Добавил:
ivanov666
Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз:
Предмет:
Файл:Pricing and cost estimation in construction. Educational and methodical manual.pdf
X
- •1. PRACTICAL WORKS
- •1.1. Legal regulation, stages, basic concepts of pricing and cost estimation in construction
- •1.6. The procedure for the formation of a consolidated estimate calculation of the cost of construction
- •1.8. The procedure for determining the initial maximum price of the contract (agreement), contract price
- •1.9. Formation of the actual cost of construction and cost control
- •2. COURSE WORK
- •2.1. General requirements for the course work
- •2.4. Calculation of the initial (maximum) prices of contracts (agreements) when making purchases at the construction stage
- •2.5. Calculation of firm contractual prices of contracts (agreements) based on the results of purchases at the construction stage
- •CONCLUSION
- •BIBLIOGRAPHIC LIST
- •APPENDIX

A firm contractual price for the design and survey work and
Name of types of work and costs
Initial (maximum)
price of the contract
(agreement), rub. (IMCP)
Tender
decline,
%
Fixed contract
price, rub.
1
2
3 4 5
1
Survey work
Based on the IMCP
%
col. 3 (1 col. 4/100)
2
Design work
Based on the IMCP
%
Same
3
Costs for the maintenance of the customer
service and construction control
Based on the IMCP
%
Same
4
Setting out the building axes and checking
the building fit
Based on the IMCP
%
Same
5
(Authors supervision)
Based on the IMCP
%
Same
6
Examination of project documentation
and engineering survey results
Based on the IMCP
%
Same
7
Total
8
VAT 20 %
9
Total with VAT
provision of services for the performance of customer functions
Table 2.8
As a result of the calculations, it follows:
1) graphically present a comparative diagram of the estimated (marginal) cost of construction, the
estimated cost of construction, the initial (maximum) price of the contract (agreement), a firm contract price;
2) analyze deviations of cost indicators.
CONCLUSION
Based on the results of the calculations, a comparative analysis of the cost indicators of the capital
construction object at the stages of implementation of the investment and construction project
pre-project, design and construction should be carried out:
determine the growth rate of cost indicators;
determine the specific cost indicators per 1 m2 of the total area of the building as a whole for
the facility;
determine the specific indicators per 1 m2 of the total area by type of work.
Taking into account the results of calculations, it is necessary to formulate a conclusion about
the cost indicators at the stages of implementation of the investment and construction project.
51

BIBLIOGRAPHIC LIST
1.
-
www.pravo.gov.ru 0001202103260001.
URL: https://minstroyrf.gov.ru/upload/iblock/7e1/Metodika-NR-itogovaya-versiya-_-v-minyust.pdf
2.
-
-
www.pravo.gov.ru 0001202102120003.
URL: https://minstroyrf.gov.ru/upload/iblock/b95/Metodika-smetnoy-pribyli.pdf
3.
URL:
http://www.consultant.ru/document/cons_doc_LAW_66669
4.
2024
.
URL: http://www.consultant.ru/document/cons_doc_LAW_75048
5.
-
-
www.pravo.gov.ru URL:
https://www.consultant.ru/document/cons_doc_LAW_362957
6.
-
-
-www.pravo.gov.ru
URL: https://fgiscs.minstroyrf.ru/frsn/standard/methodical/1050f993-
bcd7-4066-a95a-d7951508516d
7.
-
-
-www.pravo.gov.ru
0001202002040052. URL: https://www.consultant.ru/document/cons_doc_LAW_344610
8.
-
URL: http://www.consultant.ru/document/cons_doc_LAW_51040
9.
-
239.
URL: http://www.consultant.ru/document/cons_doc_LAW_5142
52

APPENDIX
The name of indicators
Units
of meas.
Options
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9
10
11
1
Technical and economic indicators
1.1
The total area of the building, including
m2
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
1.1.1
Underground part (including car park)
m2
12 145,32
2765,40
2869,70
2183,20
2619,84
2515,05
3730,61
4424,64
1.1.2
Above-ground part
m2
39 636,10
12 680,40
14 133,10
13 029,80
15 635,76
15 010,33
18 373,03
20 288,64
1.2
Total area of apartments
m2
26 386,50
8037,40
8834,50
8042,40
9650,88
9264,84
11 484,85
12 859,84
1.3
Living area of apartments
m2
13 985,72
4715,20
5070,50
4860,10
5832,12
5598,84
6591,65
744,32
1.4
Car park area
m2
11 990,40
2101,20
2101,80
1500,10
1800,12
1728,12
2732,34
3361,92
1.5
Number of apartments
PCS
310
140
160
147
176
170
208
224
1.6
Area of non-residential premises, including ITP
m2
2859,82
503,70
501,30
625,20
750,24
720,23
651,69
805,92
1.7
Structural volume of the building
m3
145 251,60
58 636,90
61 417,60
54 248,75
65 098,50
62 494,56
79 842,88
93 819,04
1.8
Floors/sections
floor
/4
15/2
17/2
18/1
18/2
16/2
18/2
15/3
1.9
Built-up area
hectare
0,714
0,4524
0,5000
0,3000
0,36
0,35
0,65
0,72
2
Technical characteristics of constructive solutions
and types of work
2.1
Site preparation
2.1.1
Cutting down trees
PCS
0
48 42
35
20 30
2.1.2
Bush cutting
PCS
0
70 6 7 7 40
2.1.3
The device of geodetic signs
PCS 0 9 9 9 9 9 9 9
2.1.4
Setting out the building axes and checking the building fit
An object
1,00
1,00
1,00
1,00
1,00
0,96
1,30
1,60
2.1.5
Reconstruction (removal) of outdoor lighting
(dismantling, excavation, garbage disposal, installation,
commissioning, restoration of landscaping)
support /
m cable
5/46
15/78
24/83
2.1.6
Removal of 0,4 kV cable lines (cable dismantling,
excavation, soil removal, waterproofing, pipeline
installation, cable installation, landscaping restoration)
m cable
removal /
m cable
installation
245/1230
208/298,8
104/158
Main technical and economic indicators and technical characteristics of design
solutions residential building with underground parking, landscaping and landscaping
53

The name of indicators
Units
of meas.
Options
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9
10
11
2.1.7
Removal of 10 kV cable lines (cable dismantling,
excavation, soil removal, waterproofing, pipeline
installation, cable installation, landscaping restoration)
m cable
removal /
m cable
installation
220/2097
120/896
2.1.8
Drain removal (dismantling of pipes, earthworks, soil
removal, installation of pipelines and wells, restoration
of landscaping)
m pipe
dismantling
/ m pipe
installation
28,6/34,7
35/87
2.2
Underground part
2.2.1
Excavation
m3
79 759,00
25 677,90
22 202,00
27 250,30
32 700,36
31 392,35
28 862,60
41 084,64
2.2.2
Backfill with compaction
m3
17 631,70
2745,20
2500,00
5889,50
7067,40
6784,70
3250,00
4392,32
2.2.3
Finishing the soil manually
m3
806,00
2.2.4
Wall drainage device
m
529,00
281,10
113,20
135,84
130,41
449,76
2.2.5
Sand base for foundations
m3
5150,00
314,39
313,00
244,92
293,90
282,15
406,90
503,02
2.2.6
Concrete preparation device B7,5 100mm
m3
740,00
314,39
313,10
244,92
293,90
282,15
407,03
503,02
2.2.7
Leveling screed thickness. 30 mm
m2
7400,00
3149,40
3287,03
2449,33
2939,20
2821,63
4273,14
5039,04
2.2.8
-
m2
6508,00
1866,21
1478,82
1549,07
1858,88
1784,53
1922,47
2985,94
2.2.9
EPP-
m2
7700,00
3472,96
3431,09
2733,13
3279,76
3148,57
4460,42
5556,74
2.2.10
Monolithic foundation slab made of concrete B25,
reinforcement 158 kg/m3 AIII
m3
5138,00
2101,30
2312,68
1776,77
2132,12
2046,84
3006,48
3362,08
2.2.11
Bearing monolithic reinforced concrete basement walls 300
and 220 mm, reinforcement 209 kg/m3 AIII, concrete B25
m3
3337,00
602,54
293,45
477,12
572,54
549,64
381,49
964,06
2.2.12
Columns monolith reinforced concrete 600 600 mm,
with reinforcement 300 kg/m3 AIII, concrete B25
m3
19,00
21,82
84,55
94,66
113,59
109,05
109,92
34,91
2.2.13
Monolithic reinforced concrete floor 200 mm,
reinforcement 180 kg/m3 AIII, concrete B25
m3
4076,00
1073,99
1080,06
670,95
805,14
772,93
1404,08
1718,38
2.2.14
Monolithic reinforced concrete stairs, reinforcement
160,47 kg/m3 AIII, concrete B25
m3
161,10
22,20
29,58
29,58
35,50
34,08
38,45
35,52
2.2.15
Thermal insulation of external walls with foam products
on bitumen
m3
51,19
43,10
43,10
51,72
49,65
56,03
81,90
Continuation of the appendix
54

The name of indicators
Units
of meas.
Options
1 2 3 4 5 6 7
8
1 2 3 4 5 6 7 8 9
10
11
2.2.16
Insulation of the outer walls of the basement with
a protective brick wall
m2
1100,00
7,20
7,20
8,64
8,29
9,36
-
2.2.17
Interior brick walls
m3
250,00
34,23
16,60
100,00
120,00
115,20
21,58
54,76
2.2.18
Floors of the underground car park (polyethylene film,
sand concrete screed M200 50 mm thick reinforcement,
protective screed 30 mm; vacuum concrete B25 t. 80 mm,
impregnation)
m2
10 471,45
2.2.19
Floors of technical rooms (vacuum concrete B25 t. 80 mm;
concrete screed m 200 thickness 50 mm reinforcement,
protective screed 30 mm)
m2
451,00
2.2.20
Floors of technical premises (cement-sand screed
20 mm from mortar grade M150, underlying layer
of class B10 concrete thickness 45 mm, ceramic tiles)
m2
3378,15
2.2.21
Floors of technical premises (expanded clay padding
90 mm thick, vapor barrier with polyethylene film,
cement-sand screed from a solution of brand M 150,
45 mm thick with reinforcement with a mesh dia. 4 mm
Vr-I, ceramic tiles measuring 300 mm 300 mm)
m2
62,18
33,80
54,00
64,80
62,21
43,94
99,49
2.2.22
Floors of technical premises (coated waterproofing 3 mm
thick, cement-sand screed from a mortar grade M150
135 mm thick with reinforcement with a mesh dia. 4 mm
Vr-I, ceramic tiles 300 mm 300 mm)
m2
91,55
99,10
65,02
78,02
74,90
128,83
146,48
2.2.23
Floors of the underground car park (cement-sand screed
made of polypropylene fiber 125 mm thick, TechnoNIKOL
Taikor Top 425 self-leveling floor (polyurethane enamel))
m2
2455,05
2480,30
2008,20
2409,84
2313,45
3224,39
3928,08
2.2.24
Marking of parking spaces
m2
500,00
940,40
976,80
710,40
852,48
818,38
1269,84
1504,64
2.2.25
The device of treatment facilities for washing cars ROSA-M
PCS 1 1 1 1
1,20
1,15
1,30
1,60
2.2.26
Doors
PCS
136
16
20
12
14
13
26
26
2.2.27
Gates
PCS
17 2 2 2 2 2 3
3
2.2.28
Total for the underground part
Continuation of the appendix
55

The name of indicators
Units
of meas.
Options
1 2 3 4 5 6 7
8
1 2 3 4 5 6 7 8 9
10
11
2.3
Aboveground part
2.3.1
Bearing monolithic reinforced concrete walls 220 and
300 mm, reinforcement 160 kg/m3 AIII, concrete B25
m3
8607,87
1475,17
1601,03
1011,12
1213,34
1164,81
2081,34
2360,28
2.3.2
Columns monolith reinforced concrete 600 600,
300 600 mm, with reinforcement 300 kg/m3 AIII,
concrete B25
m3
46,00
53,41
5,23
5,85
7,02
6,74
6,80
85,46
2.3.3
Monolithic reinforced concrete floors, thickness 200 mm,
reinforcement not more than 180 kg/m3 AIII, concrete B25
m3
10 124,00
2629,41
2925,04
2310,12
2772,14
2661,26
3802,55
4207,06
2.3.4
Prefabricated reinforced concrete structures (hinged
exterior panels)
PCS
558
569
491
589
566
740
893
2.3.5
Prefabricated reinforced concrete stairs
PCS
276
66
64
38
46
44
83
106
2.3.6
Prefabricated reinforced concrete ventilation blocks
PCS
0
252
288
277
332
319
274
403
2.3.7
Arrangement of entrance groups (monolithic structures)
k-s 4 2 2 1 2 2 2 3
2.3.8
Monolithic reinforced concrete stairs, reinforcement
103,74 kg/m3 AIII, concrete B25
m3
57,50
47,10
51,27
61,52
59,06
61,23
2.3.9
Elevator shafts (monolithic reinforced concrete structures)
m3
276,66
283,96
200,27
240,32
230,71
369,15
442,66
2.3.10
Exterior brick walls
m3
257,00
2.3.11
Interior brick walls
m3
363,00
49,25
137,40
178,62
78,81
2.3.12
Internal walls (foam concrete blocks)
m3
1281,90
756,32
1596,96
1916,35
1839,70
983,22
2051,04
2.3.13
Brick partitions
m2
10 425,00
477,58
21,50
1970,28
2364,34
2269,76
27,95
764,13
2.3.14
Partitions made of phosphogypsum tongue-and-groove
plates, thicknesses 80 mm
m2
22 730,00
8164,80
528,00
6804,80
8165,76
7839,13
686,40
13 063,68
2.3.15
Fachwerk installation
t
0,9561
5,9238
4,6326
5,56
5,34
7,70
1,53
2.3.16
External walls (foam concrete blocks)
m3
1750,00
106,13
279,20
309,35
371,22
356,37
362,96
169,81
2.3.17
Facade work basement and 1st, 2nd floor (granite)
m2
4200,00
410,00
192,24
230,69
221,46
533,00
2.3.18
m2
438,00
700,80
2.3.19
Facade works 316 floor (facing ceramic brick)
m2
15 552,00
1360,76
1314,10
650,16
780,19
748,98
1708,33
2177,22
2.3.20
Painting of facades (balcony railings, parapets and ends)
m2
6830,00
123,00
40,00
18,60
22,32
21,43
52,00
196,80
2.3.21
Mounting, dismantling and operation of scaffolding
m2
22 000,00
1483,00
1354,00
668,00
801,60
769,54
1760,20
2372,80
2.3.22
PVC window units with double glazing
m2
38 100,00
1549,24
1000,50
1680,54
2016,65
1935,98
1300,65
2478,78
Continuation of the appendix
56

The name of indicators
Units
of meas.
Options
1 2 3 4 5 6 7
8
1 2 3 4 5 6 7 8 9
10
11
2.3.23
Stained glass windows (aluminum)
m2
1148,00
485,58
536,84
312,46
374,95
359,95
697,89
776,93
2.3.24
Glazing of loggias
m2
3789,00
1541,23
1714,50
2188,08
2625,70
2520,67
2228,85
2465,97
2.3.25
Interior doors (service and fire doors, metal)
PCS
670
12
12
12
14
14
16
19
2.3.26
External doors (metal)
PCS
70 5
34
41
39
7
2.3.27
Internal doors (metal)
PCS
320
216
259
249
416
2.3.28
Interior doors (wooden)
PCS
478
677
792
740
888
852
1030
1083
2.3.29
Installation of technical cabinet doors (0,15 m2 area)
PCS
631
457
614
1136
1363
1309
798
731
2.3.30
Installation of sanitary hatches
PCS
289
290
261
313
300
377
462
2.3.31
Roof over the garage without top coating
(without landscaping)
m2
4537,00
1122,48
221,10
416,40
499,68
479,69
287,43
1795,97
2.3.32
Roof above ground
m2
1260,00
932,40
1114,00
847,87
1017,45
976,75
1448,20
1491,84
2.3.33
Roof of the above-ground part (operated)
m2
1680,00
1035,36
2162,00
2321,64
2785,97
2674,53
2810,60
1656,58
2.3.34
Finishing works of common areas (floors, walls, ceilings)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.3.35
Garbage chute
k-s 4 2 2 1 2 2 2 3
2.3.36
Miscellaneous work (drilling and sealing holes,
stairs, fences, soundproofing of ventilation chambers
and switchboards, entrances, pits, ducts, etc.)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.3.37
Total for the aboveground part
2.4
Engineering systems
2.4.1
Plumbing and ventilation works, incl.
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.1.1
Heating system
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.1.2
Heat supply
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.1.3
Water pipes
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.1.4
Sewerage
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.1.5
Automatic fire extinguishing system (AUPT)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.1.6
Ventilation and air conditioning system
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.1.7
Smoke ventilation
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.1.8
Water measuring unit
k-s 1 1 1 1 1 1 1 1
2.4.2
ETC
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.3
Power supply system, incl.
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
Continuation of the appendix
57

The name of indicators
Units
of meas.
Options
1 2 3 4 5 6 7
8
1 2 3 4 5 6 7 8 9
10
11
2.4.3.1
Electric lighting
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.3.2
Power equipment
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4
Low-current systems, incl.
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.1
Radiofication
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.2
Telephonization
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.3
TV
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.4
Structured cabling systems
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.5
Automatic fire alarm (APS)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.6
Fire warning and evacuation management system (SOUE)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.7
Fire-fighting automation system (PA)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.8
Gas control system (car park) (SZ)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.9
Automated control and dispatching system (ASUD)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.10
Access control and management system (ACS)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.11
Video surveillance system (SVN)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.12
Entrance security system (SOV)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.4.13
Automatic system for commercial accounting of energy
resources (ASKUE)
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.5
Lifts (capacity 1000 kg, capacity 400 kg)
PCS
12,00
4,00
4,00
2,00
2,40
2,30
5,20
6,40
2.4.6
Security and protection deratization system (OZDS)
k-s 4 2 2 1 2 2 2 3
2.4.7
Other costs (thermal imaging inspection, monitoring)
m3 of the
building
145 251,60
58 636,90
61 417,60
54 248,75
65 098,50
62 494,56
79 842,88
93 819,04
2.4.8
Temporary heating
m3 of the
building
145 251,60
58 636,90
61 417,60
54 248,75
65 098,50
62 494,56
79 842,88
93 819,04
2.4.9
Vertical transport
m2 total sq.
51 781,42
15 445,90
17 002,80
14 579,00
17 494,80
16 795,01
22 103,64
24 713,44
2.4.10
Total for engineering systems
2.5
Total for residential building
2.6
Landscaping, incl.
2.6.1
Driveways, roads, parking lots, waste bins with asphalt
concrete coating (sand 50 cm; concrete B7.5 12 cm;
m2
5493,10
1277,70
966,00
848,00
1017,60
976,90
1255,80
2044,32
Continuation of the appendix
58

The name of indicators
Units
of meas.
Options
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9
10
11
2.6.2
Pavement made of paving stones (sand 30 cm;
concrete B7.5 12 cm; paving stones)
m2
2039,40
1564,90
1955,50
1629,00
1954,80
1876,61
2542,15
2503,84
2.6.3
Paths and platforms coated with rubber crumb
(sand 30 cm; crushed stone 15 cm; a/b sand. 4 cm;
poured. coated. 40 mm, crumb 10 mm)
m2
148,00
93,50
293,00
165,54
198,65
190,70
380,90
149,60
2.6.4
Side stones
m
2157,00
973,00
1229,00
855,00
1026,00
984,96
1597,70
1556,80
2.6.5
Coating of tactile boards (sand 30 cm; concrete B7.5 12 cm;
tactile boards)
m2
96,12
10,00
16,00
2.6.6
Total landscaping
2.7
Landscaping, incl.
2.7.1
Tree planting
PCS
63,00
8,00
11,00
6,00
7,00
7,00
14,00
13,00
2.7.2
Planting shrubs
PCS
1869,00
202,00
28,00
82,00
98,00
94,00
323,00
2.7.3
Planting shrubs in a two-row hedge
PCS
180,00
1143,00
1486,00
2.7.4
Lawn seed
m2
5388,64
1090,40
688,60
999,80
1199,76
1151,77
895,18
1744,64
2.7.5
Vertical layout
m2
2935,00
3043,00
2940,00
1800,00
2160,00
2073,60
3822,00
4868,80
2.7.6
Total for landscaping:
2.8
Small architectural forms
PCS
70
42
80
50
60
58
104
67
2.9
Outdoor networks
2.9.1
Drainage
m
481,00
63,40
66,10
317,00
380,40
365,18
85,93
101,44
2.9.2
Drain m 294,70
123,10
84,90
113,20
135,84
130,41
110,37
196,96
2.9.3
Cable duct
m
1290,33
949,00
1781,00
2440,00
2928,00
2810,88
2315,30
1518,40
2.9.4
External dispatch networks
m
390,00
550,00
620,00
744,00
714,24
715,00
624,00
2.9.5
Outdoor Lighting
m
2100,00
684,00
668,00
569,00
682,80
655,49
868,40
1094,40
2.9.6
Total for external networks:
2.10
Insurance
k-s 1 1 1 1
1,20
1,15
1,30
1,60
2.11
Security of the object (for the period of construction)
k-s 1 1 1 1
1,20
1,15
1,30
1,60
2.12
Total for the object:
2.13
VAT
2.14
Total with VAT