- •VOLUME 1 CONTENTS
- •NOTATION
- •ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS
- •EXECUTIVE SUMMARY
- •ES.1 Background
- •ES.2 BLM Proposed Action
- •ES.2.1 BLM Purpose and Need
- •ES.2.2 BLM Scope of Analysis
- •ES.2.3 Applications for Solar Energy Development on BLM Lands
- •ES.2.4 BLM Alternatives
- •ES.2.4.1 Program Elements Common to Both BLM Action Alternatives
- •ES.2.4.3 Solar Energy Zone Program Alternative
- •ES.2.4.4 No Action Alternative
- •ES.2.4.5 Reasonably Foreseeable Solar Energy Development
- •ES.2.4.6 Summary of Impacts of BLM’s Alternatives
- •ES.2.4.7 BLM’s Preferred Alternative
- •ES.3 DOE Proposed Action
- •ES.3.1 DOE Purpose and Need
- •ES.3.2 DOE Scope of Analysis
- •ES.3.3 DOE Alternatives
- •ES.3.3.2 No Action Alternative
- •ES.3.4 Summary of Impacts of DOE’s Alternatives
- •ES.4 Public Involvement, Consultation, and Coordination
- •ES.5 References
- •1 INTRODUCTION
- •1.1 Applicable Federal Orders and Mandates
- •1.1.1 Executive Order 13212
- •1.1.2 Energy Policy Act of 2005
- •1.1.3 Energy Independence and Security Act of 2007
- •1.1.4 DOI Secretarial Order 3285A1
- •1.1.5 Executive Order 13514
- •1.1.6 DOI Secretarial Order 3297
- •1.3 BLM Requirements and Objectives for the PEIS
- •1.3.1 BLM’s Purpose and Need
- •1.3.2 BLM Decisions To Be Made
- •1.3.3 Authorization Process for Solar Energy Development on BLM Lands
- •1.3.3.1 New Applications
- •1.3.3.2 Pending Applications
- •1.3.3.3 Approved Applications
- •1.3.4 BLM Land Use Planning Process
- •1.3.5 BLM Scope of the Analysis
- •1.3.5.1 Program Analysis Versus SEZ-Specific Analysis
- •1.3.6 BLM Planning Criteria
- •1.4 DOE Requirements and Objectives for the PEIS
- •1.4.1 DOE’s Purpose and Need
- •1.4.2 DOE Decisions To Be Made
- •1.4.3 DOE Scope of the Analysis
- •1.5 Cooperating Agencies
- •1.6.1 Renewable Portfolio Standards and Other Regional and State Initiatives
- •1.6.2 Related Initiatives
- •1.6.2.1 Energy Corridor Designation
- •1.6.2.3 California Desert Renewable Energy Conservation Plan
- •1.6.2.4 Arizona Restoration Design Energy Project
- •1.6.2.5 Wind Energy Development PEIS
- •1.6.2.6 Geothermal PEIS
- •1.8 References
- •2.1 Introduction
- •2.2 BLM Alternatives
- •2.2.1 Program Elements Common to Both BLM Action Alternatives
- •2.2.1.1 Right-of-Way Authorization Policies
- •2.2.1.2 Monitoring, Adaptive Management, and Mitigation
- •2.2.1.3 Design Features
- •2.2.1.4 Segregation of Lands with Potential for Solar Development
- •2.2.2.1 Proposed Right-of-Way Exclusion Areas
- •2.2.2.2 Proposed Solar Energy Zones
- •2.2.2.3 Proposed Variance Areas for Utility-Scale Solar Energy Development
- •2.2.2.4 Land Use Plans To Be Amended
- •2.2.3 SEZ Program Alternative
- •2.2.3.1 Proposed Right-of-Way Exclusion Areas
- •2.2.3.2 Proposed Solar Energy Zones
- •2.2.3.3 Solar Energy Zone Policies
- •2.2.3.4 Land Use Plans To Be Amended
- •2.3 DOE Alternatives
- •2.3.1 No Action Alternative
- •2.3.2 Action Alternative—DOE’s Proposed Programmatic Environmental Guidance
- •2.3.2.1 General Mitigation Measures
- •2.3.2.2 Institutional and Public Outreach
- •2.3.2.3 Land Use
- •2.3.2.4 Water Resources and Erosion Control
- •2.3.2.5 Biological Resources
- •2.3.2.6 Air Quality
- •2.3.2.7 Cultural Resources and Native American Interactions
- •2.3.2.8 Visual Resources and Aesthetics
- •2.3.2.9 Socioeconomics
- •2.3.2.10 Environmental Justice
- •2.3.2.11 Safety and Health
- •2.4 Description of Reasonably Foreseeable Development Scenario
- •2.4.1 Comparison of RFDS with Lands Available under the Action Alternatives
- •2.5 Other Alternatives and Issues Considered
- •2.5.1 Distributed Generation
- •2.5.2 Conservation and Demand-Side Management
- •2.5.3 Analysis of Life-Cycle Impacts of Solar Energy Development
- •2.5.4 Analysis of Development on Other Federal, State, or Private Lands
- •2.5.5 Restricting Development to Previously Disturbed Lands
- •2.5.6 Restricting Development to Populated Areas
- •2.5.7 Restricting Development to the Fast-Track Project Applications
- •2.5.8 Analysis of Development on the Maximum Amount of Public Lands Allowable
- •2.5.9 Changes to BLM’s Proposed Solar Energy Zones
- •2.5.10 Other Suggested Alternatives
- •2.5.11 DOE Environmental Requirements
- •2.6 References
- •3.1 Technologies
- •3.2 Development Process Overview for All Technologies
- •3.2.1 Site Characterization
- •3.2.2 Site Preparation and Construction
- •3.2.3 Operations
- •3.2.4 Decommissioning and Reclamation
- •3.2.5 Transmission Facilities
- •3.4 Transportation Considerations
- •3.6 Health and Safety Aspects of Solar Energy Projects
- •3.7 Existing Agency Processes and Guidance
- •3.8 References
- •4 UPDATE TO AFFECTED ENVIRONMENT
- •4.1 Introduction
- •4.2 Lands and Realty
- •4.4 Rangeland Resources
- •4.4.1 Livestock Grazing
- •4.4.2 Wild Horses and Burros
- •4.4.3 Wildland Fire
- •4.5 Recreation
- •4.6 Military and Civilian Aviation
- •4.7 Geologic Setting and Soil Resources
- •4.7.1 Geologic Setting
- •4.7.2 Geologic Hazards
- •4.7.3 Soil Resources
- •4.8 Minerals
- •4.9 Water Resources
- •4.9.1 Surface Water Resources
- •4.9.2 Groundwater Resources
- •4.9.3 Water Rights, Supply, and Use
- •4.10 Ecological Resources
- •4.10.1 Vegetation
- •4.10.2 Wildlife
- •4.10.3 Aquatic Biota
- •4.10.3.1 Pacific Northwest Hydrologic Region
- •4.10.3.2 Lower Colorado, Rio Grande, and Great Basin Hydrologic Regions
- •4.10.3.3 California Hydrologic Region
- •4.10.3.4 Upper Colorado River Hydrologic Region
- •4.10.3.5 Missouri River Basin Hydrologic Region
- •4.10.4 Special Status Species
- •4.11 Air Quality and Climate
- •4.11.3 Update to Section 4.11.2.4 of the Draft Solar PEIS: Visibility Protection
- •4.11.4 Update to Section 4.11.2.5 of the Draft Solar PEIS: General Conformity
- •4.11.5 Addition of New Section 4.11.4: Toxic Dust and Snowmelt
- •4.12 Visual Resources
- •4.13 Acoustic Environment
- •4.14 Paleontological Resources
- •4.15 Cultural Resources
- •4.16 Native American Concerns
- •4.17 Socioeconomics
- •4.18 Environmental Justice
- •4.19 References
- •4.20 Errata to Chapter 4 of the Draft Solar PEIS
- •5.1 Introduction
- •5.2 Lands and Realty
- •5.4 Rangeland Resources
- •5.4.1 Livestock Grazing
- •5.4.2 Wild Horses and Burros
- •5.4.3 Wildland Fire
- •5.5 Recreation
- •5.6 Military and Civilian Aviation
- •5.7 Geologic Setting and Soil Resources
- •5.8 Minerals
- •5.9 Water Resources
- •5.10 Ecological Resources
- •5.10.1 Vegetation
- •5.10.2 Wildlife
- •5.10.3 Aquatic Biota and Habitats
- •5.10.3.1 Common Impacts
- •5.10.3.2 Technology-Specific Impacts
- •5.10.4 Special Status Species
- •5.11 Air Quality and Climate
- •5.11.1 Common Impacts
- •5.11.1.1 Construction: Update to Section 5.11.1.2 of the Draft Solar PEIS
- •5.11.1.2 Operations: Update to Section 5.11.1.3 of the Draft Solar PEIS
- •5.12 Visual Resources
- •5.13 Acoustic Environment
- •5.13.1 Common Impacts
- •5.13.1.1 Construction: Update to Section 5.13.1.2 of the Draft Solar PEIS
- •5.13.1.2 Operations: Update to Section 5.13.1.3 of the Draft Solar PEIS
- •5.14 Paleontological Resources
- •5.15 Cultural Resources
- •5.15.1 Common Impacts
- •5.16 Native American Concerns
- •5.17 Socioeconomics
- •5.18 Environmental Justice
- •5.19 Transportation
- •5.20 Hazardous Materials and Waste
- •5.21 Health and Safety
- •5.22 References
- •5.23 Errata to Chapter 5 of the Draft Solar PEIS
- •6 ANALYSIS OF BLM’S SOLAR ENERGY DEVELOPMENT ALTERNATIVES
- •6.1.2 Minimize Environmental Impacts
- •6.1.3 Minimize Social and Economic Impacts
- •6.1.4 Provide Flexibility to Solar Industry
- •6.1.5 Optimize Existing Transmission Infrastructure and Corridors
- •6.1.6 Standardize and Streamline the Authorization Process
- •6.1.7 Meet Projected Demand for Solar Energy Development
- •6.2 Impacts of the SEZ Program Alternative
- •6.2.2 Minimize Environmental Impacts
- •6.2.3 Minimize Social and Economic Impacts
- •6.2.4 Provide Flexibility to Solar Industry
- •6.2.5 Optimize Existing Transmission Infrastructure and Corridors
- •6.2.6 Standardize and Streamline the Authorization Process
- •6.2.7 Meet Projected Demand for Solar Energy Development
- •6.3 Impacts of the No Action Alternative
- •6.3.2 Minimize Environmental Impacts
- •6.3.3 Minimize Social and Economic Impacts
- •6.3.4 Provide Flexibility to Solar Industry
- •6.3.5 Optimize Existing Transmission Infrastructure and Corridors
- •6.3.6 Standardize and Streamline the Authorization Process
- •6.3.7 Meet Projected Demand for Solar Energy Development
- •6.5 Cumulative Impacts
- •6.5.1 Overview of Activities in the Six-State Study Area
- •6.5.1.1 Energy Production and Distribution
- •6.5.1.2 Other Activities and Trends
- •6.5.2 Cumulative Impact Assessment for Solar Energy Development
- •6.5.2.1 Lands and Realty
- •6.5.2.2 Specially Designated Areas and Lands with Wilderness Characteristics
- •6.5.2.3 Rangeland Resources
- •6.5.2.4 Recreation
- •6.5.2.5 Military and Civilian Aviation
- •6.5.2.6 Geologic Setting and Soil Resources
- •6.5.2.7 Mineral Resources
- •6.5.2.8 Water Resources
- •6.5.2.9 Ecological Resources
- •6.5.2.10 Air Quality and Climate
- •6.5.2.11 Visual Resources
- •6.5.2.12 Acoustic Environment
- •6.5.2.13 Paleontological Resources
- •6.5.2.14 Cultural Resources
- •6.5.2.15 Native American Concerns
- •6.5.2.16 Socioeconomics
- •6.5.2.17 Environmental Justice
- •6.5.2.18 Transportation
- •6.6 Other NEPA Considerations
- •6.6.1 Unavoidable Adverse Impacts
- •6.6.2 Short-Term Use of the Environment and Long-Term Productivity
- •6.6.3 Irreversible and Irretrievable Commitment of Resources
- •6.6.4 Mitigation of Adverse Effects
- •6.7 References
- •7 ANALYSIS OF DOE’S ALTERNATIVES
- •7.1 Impacts of DOE’s Proposed Action
- •7.2 Impacts of the No Action Alternative
- •7.3 Cumulative Impacts
- •7.4 Other NEPA Considerations
- •7.4.1 Unavoidable Adverse Impacts
- •7.4.2 Short-Term Use of the Environment and Long-Term Productivity
- •7.4.3 Irreversible and Irretrievable Commitment of Resources
- •7.4.4 Mitigation of Adverse Effects
- •14.1 Public Scoping and Public Outreach
- •14.2 Government-to-Government Consultation
- •14.3 Coordination of BLM State and Field Offices
- •14.4 Agency Cooperation, Consultation, and Coordination
- •14.5 References
- •15 LIST OF PREPARERS
- •16 GLOSSARY
- •FIGURE ES.2-1 Areas Proposed for Exclusion Since Publication of the Supplement to the Draft Solar PEIS Based on Continued Consultation with Cooperating Agencies and Tribes
- •FIGURE ES.2-4 BLM-Administered Lands in Colorado Available for Application for Solar Energy ROW Authorizations under the BLM Alternatives Considered in This PEIS
- •FIGURE 1.2-2 Solar Direct Normal Insolation Levels in the Southwestern United States
- •FIGURE 2.2-3 BLM-Administered Lands in Colorado Available for Application for Solar Energy ROW Authorizations under the BLM Alternatives Considered in This PEIS
- •FIGURE 2.2-7 Areas Proposed for Exclusion Since Publication of the Supplement to the Draft Solar PEIS Based on Continued Consultation with Cooperating Agencies and Tribes
- •TABLE ES.2-3 Proposed SEZs and Approximate Acreage by State
- •TABLE ES.2-5 Summary-Level Assessment of Potential Environmental Impacts of Utility-Scale Solar Energy Development by Alternative
- •TABLE ES.2-6 Comparison of BLM’s Alternatives with Respect to Objectives for the Agency’s Action
- •TABLE 2.2-3 Proposed SEZs and Approximate Acreage by State
- •TABLE 4.15-3 ACECs Designated for Protection of Cultural Resource Values That Are near BLM-Administered Lands Available for Application through the Variance Process
- •TABLE 6.1-2 Summary-Level Assessment of Potential Environmental Impacts of Utility-Scale Solar Energy Development by Alternative
- •TABLE 6.4-1 Comparison of BLM’s Alternatives with Respect to Objectives for the Agencies’ Action
- •TABLE 6.5-10 Recreational Visits for the BLM and NPS in FY 2000 and FY 2010 and for USFS in FY 2000 and FY 2010
1for projects proposed within SEZs, would reduce the cost to the government, developers, and
2 stakeholders. These outcomes would likely increase the agency’s ability to meet the mandates of 3 the Energy Policy Act of 2005 and Secretarial Order 3285A1 (Secretary of the Interior 2010).
4
5
6 6.1.2 Minimize Environmental Impacts
7
8Utility-scale solar energy facilities are industrial facilities that require large tracts of land
9up to several thousand acres and can cause substantial impacts on a variety of natural and
10cultural resources. Proper consultation, siting and design, and application of design features can
11avoid, minimize, or mitigate many of these impacts. The proposed ROW authorization policies
12updated as part of this Final Solar PEIS and the required design features under the program
13alternative would ensure that potential environmental impacts are addressed thoroughly and
14consistently for all utility-scale solar energy projects on BLM-administered lands. Specific
15program elements have been developed to address the many aspects of managing environmental
16impacts, as follows:
17 |
|
18 |
• The elements of the proposed Solar Energy Program establish numerous |
19 |
requirements for coordination and/or consultation with other federal and state |
20 |
agencies and for government-to-government consultation, and establish |
21 |
requirements for public involvement. Collectively, these policies ensure that |
22 |
all projects are thoroughly reviewed; input is collected from all potentially |
23 |
affected federal, state, tribal, and local stakeholders; and any project proposals |
24 |
that are anticipated to result in unacceptable adverse impacts are eliminated |
25 |
early in the application process and SEZ identification process. |
26 |
|
27 |
• The proposed ROW exclusions would avoid impacts of utility-scale solar |
28 |
energy development on known sensitive resources, resource uses, and |
29 |
specially designated areas. |
30 |
|
31 |
• By restricting development to lands with solar insolation levels greater than or |
32 |
equal to 6.5 kWh/m2/day, the BLM would be making available those lands |
33 |
where utility-scale development is assumed to be most efficient. These |
34 |
proposed restrictions allow the BLM to support the highest and best use of |
35 |
public lands in accordance with FLPMA by avoiding potential resource |
36 |
conflicts and reserving for other uses public lands that are not well suited for |
37 |
utility-scale solar energy development.7 |
38 |
|
39 |
• The proposed programmatic design features, developed on the basis of |
40 |
extensive impact analyses conducted in the Solar PEIS, address the full array |
41 |
of potential impacts associated with each phase of development (i.e., site |
7Under BLM’s proposed Solar Energy Program, areas with direct normal solar insolation levels less than 6.5 kWh/m2/day would not be available for individual applications (i.e., excluded). In light of expected
technological advances, shifting market conditions and evolving state and Federal policies however, the BLM will allow new SEZs in areas with insolation levels lower 6.5 kWh/m2/day as appropriate.
Final Solar PEIS |
6-19 |
July 2012 |
1 |
evaluation, construction, operation, and decommissioning). For many project |
2 |
locations, the majority of potential impacts would be addressed by these |
3 |
requirements. Individual project environmental reviews would be required to |
4 |
address any additional site-specific and species-specific issues and concerns. |
5 |
|
6• The proposed variance process would provide flexibility to industry to request
7 |
utility-scale solar development projects outside of SEZs in areas determined to |
8 |
be economically and technically viable. Projects in variance areas would be |
9 |
thoroughly reviewed through the proposed variance process to ensure that |
10 |
only those applications which can demonstrate that they are in an area with |
11 |
low or comparatively low resource conflicts and where conflicts can be |
12 |
resolved will be processed. BLM staff will be required to coordinate with |
13 |
federal, state, tribal, and local stakeholders as part of the review of ROW |
14 |
applications in variance areas. Analysis of an application may result in a |
15 |
decision to deny the application. |
16 |
|
17 |
• By allowing appropriate development in variance areas, the BLM would |
18 |
provide opportunities to site solar energy projects on lands that are, or are near |
19 |
to, degraded, disturbed, or previously disturbed sites. |
20 |
|
21 |
• The prioritization of development in SEZs could limit some environmental |
22 |
impacts. These areas were selected as lands well suited for utility-scale solar |
23 |
development (i.e., lands with fewer potential resource conflicts). Although |
24 |
some potentially significant resource and resource use conflicts have been |
25 |
discovered for some SEZs, SEZ-specific design features have been identified |
26 |
to address those potential impacts. The concentration of development in the |
27 |
SEZs could also allow for the consolidation of related infrastructure |
28 |
(e.g., roads, transmission lines) and less total land disturbance. |
29 |
|
30 |
• The proposed monitoring and adaptive management strategy would ensure |
31 |
that new data and lessons learned about the impacts of solar energy |
32 |
development are incorporated into future programmatic and project-specific |
33 |
requirements. |
34 |
|
35 |
• Implementing a comprehensive program would allow the BLM to better |
36 |
assess potential cumulative impacts of solar energy development across the |
37 |
six-state study area over time. |
38 |
|
39 |
• A program that would facilitate solar energy development on BLM- |
40 |
administered lands (as compared to private lands) would ensure that the |
41 |
development would be subjected to rigorous environmental review, including |
42 |
a thorough public involvement process. |
43 |
|
44Table 6.1-2 includes a summary of the environmental impacts that might be associated
45with solar energy development under the program alternative and the ways in which the impacts
46would be avoided, minimized, and/or mitigated by the programmatic exclusions, policies, and
Final Solar PEIS |
6-20 |
July 2012 |
1 design features. As reflected in that table, for several resource and impact areas, implementation 2 of the proposed design features is expected to ensure that impacts would be negligible or minor.
3For certain resource areas (e.g., hazardous materials and waste, health and safety), there are few,
4if any, unique siteor project-specific issues that would not be fully addressed by the
5 programmatic requirements. For other resource areas (e.g., lands and realty, rangeland resources, 6 military and civilian aviation, geologic setting and soils, mineral resources, air quality, acoustic 7 environment, paleontological resources, and transportation), the programmatic requirements are 8 comprehensive and broad enough to address most issues even though there could be some site-
9and project-specific variables. For example, although paleontological resources vary in
10occurrence and density by site, impacts on these resources can be mitigated, and the design
11feature would ensure that potential impacts are identified and addressed. Similarly, although
12traffic patterns and local road use vary by location, the design features would ensure that local
13issues are identified and addressed.
14
15For other resource and impact areas, the full effectiveness of the proposed design features
16intended to reduce potential impacts may need to be assessed through the additional project-
17specific analyses that would be required under the proposed program. These resource areas will
18vary by project, but may include specially designated areas and lands with wilderness
19characteristics, recreation, military aviation, water resources, vegetation, wildlife and aquatic
20biota, special status species, visual resources, cultural resources, Native American concerns, and
21environmental justice. For example, the magnitude of potential impacts of a given project on
22water resources would depend on project-specific parameters and site-specific conditions. The
23water requirements would depend on the size of the project and the technology used (e.g., CSP
24versus PV, and wet cooling versus dry cooling systems). The nature of the impacts would depend
25on the amount of locally and regionally available water, the source of water supply, and other
26water uses, including requirements to support sensitive species and/or their critical habitats.
27These types of impacts cannot be assessed fully until projectand site-specific information is
28known.
29
30BLM’s intent in identifying SEZs has been to find areas well suited to utility-scale solar
31energy production, with few impediments to solar facility construction and operation, where the
32BLM would prioritize solar energy and associated transmission infrastructure development. In
33identifying the SEZs evaluated in the Draft Solar PEIS, the BLM targeted areas with low slope,
34near existing transmission or designated corridors and near existing roads, and with a minimum
35area of 2,500 acres (10 km2). The SEZs also were subject to all the exclusion criteria listed in
36Table 2.2-2 of this Final Solar PEIS that are applicable for variance lands (e.g., solar and
37insolation criteria, and exclusion of NLCS lands, critical and sensitive habitat, ACECs, no
38surface occupancy areas, ROW exclusion and avoidance areas from applicable land use plans).8
40Through the SEZ-specific analyses completed as part of the Draft Solar PEIS, the BLM
41has discovered some potentially significant impacts on various resources and resource uses that
8Although these classes of lands will be excluded from the proposed SEZs, some may not yet have been identified because of incomplete information on the locations of these areas and incomplete GIS data. Additional applicable non-development areas within SEZs may be identified during project-specific investigations when additional data have been collected.
Final Solar PEIS |
6-21 |
July 2012 |
1 could result from solar energy development in the SEZs as proposed in the Draft Solar PEIS. The 2 modifications made to the SEZs through the Supplement to the Draft Solar PEIS and this Final
3 Solar PEIS (i.e., dropping SEZs from further consideration, reducing the area of other SEZs, and
4identifying non-development areas within SEZs), along with implementation of ROW
5authorization policies and design features, would minimize environmental impacts of
6 development in the SEZs. The BLM has also proposed SEZ-specific design features that would 7 further avoid and/or minimize potential impacts in these areas. These additional requirements 8 could result in more restrictions in the amount of developable land within some SEZs.
9
10It is anticipated that these program elements would collectively allow the BLM to
11effectively identify and avoid, mitigate, and minimize potential adverse environmental impacts.
14 6.1.3 Minimize Social and Economic Impacts
15
16Utility-scale solar energy development under this alternative is expected to result in
17economic benefits in terms of both jobs and income created. These benefits would occur as both
18direct impacts, resulting from the wages and salaries, procurement of goods and services, and
19collection of state sales and income taxes, and indirect impacts, resulting from new jobs, income,
20expenditures, and tax revenues subsequently created as the direct impacts circulate through the
21economy. These benefits occur during both the construction and operations phases, with the
22construction phase benefits being temporary and the operations phase benefits being more long
23term. The specific benefits vary by technology, because some technologies generate more jobs
24than other technologies. For example, a 100-MW parabolic trough facility would create an
25estimated 350 new direct construction jobs and 43 new direct operations jobs, whereas a PV
26facility of comparable generation capacity would create an estimated 30 new direct construction
27jobs and very few direct operations jobs (see Tables 5.17.2-1 through 5.17.2-4 in the Draft Solar
28PEIS for detailed information about the economic impacts of construction and operation of solar
29energy facilities by technology type).9 The benefits in terms of indirect jobs and total income
30also vary by state, because the extent of in-state spending and economic multiplier effects vary
31by state.
32
33Because utility-scale solar energy development would be accompanied by transmission
34system development and new access road construction in many locations, potential economic
35benefits also result from the direct and indirect jobs associated with this infrastructure
36construction. These impacts are discussed in Section 5.17.1.2 of the Draft Solar PEIS.
37
38The BLM would incur agency-related costs associated with developing, implementing,
39and managing solar energy development on BLM-administered lands. This is particularly true in
40SEZs where the BLM has committed to undertaking upfront site-specific analyses and
41consultations as well as incentives. In contrast, a substantial portion of the costs for processing
42ROW applications in variance areas, including environmental review requirements, would be
43paid for by developers through cost recovery. For all projects on BLM-administered lands, the
9The estimate provided in the text here for number of PV construction jobs is based on an extrapolation of data in Table 5.17.2-4 of the Draft Solar PEIS.
Final Solar PEIS |
6-22 |