1 program elements adopted via planning-level decisions will provide the basis for future project-

2specific utility-scale solar energy development decisions. The Solar PEIS appropriately evaluates

3the potential direct, indirect, and cumulative environmental, social, and economic effects of

4 establishing broad Solar Energy Program elements and strategies across the six-state study area. 5 Because the proposed program involves environmental effects over a broad geographic and time 6 horizon, the depth and detail of the impact analysis are fairly general, focusing on major impacts 7 in a qualitative manner.

8

9In addition to the programmatic analysis described above, the Solar PEIS also provides

10in-depth data collection and environmental analysis for proposed SEZs. The primary purpose

11of this more rigorous analysis is to provide documentation from which the BLM can tier future

12project authorizations, thereby limiting the required scope and effort of project-specific NEPA

13analyses. The BLM will complete a site-specific environmental review of all solar energy

14ROW applications in accordance with NEPA prior to issuing a ROW authorization. All future

15projects proposed in SEZs will tier to the analysis in the Solar PEIS. The extent of this tiering,

16however, will vary from project to project, as will the necessary level of NEPA documentation

17(see Section 2.2.2.2.2 on the environmental review process for projects in SEZs).

18

19

20 1.3.6 BLM Planning Criteria

21

22Planning criteria are the constraints, standards, and guidelines that determine what the

23BLM will or will not consider during its planning process. As such, they establish parameters

24and help focus the structure and preparation of the PEIS. The following are the planning criteria

25that were considered during preparation of this PEIS:

26

 

27

• The BLM will prepare RMP amendments in compliance with FLPMA, the

28

ESA, the Clean Water Act (CWA), the Clean Air Act (CAA), NEPA, and all

29

other applicable laws, E.O.s, and BLM management policies.

30

 

31

• The BLM will use the PEIS as the analytical basis for any decision it makes

32

to amend these RMPs.

33

 

34

• The BLM will develop a reasonably foreseeable development scenario

35

(RFDS) to predict future levels of development. It will identify lands available

36

for utility-scale solar energy development, lands available for utility-scale

37

solar energy development that have restrictive stipulations, and lands not

38

available for utility-scale solar energy development in affected plans.

39

 

40

• The BLM will limit its amendment of these plans to utility-scale solar energy

41

development and will not address the management of other resources,

42

although the BLM will consider and analyze the impacts from increased use

43

on other managed resource values.

44

 

Final Solar PEIS

1-18

July 2012