ASME B31.1 INTERPRETATIONS VOLUME 45

ASME B31.1

INTERPRETATIONS VOLUME 45

Replies to Technical Inquiries

January 1, 2009 Through December 31, 2009

FOREWORD

It has been agreed to publish interpretations issued by the B31 Committee concerning B31.1 as part of the update service to the Code. The interpretations have been assigned numbers in chronological order. Each interpretation applies either to the latest Edition at the time of issuance of the interpretation or the Edition or Addenda stated in the reply. Subsequent revisions to the Code may have superseded the reply.

The replies are taken verbatim from the original letters, except for a few typographical and editorial corrections made for the purpose of improved clarity. In some instances, a review of the interpretation revealed a need for corrections of a technical nature. In these cases, a revised reply bearing the original interpretation number with the suffix R is presented. In the case where an interpretation is corrected by errata, the original interpretation number with the suffix E is used.

ASME procedures provide for reconsideration of these interpretations when or if additional information is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the Statement of Policy in the Code documents, ASME does not Òapprove,Ó Òcertify,Ó Òrate,Ó or ÒendorseÓ any item, construction, proprietary device, or activity.

I-1 --`,,```````,,```,`,`,,,,`,`,`,`-`-`,,`,,`,`,,`---

Copyright ASME International

Provided by IHS under license with ASME

No reproduction or networking permitted without license from IHS

ASME B31.1 INTERPRETATIONS VOLUME 45

B31.1

Subject

 

 

Interpretation

 

File No.

Definition of Sustained Pressure, Minimum Wall Thickness Calculation. . . . . . . .

45-2

06-1432

Para. 101.7.2, Expansion Joints. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

45-1

07-1440

Para. 104.8.1, Pipe Nominal Wall Thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

45-4

08-1793

Para. 122.3.2(b), Instrument Piping Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

45-3

08-672

Para. 131.6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

45-6

09-818

Table 121.5, General Note (c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

45-7

09-971

Table 136.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

45-5

08-1755

I-2

--`,,```````,,```,`,`,,,,`,`,`,`-`-`,,`,,`,`,,`---

Copyright ASME International

Provided by IHS under license with ASME

No reproduction or networking permitted without license from IHS

---`,,`,,`,`,,`-`-`,,```````,,```,`,`,,,,`,`,`,`--

ASME B31.1 INTERPRETATIONS VOLUME 45

Interpretation: 45-1

Subject: B31.1-2007, Para 101.7.2, Expansion Joints

Date Issued: January 27, 2009

File: 07-1440

Question: Since para. 101.7.2 excludes bellows, slip, or sleeve type expansion joints from use in any piping system connecting the boiler and the first stop valve, are other types of expansion joints excluded?

Reply: No.

Interpretation: 45-2

Subject: B31.1-2004, Definition of Sustained Pressure, Minimum Wall Thickness Calculation

Date Issued: February 6, 2009

File: 06-1432

Question (1): Is Òmaximum sustained pressureÓ referenced in para. 122.13 referring to the Òmaximum sustained operating pressureÓ exerted by the pump as described in para. 101.2.2?

Reply (1): Yes.

Question (2): When determining the value of P to be used in the minimum wall thickness equations of para. 104.1.2, is it acceptable for the designer to take into account automated protection devices, such as safety/relief valves, to reduce the piping design pressure?

Reply (2): Yes.

Interpretation: 45-3

Subject: B31.1-2007, Para. 122.3.2(B), Instrument Piping Valves

Date Issued: April 13, 2009

File: 08-672

Question: Is it the requirement of para. 122.3.2(B.2.2) of the 2007 Edition of ASME B31.1, when blowdown valves are used, that the rating of the valves at the instrument be equal to 1.5 times the design pressure of the piping system at 100¡F and need not exceed the rating of the blowdown valves?

Reply: Yes.

I-3

Copyright ASME International

Provided by IHS under license with ASME

No reproduction or networking permitted without license from IHS

---`,,`,,`,`,,`-`-`,,```````,,```,`,`,,,,`,`,`,`--

ASME B31.1 INTERPRETATIONS VOLUME 45

Interpretation: 45-4

Subject: Para. 104.8.1, Pipe Nominal Wall Thickness

Date Issued: May 26, 2009

File: 08-1793

Question: Should the pipe nominal wall thickness without deduction for mechanical, corrosion, and erosion allowance be used for the calculation of the section modulus to determine the longitudinal stress due to weight and other sustained mechanical loads in para. 104.8.1, eq. (11)?

Reply: Yes.

Interpretation: 45-5

Subject: Table 136.4

Date Issued: July 1, 2009

File: 08-1755

Question (1): When the requirements of General Note (a) of Table 136.4 have been met, is 100% RT or UT required for all butt welds greater than NPS 2 with design temperatures over 750¡F?

Reply (1): Yes.

Question (2): When the requirements of General Note (a) of Table 136.4 have been met, is 100% RT or UT required for all butt welds greater than NPS 2 and thickness over 3Ú4 in. with design temperatures between 350¡F and 750¡F and pressures in excess of 1,025 psig?

Reply (2): Yes.

Interpretation: 45-6

Subject: B31.1-2004 Edition, Para. 131.6

Date Issued: September 17, 2009

File: 09-818

Question (1): Piping of material belonging to P-No. 3, 4, 5A, 5B, or 6 is tack welded using a qualified WPS. The tack welds are made using bridge tacks that will be slow cooled, removed, and the area examined for cracks prior to welding the joint. Per B31.1-2004 Edition, para. 131.6.1, does this tack weld constitute the commencement of welding that would then require the preheat to be maintained until the requirements of para. 131.6.1(A) or para. 131.6.1(C) are met?

Reply (1): No.

Question (2): Welding has been completed on piping of material belonging to P-No. 5B and has been allowed to cool to 200¡F or lower to achieve a fully martensitic microstructure just prior to performing the required PWHT. Per B31.1-2004 Edition, para. 131.6.1, does the weld described in the background constitute an interruption of welding?

Reply (2): No.

I-4

Copyright ASME International

Provided by IHS under license with ASME

No reproduction or networking permitted without license from IHS

ASME B31.1 INTERPRETATIONS VOLUME 45

Interpretation: 45-7

Subject: Table 121.5, General Note (c)

Date Issued: November 30, 2009

File: 09-971

Question: Is the suggested pipe support spacing table based on stress not exceeding 2,300 psi (15.86 MPa) with a sag of no greater than 0.1 in. (2.5 mm) between supports?

Reply: Yes.

I-5

--`,,```````,,```,`,`,,,,`,`,`,`-`-`,,`,,`,`,,`---

Copyright ASME International

Provided by IHS under license with ASME

No reproduction or networking permitted without license from IHS

INTENTIONALLY LEFT BLANK

--`,,```````,,```,`,`,,,,`,`,`,`-`-`,,`,,`,`,,`---

Copyright ASME International

Provided by IHS under license with ASME

No reproduction or networking permitted without license from IHS

Соседние файлы в папке 01.ASME