Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
S.G.A. Technical regulations for the asphalt co...doc
Скачиваний:
1
Добавлен:
26.09.2019
Размер:
504.83 Кб
Скачать

Scheme of operational control over the observance of technological modes at work

hot asphalt concrete mix

(product name)

table 1.3

Name of technological operations

Name of the controlled parameters and their normable value

Normative documents for materials that establishes the value determined by the characteristics

Control method *, the measurement location of monitored parameters

measuring tools, the position number on the flowsheet

Allowable error of measurement of controlled variables

Departments and officials engaged in operational control

Frequency of operational control

Name of executive documentation, in which the control result is recorded

Official who responsible for supervising the activities assigned to the unit in accordance with 8 column in the table

Notes

1

2

3

4

5

6

7

8

9

10

11

12

1.

Dosing of mineral materials according to their moisture and asphalt batching

a) granulometric composition miner. materials (Dry Mix)

State Standard 9128

Operational, Laboratory of ABZ

A set of sieves, scales.

---

Laboratory of ABZ

at least 3-4 times a shift and change in appearance

laboratory work log

Head of OKKDSM, SiM, chief specialist and a leading expert

b) the accuracy of dosing mineraln.materialov prescription

State Standard 9128

Operational, Laboratory of ABZ

weight doser

---

Laboratory of ABZ

every day on admission new batch of material and the change in prescription

recipe

Head of OKKDSM, SiM, chief specialist and a leading expert

c) Dosing of bitumen prescription

State Standard 9128

Operational, Laboratory of ABZ

weight doser

---

Laboratory of ABZ

every day on admission new batch of material and the change in prescription

recipe

Head of OKKDSM, SiM, chief specialist and a leading expert

2.

The temperature mode

a) The temperature of bitumen. For bitumen BND 60/90 - 130-1500S

SNiP 3.06.03-85 Table 13.

Operational, Laboratory of ABZ, working boilers

Thermometers

---

Laboratory of ABZ

Every 2 hours

recipe

Head of OKKDSM, SiM, chief specialist and a leading expert

b) heating temperature of mineral materials. Limit of 165-1850S

SNiP 3.06.03-85 Table 13.

Operational, Laboratory of ABZ, working boilers. ABZ Operator console

Thermometers

---

Laboratory of ABZ

1-2 times per shift

recipe

Head of OKKDSM, SiM, chief specialist and a leading expert

3.

Mixing

Mixing time, sec.:

Laboratory of ABZ

Head of OKKDSM, SiM, chief specialist and a leading expert

a) Dry - 15 sec.

SNiP 3.06.03-85

operational, remote control ABZ

stopwatch

---

Laboratory of ABZ

Every day at least 2 times per shift

recipe

Head of OKKDSM, SiM, chief specialist and a leading expert

b) with bitumen:

SNiP 3.06.03-85

operational, remote control ABZ

stopwatch

---

Laboratory of ABZ

Every day at least 2 times per shift

recipe

Head of OKKDSM, SiM, chief specialist and a leading expert

coarse-grained. - 20-30

State Standard 9128-2009.SNiP 3.06.03-85

permanent

a set of laboratory equipment

---

Laboratory of ABZ

1 time per shift

laboratory work log

Head of OKKDSM, SiM, chief specialist and a leading expert

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]