Подготовительные упражнения

I Переведите предложения с причастными оборотами.

  1. Being introduced on the railways, the automatic train control will facilitate both the work of the driver and the dispatcher.

  2. Comprising all spheres of railway operation telecommunication greatly contributes to increased reliability of railway service.

  3. Being divided into divisions, the railway handles the traffic more efficiently.

  4. Having been warned of the train collusion the dispatcher immediately sent a special train to the scene of the accident.

  5. Having encounted the difficulties in operating the industrial locomotive the engineer applied radio control.

  6. Telecommunication being increasingly introduced on the railways allows both the goods and the passenger trains to run according the schedule.

  7. Having been devised, the control devices simplified the train operation.

  8. Out-of-face surfacing being widely used on shortlines, the overall re-ballasting operations have been greatly facilitated.

  9. The information from the maintenance supervisor being tabulated at a central location, the contractors will be asked to bid on the work.

  10. With the details on safety reporting and other items worked out the spot surfacing operation takes place.

  11. The manager is aware of the information having been received from the maintenance supervisor.

II Укажите, по каким формальным показателям можно определить герундий в данных предложениях; переведите предложения на русский язык.

  1. The idea of placing a surfacing and lining crew on a segment of track with instructions “call me when you’re done” only exacerbates the problem.

  2. Making out-of-face surfacing is often associated with tie, rail or overall re-ballasting operations.

  3. The high tractive effort of electric locomotives leads to their being widely employed on mountainous routes.

  4. After having done spot surfacing the original condition is returned to the track.

  5. On being applied for raising, tamping and lining the track special machines greatly contribute to the reduction of maintenance costs.

  6. Planning track surfacing on shortline railroads gives the opportunity to the property managers and owners to know the prevailing prices for this type of work.

  7. Often, after the remaining work is pruned, it is thought of its being completed and of the resource being balanced with the requirements.

III Переведите предложения с герундиальными оборотами, обращая внимание на место оборота в предложении и форму герундия.

  1. On some railways the high voltage alternating current can’t be applied for traction purposes without its being transformed into the direct current.

  2. Saving time in locating and eliminating any trouble is far from being the only advantage of the automatically operated power plants.

  3. The traffic was stopped because of the power supply system having been damaged.

  4. On being generated, the electric energy is transmitted over long distances by high voltage transmission lines.

  5. Less personnel is required in case of substations being operated by remote control.

  6. On locating any trouble the operator should eliminate it as soon as possible.

  7. It is impossible to increase speeds on railways without giving proper attention to safety.

  8. In spite of having some disadvantages of owning and operating expensive and complicated surfacing and lining equipment shortlines are using constructors to surface and line track.

  9. Preparing specifications with professional guidance is a component of the planning and budgeting system.

  10. When electric traction was first introduced not many people thought of its being used on railways.