Добавил:
Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:

Практика делового общения на английском языке. Учебное пособие

.pdf
Скачиваний:
0
Добавлен:
07.09.2026
Размер:
1 Мб
Скачать
☆
1. The plant was operated by ... very skilled workers.
2. Can I speak to ... workers who assembled the machine?
3. ... engineers who worked out this design come from
Kaliningrad.
4. Only ... experienced engineers could make these modifications.
5. They detected ... minor defects in the instrument.
6. ... defects caused a break-down of the line.
7. They undertook to correct ... defects right away.
8. They have to buy ... raw materials from Mexico.
9. ... raw materials delivered under the previous Contra proved to be
substandard.
* * * Dear Sirs, Your consignment of ... chemicals is now ready for dispatch, and we are arranging ... shipment by ... m.v "Mercury", sailing from ... Liverpool on ... 29th of July. ... chemicals are supplied in sixteen carboys, doblepacker for ... extra safety, with ... protective lid to avoid breakage. ... carboys are clearly marked with ... indelible paint. Please confirm ... safe arrival of ... consignment.
Yours faithfully,
…
Notes:
1 m.v. = motor vessel — теплоход (vessel — судно)
2. carboy — оплетенная бутыль
3. lid — крышка
Ex. 13. a) Supply the correct forms of the verbs.
1 We now (to pack) such goods into containers more and more often.
2. I think the consignment (to pack) by now.
3. They now (to pack) Unit M-3 in the assembly shop.
4. They (to correct) the defects now and tomorrow another test will be
made.
5. Now we always (to install) such equipment with the help of our own
personnel.
6. As far as we know they (to carry out) loading now.
7. The plant (to reach) the desired capacity by now.
81
8. The vessel (to place under loading) by now.
* * *
Gentlemen: We (to be) now in receipt of your letter dated October 4. In accordance with our conversations with Mr. Stepanov during his visit to our manufacturing facilities we (to mail) to you drawings of oversized packages which are to be shipped under the above Order. We now (to complete) the making of the cases. We wish to assure you once again that this kind of packing (to provide) proper protection against damage and breakage. Should you have any specific questions concerning the packing, please feel free to contact us.
Yours very truly,
…
b) Suppose the letter has just been written. Say what work the Sellers have done by now, and what work is being done.
Ex. 14. a) Supply the prepositions where necessary.
1. Marking is to be made ... indelible paint ... three sides of the case,
2. The equipment was found defective ... design.
3. The goods were insured ... marine and war risks.
4. The goods do not conform ... the specification of the Contract.
5. All the goods were shipped ... full conformity ...the delivery schedule.
6. We do not yet know when the damage ... the instrument occurred.
7. We cannot give consent ... the immediate installation of the equipment.
8. These seemingly minor alterations may entail ... radical changes in the design.
9. ... our opinion the damage ... the machine occurred transit.
10. We assure you that the unit will stand very high temperatures.
11. The sum of the expenses involved is equal ... $ 2,500.
12. They didn't fulfill the contractual obligations ... respect the delivery dates.
13. The alterations ... the design were introduced ... mutual consent.
82
* * *
Quality Guarantee
We hereby guarantee the machine tool shipped to be strict conformity ... the technical specification ... this ore and to be free ... defects ... design and material ... a period 12 months after being placed ... commercial operation or use, but not later than 18 months that it is properly operated, accordance ... manufacturers' instructions and recommendations.
b) Say what information the Quality Guarantee gives.
this time, at this time
Ex.15. Read the table.
this time — на/в этот раз
at this time — в это время
b) Translate into English.
1. Мы думаем, что повреждение произошло именно в это время.
2. На этот раз товар застрахован против всех морских рисков. 3. В
этот раз они должны исправить дефекты за свой счет. 4. В это время они заканчивали погрузку судна. 5. На этот раз они применили неправильную упаковку.
с) Suppose Mr. Clay conies to Moscow for the third time. Say what problems he will discuss with our engineers and executives this time. d) Say what the weather is like in different countries at this time of the year.
Ex. 16. a) Read the dialogue
Orlov, a representative of the Buyers, meets Mr. Janner, a representative of the Sellers. Orlov: Well, Mr Janner. When do you think the machines will be
83
packed and shipped? Janner: Now that you have signed the Release Certificate, I think we should be through by Friday. We’ll move them to the packing floor the first thing tomorrow morning. Orlov: Good, but I'm just a little bit worried about marking. You remember that the last consignment we got was marked very carelessly. The marking was in English only. And our railway people had problems. Janner: We are sorry we made that mistake. But I’d like to assure you everything will be in order this time. Orlov: And I'd like you not to overlook one more thing. I mean you shouldn't forget to mark the centre of gravity on the oversized packages. Janner: I’ll get our packers onto that straight .away. And we'll give delivery priority to your order. No more problems so far? Orlov: No, I don’t think so. It all seems to be in order.
Notes:
Now that - теперь когда centre of gravity - центр тяжести
b)Reproduce the part of the dialogue, where the two businessmen speak about marking.
c) Say what other problems about packing and marking sometimes can arise.
Ex. 17. a) Read the document.
Remember: liability - финансовая/ответственность expiration — истечение /срока/
Letter of Guarantee
Contract No ...
Trans No ...
We hereby certify that the goods supplied under the above Trans No... have been dispatched in one complete lot, in accordance with the documents attached.
84
We also certify that the goods supplied conform to the highest currently accepted British standard of quality for such equipment, and to the conditions of the Contract. We hereby guarantee our equipment for a period of twelve (12) months from the date of putting the equipment into operation, but no more than eighteen (18) months from the date of delivery. Our liability is limited to making good, by repair or replacement, only defects caused by faulty design, materials or workmanship, during normal and proper use of the equipment. At the expiration of the guarantee period all further liability on our part ceases. For and on behalf of Cracker Ltd.
Export Manager
Notes:
1. to certify — удостоверять
2. to make good — устранять, исправлять
3. to cease = to stop, to end
b) Say what the Letter of Guarantee stated about:
1. the quality of the goods; 2. the Sellers' responsibilities and liabilities.
d)Think and answer.
What kind of document is a Letter of Guarantee? When are Sellers not responsible for the quality of the goods during the guarantee period?
d) Say what you know about the Sellers' and the Buyers' responsibil­ities during the guarantee period.
Ex. 18. a) Read the letter. Remember: source – источник warehouse — склад to come to the conclusion — прийти к выводу
85
Kazanexport, January 20, 20.. Dear Mr. Lukov,
Re: Your telex 71/3125 Our letter of 22 December
I am afraid that you have not correctly interpreted fl letter of December 22, 20.. relative to the misshipment of hardboard and so I would like to start again and, hopefully, clarify the subject for you. In all cases to our knowledge, shipments of hardboad sizes 610 x 1,220 x 1,220, which have been received by us, have been properly marked with the correct size noted on the side of the crate. However, the overall crate size for these sizes is the same, and this, I believe is the source of the mistake. Even though these crates were properly marked as to the size they contained, the fact is they were misshipped, causing problems. We have received these shipments from Nakhodka as well as Kazan arid in point of fact, our own warehouse people have not always picked up the mistakes and have in turn, shipped out the wrong crates to our customers. Since the mistakes are shipping mistakes I came to the conclusion that we should take steps to better identify those crates containing the smaller sizes. I suggested in my letter of December 22, that you colour mark the smaller sizes with a colour stripe on the crate which would help the warehouse people (both yours and ours). I believe if you could come to a colour coding system for the crates containing the smaller sizes, this would be the easiest way to control the problem.
Very truly yours,
…
b) Think and answer.
1. Why did the buyers want the Sellers to use colour marking code?
2. Is it always very important to have shipments marked properly? Why?
3. How are cases usually marked (kind of paint, type of information, language, etc.)?
4. What goods are usually marked like this: DO NOT TURN OVER
86
USE NO HOOKS /крюк, захват/ TOP WITH CARE
5. What other special markings are sometimes used?
c) Write a reply to the letter. Say you are sorry about misshipments, stress that the marking strictly conformed to the conditions of the Contract. Approve the idea of colour marking code.
Ex. 19. Give extensive answers.
1. What information do Guarantee Clauses usually contain?
2. On what factors do Sellers' guarantees depend?
3. Why are two dates specified in the Guarantee Clause of contracts for equipment?
4. What are usual responsibilities of Sellers in respect of packing and marking?
5. What packing problems may arise in the course of executing orders?
6. Why should extra care be taken to mark the shipments properly?
7. How are export shipments insured?
Ex. 20. Read and reproduce.
A Business Contract - Write One Yourself... It's Safer than a
Handshake
Friends and Family might be the only ones whose word or handshake you can trust. There may be some who can't even risk that. As unfortunate as it sounds, it's often the case and the reality is that most deals are not with friends and family but with those you hardly know at all. Ever had a contractor drag his feet on your home repair or improvements? How about the pool man or the neighborhood grass cutting kid not showing up when you expect them? Get them to sign a personal business contract. Here's how to write one...
BUSINESS CONTRACT BASICS
1) Put the Date at top of the page;
2) Put your name and the name of the contractor, salesman, etc.;
87
3) Put down both parties addresses and telephone numbers (very important);
4) Write in detail the products to be transferred or the services to be performed;
5) Write down all the Buyer's agreements, for instance, Buyer agrees to pay in full when work is complete, Buyer agrees to provide all resources, etc;
6) Write down all the Seller/Contractor's agreements, for example, Seller agrees to service product if faults are found within a (state time frame, one week, one month, etc.) period, Contractor agrees to work every (state best time, Saturday at 1pm, etc.), Contractor agrees to work on (Date) and work from 9 to 5 for 10 consecutive days with one hour break for lunch, etc;
7) Create signature blocks at the bottom for both the Buyer and Seller and get signatures for each.
What won't a business contract like this cover?
Very little, but consult an attorney if your deal is extremely important or you want to make absolutely sure. Rob Noyes
Ex. 21.VOCABULARY
conformity
n in conformity with ... e.g. The decision was made in conformity e.g. The goods are to be delivered in full
to prove defective e.g. I’m sorry to say the instrument has proved to be defective. to detect to detect defects in respect of quality/ quantity in respect of payment time of delivery e.g. The sellers didn't observe the terms of the Contract in respect of quality. to construct to install equipment to install machine-tools
88
personnel experienced skilled personnel officer personnel manager e-g. They have over 1000 skilled personnel. raw raw material(s) particular e.g. I am afraid we can't meet your requirements in this particular case. damage damage to the goods the damage occurred ... e.g. The damage to the pump occurred in transit. breakage e.g. The cases will provide good protection against damage and breakage. to cause v damage breakage defects trouble e.g. The damage was caused by wrong packing. faulty goods faulty packing marking opposite e.g. The bank is on the opposite side of the street. 18 indelible; insurance loading during loading port of loading to carry out loading to place a vessel under loading design
e.g. A machine of old design will not sell well. to incorporate e.g. Your suggestions will be incorporated in the plan.
to entail discussions e.g. Your plans entail great expenses. extra extra pay for extra work without extra charge e.g. There were so many people that the company put on extra buses.
89
to seal letters to seal package building construction a site for a new school to build ... on the site of... to ship ... to site to deliver ... to (a building) site e.g. They delivered the goods to site. They will assemble the unit on site. to commission equal trade equal opportunities delivery schedule accordingly . e.g. If you approve the modifications we shall change the instructions accordingly. consent by common consent of smb., to give consent to smth.
UNIT 6
PROMOTION OF BUSINESS
Part A
Fairs and Exhibitions
Every year a lot of international, national and specialized exhibitions and fairs are held in different countries of the world. The number of countries and companies who take part in them is growing from year to year and the scope of fairs and exhibitions is becoming larger.
The display during these exhibitions includes a wide range of exhibits which show the latest achievements in different fields of industry, science and agriculture of many countries.
Usually fairs and exhibitions are crowded with visitors, who show much interest in the exhibits on display.
At international and national exhibitions commercial centers are
90