ES.2.4.5 Reasonably Foreseeable Solar Energy Development
- •ES.2.4.6 Summary of Impacts of BLM’s Alternatives
- •ES.2.4.7 BLM’s Preferred Alternative
- •ES.3 DOE Proposed Action
- •ES.3.1 DOE Purpose and Need
- •ES.3.2 DOE Scope of Analysis
- •ES.3.3 DOE Alternatives
- •ES.3.3.2 No Action Alternative
- •ES.3.4 Summary of Impacts of DOE’s Alternatives
- •ES.4 Public Involvement, Consultation, and Coordination
- •ES.5 References
- •1 INTRODUCTION
- •1.1 Applicable Federal Orders and Mandates
- •1.1.1 Executive Order 13212
- •1.1.2 Energy Policy Act of 2005
- •1.1.3 Energy Independence and Security Act of 2007
- •1.1.4 DOI Secretarial Order 3285A1
- •1.1.5 Executive Order 13514
- •1.1.6 DOI Secretarial Order 3297
- •1.3 BLM Requirements and Objectives for the PEIS
- •1.3.1 BLM’s Purpose and Need
- •1.3.2 BLM Decisions To Be Made
- •1.3.3 Authorization Process for Solar Energy Development on BLM Lands
- •1.3.3.1 New Applications
- •1.3.3.2 Pending Applications
- •1.3.3.3 Approved Applications
- •1.3.4 BLM Land Use Planning Process
- •1.3.5 BLM Scope of the Analysis
- •1.3.5.1 Program Analysis Versus SEZ-Specific Analysis
- •1.3.6 BLM Planning Criteria
- •1.4 DOE Requirements and Objectives for the PEIS
- •1.4.1 DOE’s Purpose and Need
- •1.4.2 DOE Decisions To Be Made
- •1.4.3 DOE Scope of the Analysis
- •1.5 Cooperating Agencies
- •1.6.1 Renewable Portfolio Standards and Other Regional and State Initiatives
- •1.6.2 Related Initiatives
- •1.6.2.1 Energy Corridor Designation
- •1.6.2.3 California Desert Renewable Energy Conservation Plan
- •1.6.2.4 Arizona Restoration Design Energy Project
- •1.6.2.5 Wind Energy Development PEIS
- •1.6.2.6 Geothermal PEIS
- •1.8 References
- •2.1 Introduction
- •2.2 BLM Alternatives
- •2.2.1 Program Elements Common to Both BLM Action Alternatives
- •2.2.1.1 Right-of-Way Authorization Policies
- •2.2.1.2 Monitoring, Adaptive Management, and Mitigation
- •2.2.1.3 Design Features
- •2.2.1.4 Segregation of Lands with Potential for Solar Development
- •2.2.2.1 Proposed Right-of-Way Exclusion Areas
- •2.2.2.2 Proposed Solar Energy Zones
- •2.2.2.3 Proposed Variance Areas for Utility-Scale Solar Energy Development
- •2.2.2.4 Land Use Plans To Be Amended
- •2.2.3 SEZ Program Alternative
- •2.2.3.1 Proposed Right-of-Way Exclusion Areas
- •2.2.3.2 Proposed Solar Energy Zones
- •2.2.3.3 Solar Energy Zone Policies
- •2.2.3.4 Land Use Plans To Be Amended
- •2.3 DOE Alternatives
- •2.3.1 No Action Alternative
- •2.3.2 Action Alternative—DOE’s Proposed Programmatic Environmental Guidance
- •2.3.2.1 General Mitigation Measures
- •2.3.2.2 Institutional and Public Outreach
- •2.3.2.3 Land Use
- •2.3.2.4 Water Resources and Erosion Control
- •2.3.2.5 Biological Resources
- •2.3.2.6 Air Quality
- •2.3.2.7 Cultural Resources and Native American Interactions
- •2.3.2.8 Visual Resources and Aesthetics
- •2.3.2.9 Socioeconomics
- •2.3.2.10 Environmental Justice
- •2.3.2.11 Safety and Health
- •2.4 Description of Reasonably Foreseeable Development Scenario
- •2.4.1 Comparison of RFDS with Lands Available under the Action Alternatives
- •2.5 Other Alternatives and Issues Considered
- •2.5.1 Distributed Generation
- •2.5.2 Conservation and Demand-Side Management
- •2.5.3 Analysis of Life-Cycle Impacts of Solar Energy Development
- •2.5.4 Analysis of Development on Other Federal, State, or Private Lands
- •2.5.5 Restricting Development to Previously Disturbed Lands
- •2.5.6 Restricting Development to Populated Areas
- •2.5.7 Restricting Development to the Fast-Track Project Applications
- •2.5.8 Analysis of Development on the Maximum Amount of Public Lands Allowable
- •2.5.9 Changes to BLM’s Proposed Solar Energy Zones
- •2.5.10 Other Suggested Alternatives
- •2.5.11 DOE Environmental Requirements
- •2.6 References
- •3.1 Technologies
- •3.2 Development Process Overview for All Technologies
- •3.2.1 Site Characterization
- •3.2.2 Site Preparation and Construction
- •3.2.3 Operations
- •3.2.4 Decommissioning and Reclamation
- •3.2.5 Transmission Facilities
- •3.4 Transportation Considerations
- •3.6 Health and Safety Aspects of Solar Energy Projects
- •3.7 Existing Agency Processes and Guidance
- •3.8 References
- •4 UPDATE TO AFFECTED ENVIRONMENT
- •4.1 Introduction
- •4.2 Lands and Realty
- •4.4 Rangeland Resources
- •4.4.1 Livestock Grazing
- •4.4.2 Wild Horses and Burros
- •4.4.3 Wildland Fire
- •4.5 Recreation
- •4.6 Military and Civilian Aviation
- •4.7 Geologic Setting and Soil Resources
- •4.7.1 Geologic Setting
- •4.7.2 Geologic Hazards
- •4.7.3 Soil Resources
- •4.8 Minerals
- •4.9 Water Resources
- •4.9.1 Surface Water Resources
- •4.9.2 Groundwater Resources
- •4.9.3 Water Rights, Supply, and Use
- •4.10 Ecological Resources
- •4.10.1 Vegetation
- •4.10.2 Wildlife
- •4.10.3 Aquatic Biota
- •4.10.3.1 Pacific Northwest Hydrologic Region
- •4.10.3.2 Lower Colorado, Rio Grande, and Great Basin Hydrologic Regions
- •4.10.3.3 California Hydrologic Region
- •4.10.3.4 Upper Colorado River Hydrologic Region
- •4.10.3.5 Missouri River Basin Hydrologic Region
- •4.10.4 Special Status Species
- •4.11 Air Quality and Climate
- •4.11.3 Update to Section 4.11.2.4 of the Draft Solar PEIS: Visibility Protection
- •4.11.4 Update to Section 4.11.2.5 of the Draft Solar PEIS: General Conformity
- •4.11.5 Addition of New Section 4.11.4: Toxic Dust and Snowmelt
- •4.12 Visual Resources
- •4.13 Acoustic Environment
- •4.14 Paleontological Resources
- •4.15 Cultural Resources
- •4.16 Native American Concerns
- •4.17 Socioeconomics
- •4.18 Environmental Justice
- •4.19 References
- •4.20 Errata to Chapter 4 of the Draft Solar PEIS
- •5.1 Introduction
- •5.2 Lands and Realty
- •5.4 Rangeland Resources
- •5.4.1 Livestock Grazing
- •5.4.2 Wild Horses and Burros
- •5.4.3 Wildland Fire
- •5.5 Recreation
- •5.6 Military and Civilian Aviation
- •5.7 Geologic Setting and Soil Resources
- •5.8 Minerals
- •5.9 Water Resources
- •5.10 Ecological Resources
- •5.10.1 Vegetation
- •5.10.2 Wildlife
- •5.10.3 Aquatic Biota and Habitats
- •5.10.3.1 Common Impacts
- •5.10.3.2 Technology-Specific Impacts
- •5.10.4 Special Status Species
- •5.11 Air Quality and Climate
- •5.11.1 Common Impacts
- •5.11.1.1 Construction: Update to Section 5.11.1.2 of the Draft Solar PEIS
- •5.11.1.2 Operations: Update to Section 5.11.1.3 of the Draft Solar PEIS
- •5.12 Visual Resources
- •5.13 Acoustic Environment
- •5.13.1 Common Impacts
- •5.13.1.1 Construction: Update to Section 5.13.1.2 of the Draft Solar PEIS
- •5.13.1.2 Operations: Update to Section 5.13.1.3 of the Draft Solar PEIS
- •5.14 Paleontological Resources
- •5.15 Cultural Resources
- •5.15.1 Common Impacts
- •5.16 Native American Concerns
- •5.17 Socioeconomics
- •5.18 Environmental Justice
- •5.19 Transportation
- •5.20 Hazardous Materials and Waste
- •5.21 Health and Safety
- •5.22 References
- •5.23 Errata to Chapter 5 of the Draft Solar PEIS
- •6 ANALYSIS OF BLM’S SOLAR ENERGY DEVELOPMENT ALTERNATIVES
- •6.1.2 Minimize Environmental Impacts
- •6.1.3 Minimize Social and Economic Impacts
- •6.1.4 Provide Flexibility to Solar Industry
- •6.1.5 Optimize Existing Transmission Infrastructure and Corridors
- •6.1.6 Standardize and Streamline the Authorization Process
- •6.1.7 Meet Projected Demand for Solar Energy Development
- •6.2 Impacts of the SEZ Program Alternative
- •6.2.2 Minimize Environmental Impacts
- •6.2.3 Minimize Social and Economic Impacts
- •6.2.4 Provide Flexibility to Solar Industry
- •6.2.5 Optimize Existing Transmission Infrastructure and Corridors
- •6.2.6 Standardize and Streamline the Authorization Process
- •6.2.7 Meet Projected Demand for Solar Energy Development
- •6.3 Impacts of the No Action Alternative
- •6.3.2 Minimize Environmental Impacts
- •6.3.3 Minimize Social and Economic Impacts
- •6.3.4 Provide Flexibility to Solar Industry
- •6.3.5 Optimize Existing Transmission Infrastructure and Corridors
- •6.3.6 Standardize and Streamline the Authorization Process
- •6.3.7 Meet Projected Demand for Solar Energy Development
- •6.5 Cumulative Impacts
- •6.5.1 Overview of Activities in the Six-State Study Area
- •6.5.1.1 Energy Production and Distribution
- •6.5.1.2 Other Activities and Trends
- •6.5.2 Cumulative Impact Assessment for Solar Energy Development
- •6.5.2.1 Lands and Realty
- •6.5.2.2 Specially Designated Areas and Lands with Wilderness Characteristics
- •6.5.2.3 Rangeland Resources
- •6.5.2.4 Recreation
- •6.5.2.5 Military and Civilian Aviation
- •6.5.2.6 Geologic Setting and Soil Resources
- •6.5.2.7 Mineral Resources
- •6.5.2.8 Water Resources
- •6.5.2.9 Ecological Resources
- •6.5.2.10 Air Quality and Climate
- •6.5.2.11 Visual Resources
- •6.5.2.12 Acoustic Environment
- •6.5.2.13 Paleontological Resources
- •6.5.2.14 Cultural Resources
- •6.5.2.15 Native American Concerns
- •6.5.2.16 Socioeconomics
- •6.5.2.17 Environmental Justice
- •6.5.2.18 Transportation
- •6.6 Other NEPA Considerations
- •6.6.1 Unavoidable Adverse Impacts
- •6.6.2 Short-Term Use of the Environment and Long-Term Productivity
- •6.6.3 Irreversible and Irretrievable Commitment of Resources
- •6.6.4 Mitigation of Adverse Effects
- •6.7 References
- •7 ANALYSIS OF DOE’S ALTERNATIVES
- •7.1 Impacts of DOE’s Proposed Action
- •7.2 Impacts of the No Action Alternative
- •7.3 Cumulative Impacts
- •7.4 Other NEPA Considerations
- •7.4.1 Unavoidable Adverse Impacts
- •7.4.2 Short-Term Use of the Environment and Long-Term Productivity
- •7.4.3 Irreversible and Irretrievable Commitment of Resources
- •7.4.4 Mitigation of Adverse Effects
- •14.1 Public Scoping and Public Outreach
- •14.2 Government-to-Government Consultation
- •14.3 Coordination of BLM State and Field Offices
- •14.4 Agency Cooperation, Consultation, and Coordination
- •14.5 References
- •15 LIST OF PREPARERS
- •16 GLOSSARY
- •FIGURE ES.2-1 Areas Proposed for Exclusion Since Publication of the Supplement to the Draft Solar PEIS Based on Continued Consultation with Cooperating Agencies and Tribes
- •FIGURE ES.2-4 BLM-Administered Lands in Colorado Available for Application for Solar Energy ROW Authorizations under the BLM Alternatives Considered in This PEIS
- •FIGURE 1.2-2 Solar Direct Normal Insolation Levels in the Southwestern United States
- •FIGURE 2.2-3 BLM-Administered Lands in Colorado Available for Application for Solar Energy ROW Authorizations under the BLM Alternatives Considered in This PEIS
- •FIGURE 2.2-7 Areas Proposed for Exclusion Since Publication of the Supplement to the Draft Solar PEIS Based on Continued Consultation with Cooperating Agencies and Tribes
- •TABLE ES.2-3 Proposed SEZs and Approximate Acreage by State
- •TABLE ES.2-5 Summary-Level Assessment of Potential Environmental Impacts of Utility-Scale Solar Energy Development by Alternative
- •TABLE ES.2-6 Comparison of BLM’s Alternatives with Respect to Objectives for the Agency’s Action
- •TABLE 2.2-3 Proposed SEZs and Approximate Acreage by State
- •TABLE 4.15-3 ACECs Designated for Protection of Cultural Resource Values That Are near BLM-Administered Lands Available for Application through the Variance Process
- •TABLE 6.1-2 Summary-Level Assessment of Potential Environmental Impacts of Utility-Scale Solar Energy Development by Alternative
- •TABLE 6.4-1 Comparison of BLM’s Alternatives with Respect to Objectives for the Agencies’ Action
- •TABLE 6.5-10 Recreational Visits for the BLM and NPS in FY 2000 and FY 2010 and for USFS in FY 2000 and FY 2010
1Under the no action alternative, DOE would continue its existing process for addressing
2environmental concerns for DOE-supported solar projects. It would not adopt programmatic
3 environmental guidance to apply to DOE-supported solar projects. As a result, DOE would not 4 undertake specific efforts to programmatically promote the reduction of environmental impacts 5 of solar energy development or streamline environmental reviews for DOE-supported projects.
6Such achievements, and the potential benefits in terms of increased pace of solar energy
7development and decreased associated costs, might occur under the no action alternative, but
8they would not be programmatically promoted by DOE (by adoption of programmatic
9 environmental guidance with recommended environmental practices and mitigation measures). 10 11
12 ES.4 PUBLIC INVOLVEMENT, CONSULTATION, AND COORDINATION
13
14There has been extensive opportunity for public involvement during the preparation of
15this Solar PEIS. Initially, a Notice of Intent (NOI) to prepare this PEIS was published in
16Volume 73, page 30908 of the Federal Register on May 29, 2008. This notice initiated the first
17scoping period, which lasted from May 29 to July 15, 2008. During that period, the BLM and
18DOE invited the public to provide comments on the scope and objectives of the PEIS, including
19identification of issues and alternatives that should be considered in the PEIS analyses. Public
20meetings were held at 11 locations across the 6 states. Comments were also collected via the
21Solar PEIS project Web site (http://solareis.anl.gov) and by mail. A second scoping period was
22announced through a NOA of Maps and Additional Public Scoping published in the Federal
23Register (Volume 74, page 31307) on June 30, 2009. During this scoping period, the agencies
24solicited comments about environmental issues, existing resource data, and industry interest with
25respect to 24 proposed solar energy study areas (later the terminology was changed to solar
26energy zones, or SEZs). Public comments were collected via the project Web site and by mail.
27It is estimated that approximately 15,900 individuals, organizations, and government agencies
28provided comments during the first scoping process and approximately 300 entities provided
29comments during the second scoping process. The results of the first scoping process were
30documented in a report issued in December 2008 (DOE and BLM 2008). The comments
31received during the second scoping process are summarized in Chapter 14 of the Draft Solar
32PEIS.
33
34After publication of the Draft Solar PEIS in December of 2010, 14 public meetings were
35held in the six-state study area between January and March 2011. More than 86,000 comments
36were received. The public, as well as many cooperating agencies and key stakeholders, offered
37suggestions on how the BLM and DOE could increase the utility of the document, strengthen
38elements of the proposed Solar Energy Program, and increase certainty regarding solar energy
39development on BLM-administered lands. These comments were considered in preparation of
40the Supplement to the Draft Solar PEIS, published in October of 2011. The Agencies held five
41public meetings in the study area between November 2011 and January 2012 to present the new
42information provided in the Supplement. During the public comment period on the Supplement
43to the Draft Solar PEIS, more than 134,000 comments were received.
44
45Comments received on the Solar PEIS documents have largely fallen into several key
46categories: policy; expressions of support or opposition to the alternatives; environmental,
Final Solar PEIS |
ES-44 |
July 2012 |
1 |
socioeconomic, and siting concerns; technology; stakeholder involvement; cumulative impact |
2 |
analyses; impact mitigation; coordination with ongoing regional, state, and local planning |
3 |
efforts; and information on resources present in and around the SEZs. |
4 |
|
5 |
In addition to public scoping, the BLM initiated government-to-government consultation |
6with 316 tribes, chapters, and bands with a potential interest in solar energy development on
7BLM-administered lands in the six-state study area. The BLM also is coordinating with
8 appropriate agencies in accordance with the requirements of Section 106 of the NHPA and 9 Section 7 of the ESA.
10
11Nineteen federal, state, and local government agencies, identified in Section 1.5, are
12working with the BLM and DOE as cooperating agencies. As cooperators, these agencies have
13been involved in the development of the Draft Solar PEIS, the Supplement to the Draft Solar
14PEIS, and the Final Solar PEIS.
15
16All the documents published by the Agencies in connection with this Solar PEIS
17(e.g., the Draft and Final Solar PEIS and the Supplement to the Draft; existing applicable
18BLM policies; and Federal Register notices) are available on the Solar PEIS project Web
19site (http://solareis.anl.gov), along with supporting maps and geospatial data.
20
21
22 ES.5 REFERENCES
23
24Note to Reader: This list of references identifies Web pages and associated URLs where
25reference data were obtained for the analyses presented in this Final Solar PEIS. It is likely that
26at the time of publication of this Final Solar PEIS, some of these Web pages may no longer be
27available or their URL addresses may have changed. The original information has been retained
28and is available through the Public Information Docket for this Final Solar PEIS.
29
30BLM (Bureau of Land Management), 2005, Land Use Planning Handbook, H-1601-1,
31U.S. Department of the Interior, Bureau of Land Management, Washington, D.C., March.
33BLM and DOE (BLM and U.S. Department of Energy), 2010, Draft Programmatic
34Environmental Impact Statement for Solar Energy Development in Six Southwestern States,
35 DES 10-59, DOE/EIS-0403, Dec.
36
37BLM and DOE, 2011, Supplement to the Draft Programmatic Environmental Impact Statement
38for Solar Energy Development in Six Southwestern States, DES 11-49, DOE/EIS-0403D-S, Oct.
40DOE and BLM, 2008, Summary of Public Scoping Comments Received during the Scoping
41Period for the Solar Energy Development Programmatic Environmental Impact Statement,
42Washington, D.C., Oct.
44Secretary of the Interior, 2010, “Renewable Energy Development by the Department of the
45Interior,” Amendment No. 1 to Secretarial Order 3285, Feb. 22. Available at http://elips.doi.gov/
46app_so/act_getfiles.cfm?order_number=3285A1.
Final Solar PEIS |
ES-45 |
July 2012 |
1
2
3
4
5
6
7
8
9
10
11
12
13 This page intentionally left blank.
14
Final Solar PEIS |
ES-46 |
July 2012 |
