
Стеклянные передвижные перегородки
.pdf
|
|
|
|
ТЕХНИЧЕСКАЯ ИНФОТЕКА |
|
|
|
|
|
|
|
HSW |
|
|
Vertical Seals |
www.know-house.ru/infotek/ |
|
|
|
|
|
||
Accessories |
|
Fineline |
|
|
|
|
|
|
|
|
|
Sliding panel
Fixed when the frontage or partition is closed.
The sliding panels are the moving elements. Once in their closed position, they are locked down. The components available for this are provided in the bottom glazing rail in the form of face-mounted floor bolts, end-mounted floor bolts, end pin bolts or deadlocks.
Calculation of the glass width
= Panel width – 16 mm
As-delivered condition:
Cut lengths supplied from factory
= Partition height – 100 mm Holes and recesses are pre-machined in the profile for the bottom glazing rail only.
Any further machining work required for connection to the top glazing rail has to be performed on site.
Sliding panel
|
ø 9.8 |
Adapted |
|
|
|
|
|
|
|
|
|
130) |
|
18.5 |
|
|
|
– |
|
M4 |
|
|
|
delivered-As length (total height |
|
Profilelength adapted on site |
20 25 |
|
Sliding panel |
|
|
7 |
|||
|
|
|
|
|
4 |
|
|
|
|
|
13 |
|
|
|
|
1 |
|
|
|
|
|
32 |
|
Bottom drill hole or recess for end-mounted floor bolt machined by DORMA-Glas
Installation instructions
When fitting the glazing rails, please ensure that the glass protrusion is even over the full length.
Prior to profile machining, first hang the panels from the overhead track and then align.
Use the factory-stamped recesses in the bearing profile for accurate adjustment of the top Fineline profile.
84 |
07/08 |

ТЕХНИЧЕСКАЯ ИНФОТЕКА www.know-house.ru/infotek/
Sliding panels in segmented configurations
Fixed when frontage or partition closed.
The sliding panels are the moving elements. Once in their closed position, they are locked down. The components available for this are provided in the bottom glazing rail in the form of face-mounted floor bolts, end-mounted floor bolts, end pin bolts or deadlocks.
Calculation of the glass width
= Panel width – 16 mm
As-delivered condition:
Cut lengths supplied from factory
= Partition height – 100 mm Holes and recesses are pre-machined in the profile for the bottom glazing rail only.
Any further machining work required for connection to the top glazing rail has to be performed on site.
Sliding panels in segmented configurations
Profile to |
Brush |
upper face of |
13 |
brush carrier |
|
|
ø 9.8 |
Adapted |
|
|
|
|
|
|
|
|
|
|
|
70) |
|
57.5 |
|
|
|
|
height – |
|
M4 |
site |
|
|
|
(totallengthdelivered-As |
|
|
adaptedlengthProfileon |
25 |
|
Sliding panel |
|
|
|
|
|
|
|
|
|
|
|
20 |
|
4 |
|
|
|
|
|
13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
1 |
|
|
|
|
|
|
32
Installation instructions
When fitting the glazing rails, please ensure that the glass protrusion is even over the full length.
Prior to profile machining, first hang the panels from the overhead track and then align.
07/08 |
85 |

|
|
|
|
ТЕХНИЧЕСКАЯ ИНФОТЕКА |
|
|
|
|
|
|
|
HSW |
|
|
Vertical Seals |
www.know-house.ru/infotek/ |
|
|
|
|
|
||
Accessories |
|
Fineline |
|
|
|
|
|
|
|
|
|
Double action sliding panel
Double action panel with RTS
Double action sliding panel
transom-concealed door closer for door access when frontage or partition closed.
Calculation of the glass width
= Panel width – 16 mm
As-delivered condition:
Cut lengths supplied from factory
= Partition height – 100 mm Holes and recesses are pre-machined in the profile for the bottom glazing rail only.
Any further machining work required for connection to the top glazing rail has to be performed on site.
|
|
|
RTS 85 |
|
M4 |
|
|
(total height – 165) |
Adapted |
on site |
20 |
As-delivered length |
|
Profile length adapted |
20 |
|
M4x25 |
Sliding |
Double action sliding |
panel |
panel with RTS |
4 |
65 |
13 |
52 |
32 |
|
1 |
|
7 |
|
Installation instructions
When fitting the glazing rails, please ensure that the glass protrusion is even over the full length.
Prior to profile machining, first hang the panels from the overhead track and then align.
86 |
07/08 |

ТЕХНИЧЕСКАЯ ИНФОТЕКА www.know-house.ru/infotek/
Folding sliding panel
Hinged, with lock and slide bolt at the bottom, latching bolts top and bottom for fixing the final folding panel to the sliding panel.
Calculation of the glass width
= Panel width – 16 mm
As-delivered condition:
Cut lengths supplied from factory
= Partition height – 100 mm Holes and recesses are pre-machined in the profile for the bottom glazing rail only.
Any further machining work required for connection to the top glazing rail has to be performed on site.
Folding sliding panel
|
11 |
|
|
Milled |
|
|
|
Milled |
111 |
174 |
178 |
|
|
932 |
Lock with lever handle and strike box optional.
ø 50
80
50 1050
7
Installation instructions
When fitting the glazing rails, please ensure that the glass protrusion is even over the full length.
Prior to profile machining, first hang the panels from the overhead track and then align.
07/08 |
87 |

|
|
|
|
ТЕХНИЧЕСКАЯ ИНФОТЕКА |
|
|
|
|
|
|
|
HSW |
|
|
Vertical Seals |
www.know-house.ru/infotek/ |
|
|
|
|
|
||
Accessories |
|
Fineline |
|
|
|
|
|
|
|
|
|
Fineline Seal
Profile machining
This is performed by DORMAGlas for the end-mounted and face-mounted slide bolts.
|
Fineline seal with end-mounted slide bolt |
|
|
|
|
|
7 |
1 |
|
|
ø16 |
4 |
|
|
|
13 |
|
|
|
|
12 |
|
|
|
|
|
|
60 |
30 |
|
|
|
42 |
|
|
M4x30 |
37 |
M4x18 |
|
20 |
|
|
||
|
|
|
||
|
|
|
|
|
45 |
70 |
|
|
|
33 |
|
|
|
|
|
|
28 |
|
Fineline seal with face-mounted slide bolt |
|
|
7 |
1 |
|
4 |
|
|
13 |
|
|
|
97 |
30 |
20 |
52 |
|
|
|
|
70 |
|
|
33 |
|
|
|
65 |
|
88 |
07/08 |

|
|
|
|
|
|
|
|
|
|
|
|
|
ТЕХНИЧЕСКАЯ ИНФОТЕКА |
|
|
|
|
|
|
|
|
||
HSW |
|
|
Vertical Seals |
|
www.know-house.ru/infotek/ |
||
|
|
|
|
|
|
||
Accessories |
|
Line |
|
|
|
|
|
|
|
|
|
|
|
|
|
Line Seal
Single action or double action end panels
Non-moving and always equipped with a bottom deadbolt with the option of an additional top bolt or side-action deadlock.
Can be designed as a single action or double action door.
Calculation of the glass width
= Panel width – 30 mm
As-delivered condition:
Cut lengths supplied from factory
= Partition height – 100 mm Holes and recesses are pre-machined in the profile for the bottom glazing rail only.
Any further machining work required for connection to the top glazing rail has to be performed on site.
Single action or double action end panel with floor pivot |
||||
|
|
ø 9.8 |
|
|
Adapted |
57.5 |
|
|
|
70) |
M4 |
|
|
|
|
|
|
|
|
– |
|
lengthProfileadapted on site |
20 25 |
|
delivered-Aslength (total height |
|
63 |
||
|
|
|
4 |
Bottom drill hole or recess for end-mounted floor bolt machined
by DORMA-Glas
Installation instructions
When fitting the glazing rails, please ensure that the glass protrusion is even over the full length.
Prior to profile machining, first hang the panels from the overhead track and then align
07/08 |
89 |

|
|
|
|
ТЕХНИЧЕСКАЯ ИНФОТЕКА |
|
|
|
|
|
|
|
HSW |
|
|
Vertical Seals |
www.know-house.ru/infotek/ |
|
|
|
|
|
||
Accessories |
|
Line |
|
|
|
|
|
|
|
|
|
Sliding panel
Fixed when the frontage or
Sliding panel
partition is closed.
The sliding panels are the moving elements. Once in their closed position, they are locked down. The components
available for this are provided in the bottom glazing rail in the form of face-mounted
floor bolts, end-mounted floor bolts, end pin bolts or deadlocks.
|
Adapted |
ø 9.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
site |
– 130) |
25 |
|
|
|
|
M4 |
height |
|
|
Sliding panel |
||
|
|
|
|
|
|
||
|
|
Profilelength adapted on |
delivered-As length (total |
|
|
|
|
|
|
20 |
33.5 |
4 |
13.5 |
||
|
|
|
|
|
|
|
|
Calculation of the glass width |
|
|
|
|
25 |
15 |
|
= Panel width – 30 mm |
|
|
|
|
|
|
|
As-delivered condition: |
|
|
|
|
|
|
|
Cut lengths supplied from |
|
factory |
|
= Partition height – 100 mm |
|
Holes and recesses are |
Bottom drill hole or recess for end-mounted floor bolt |
pre-machined in the profile |
|
for the bottom glazing rail |
machined by DORMA-Glas |
only. |
|
Any further machining work |
|
required for connection to |
|
the top glazing rail has to be |
|
performed on site. |
|
Installation instructions
When fitting the glazing rails, please ensure that the glass protrusion is even over the full length.
Prior to profile machining, first hang the panels from the overhead track and then align.
90 |
07/08 |

ТЕХНИЧЕСКАЯ ИНФОТЕКА www.know-house.ru/infotek/
Double action sliding panel
Double action panel
Double action sliding panel
with RTS transom-concealed door closer for door access when frontage or partition closed.
Calculation of the glass width
= Panel width – 30 mm
As-delivered condition:
Cut lengths supplied from factory
= Partition height – 100 mm Holes and recesses are pre-machined in the profile for the bottom glazing rail only.
Any further machining work required for connection to the top glazing rail has to be performed on site.
|
|
RTS 85 |
|
|
|
|
M4 |
|
|
|
|
– 165) |
Adapted |
2020 |
|
|
M4x30 |
height(totallengthdelivered-As |
siteonadaptedlengthProfile |
33.5 |
13.5 |
Double action sliding |
|
|
|
|
|
Sliding |
|
|
|
|
|
panel |
panel with RTS |
|
|
|
|
4 |
65 |
|
|
|
|
25 |
40 |
|
|
|
|
15 |
|
Installation instructions
When fitting the glazing rails, please ensure that the glass protrusion is even over the full length.
Prior to profile machining, first hang the panels from the overhead track and then align.
07/08 |
91 |

|
|
|
|
ТЕХНИЧЕСКАЯ ИНФОТЕКА |
|
|
|
|
|
|
|
HSW |
|
|
Vertical Seals |
www.know-house.ru/infotek/ |
|
|
|
|
|
||
Accessories |
|
Line |
|
|
|
|
|
|
|
|
|
Profile machining
This is performed
by DORMA-Glas for the end-mounted and face-mounted slide bolts.
Line seal with end-mounted slide bolt
|
|
|
15 |
|
|
|
|
ø 25 |
4 |
|
|
|
12 |
25 |
|
|
|
|
|
|
|
65 |
30 |
|
|
|
M4 |
|
|
|
|
|
x 40 |
|
|
20 |
|
|
30 |
M4x35 |
|
|
|
|
|
|
|
45 |
33 |
|
|
|
|
|
|
|
45 |
|
|
Line seal with end-mounted slide bolt |
|
|
|
15 |
|
33.5 |
4 |
|
13.5 |
|
|
25 |
|
|
|
|
|
|
85 |
30 |
|
30 |
|
70 |
|
|
|
33 |
|
38,3 |
65 |
|
|
|
92 |
07/08 |

|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ТЕХНИЧЕСКАЯ ИНФОТЕКА |
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
HSW |
|
|
|
|
Notes |
|
|
|
|
|
|
|
|
|
|
|
www.know-house.ru/infotek/ |
|||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
07/08 |
93 |