Operator’s cabin

type Closed, heat and sound

isolated

Air Conditioner: model LG

Lowering the temperature in the cabin

(at ambient temperature to

308 K (35 0 C), K (0C) at 8 - 12

Heat electric fan:

-model TVU-1(25)1,6 UHL-4

-nominal efficiency,

3/min 1,6

- power of heating element, kW:

a) at heating stage I 0,625

b) at heating stage II 1,25

- consumption of electricity per hour,

not more 1,28

Cabin floor area, m 2 6,1

Internal dimensions of the cabin, m,

at least

- length 2,9

- width 2,1

- heigth 2,0

__________________

*

- temperature difference between the stone material at the outlet and inlet drying drum.

**

- The values ​​of specific indicators calculated on the main parameter (P) - the nominal performance for the conditions of preparation of fine-grained, sand or asphalt mixtures according to State Standard 9128-84 from source materials with volumetric mass 1.6 t / m 3 at initial moisture content of 5% and t = 140 0C.

***

- If the duration of work in an atmosphere containing carbon monoxide, not more than 1 h, the maximum allowable concentration of nitric oxide, carbon can be increased to 50 mg / m 3 with a duration of no more than 30 minutes, up to 100 mg / m 3, with a duration of no more than 15 min-200 mg / m 3. Repetitive works under conditions of high carbon monoxide content in the working area can be produced with an interval of at least 2 hours.

****

- Data are presented for a unit operating with a nominal capacity of 48 t / h, with a moisture content of stone materials 5%, the temperature difference before and after heating - 140 0 C, with standard materials and nominal fuel consumption.

*****

- The values ​​of emission of harmful substances from the stack into the atmosphere depends on the physicographic, climatic conditions, mode of operation of the unit, the type of stone materials and fuels.

******

- In the tumble dryer, except for the basic processes of fuel combustion and drying of stone materials, a decrease in the content of silicon dioxide (SiO2), part of the stone materials, due to the passage of a number of thermo-chemical transformations.

*******

List of measuring instruments used for monitoring compliance with the production of technological modes

hot asphalt concrete mix

(product name)

table 1.2

Name of measuring instruments

The appointment,

a brief technical description, the error of measurement

Name of organization (of structural unit), carrying out verification (calibration)

(number of certificate of accreditation for conducting metrological certification)

Frequency of verification (calibration) of measuring instruments

1

2

3

4

5

1

Press P-50 № 6225

Moulding of samples, strength test

Kalmyk Center for Standardization of Metrology and Certification

passport number 000153 the AK series issued by: 11.02.2011 year

once a year

2

Press P -10 № 4362

Moulding of samples, strength test

the same

once a year

3

Compressive strength test machine

IP-500-0

Testing of compressive strength

the same

once a year

4

Vacuum gauge VPZ-UU2

Test for water saturation

the same

once a year

5

Весы равноплечные лабораторные 1000 гр.

Weighing of materials and samples

the same

once a year

6

Dialed desktop scales

RN-10C 13 U

Weighing of materials and samples

the same

once a year

7

Bar scales PH-50 SH 13-2 № 127

Weighing of materials and samples

the same

once a year

8

Desktop scales 50kg RN-50

Weighing of materials and samples

the same

once a year

9

The set of weights G-4-10-1111

Weighing of materials and samples

the same

once a year

10

Laboratory thermometer TN 1-2

Temperature measuring

the same

once a year

11

Laboratory thermometer TTM

Temperature measuring

the same

once a year

12

Manometric thermometer

Temperature measuring

the same

once a year

13

Thermometer TL2

Temperature measuring

the same

once a year

14

Thermometer TTJ

Temperature measuring

the same

once a year

15

Thermometer TN2M

Temperature measuring

the same

once a year

16

Laboratory thermometer TL-4

Temperature measuring

the same

once a year

17

Термометр ТТМ

Temperature measuring

the same

once a year

18

Thermometer R-100

Temperature measuring

the same

once a year

19

Thermometer ТТ

Temperature measuring

the same

once a year

20

Penetrometer M-984

Determination of the viscosity of bitumen

the same

once a year

21

Stopwatch SOS pr 25-2-001

time measurement

the same

once a year

22

Stopwatch SOP pr 2а-3-000

time measurement

the same

once a year

23

Steel cylinder for determining crushability of gravel

Determining crushability of gravel

the same

once a year

24

Set of sieves for gravel LO 251-1

Grain size analysis

the same

once a year

25

A set of metal measuring utensils

MP (1l, 2l, 5l, 10l)

Determination of volume of the material

the same

once a year

26

Elutriation vessel

Determination of the content of dust and clay particles

the same

once a year

27

Set of sieves for sand

Grain size analysis

the same

once a year

28

The cylindrical shape with an inner diameter of 71.4 mm

Moulding of samples

the same

once a year

29

A set of weights

Determination of the weight of the material and samples

the same

once a year

30

Ductilometer M-984-N

Determination of tensile of bitumen

the same

once a year

31

Drying closet SNOL -3,5

Drying of the material

the same

once a year

32

Device for determining the softening temperature of bitumen by RuNO

Determination of the softening temperature of bitumen

the same

once a year

33

Caliper 0-125 mm

Determining the exact distance

the same

once a year

34

Caliper 0-250 mm

Determining the exact distance

the same

once a year

Preparation of the unit to work.

Prior to the start of operation of the unit operator shall ensure that all mechanisms and devices of the unit are in good condition, adjusted and lubricated, and minor faults reflected in the shift log prior to shift have been eliminated.

Control - measuring devices have a stamp and sealed.

Manometer arrows are in the zero position in the absence of pressure in the routes.

If there is pressure in the routes manometer arrows should show pressure:

  • in the routes of fuel system - 1.5 - 5.5 kg/cm2;

  • in the routes of the coolant - 5 - 8 kg/cm2.

Lubricators of the unit heat system filled with the necessary quantity of oil and condensate in the pneumatic system and the coolant is removed.

Fuel tanks filled with with fuel.

Bitumen battery including the bituminous unit (consumable bitumen pot) filled with bitumen. The temperature of bitumen in the feed tank in the range 140 - 1500C, and the remaining tanks battery of bitumen 80 - 1000C.

Aggregate's mineral powder bunker is filled with powder.

Taps, cocks the components of the unit are in position, ensuring the execution of of working operations for the production of asphalt mixes. The system of steam heating of the unit is filed with steam (or other coolant), including the heating system in the mixer.

Heating of bitumen wire and partial heating of closing devices (bituminous cranes, valves) is enabled.

Mazut is heated in the fuel tank to a temperature of 95 - 1050S.

Bunker - storage of ready mix and the skip shall be exempt from the excess and oversize.

Pressure spool body spray system must be adjusted to the pressure of not more than 6 kg/cm2.

Skip winch lift rope is in good condition.

Tube 3-way valve fuel tank should be in a position that ensures the circulation of diesel (heating oil) fuel tank for easy fuel filter - opened.

After 4 - 5 minutes after the ignition plug nozzle 3-way valve installed in the position of providing outflow of fuel oil into the tank for fuel oil, open the valve connecting the tank with black oil filter. You must then close the valve connecting the tank to the light fuel filter.

Scheme of technological process.