![](/user_photo/_userpic.png)
- •5.3 Test Instructions
- •Table of Allowable Rapid Fluctuations of Certain Key Measurements.
- •5.5.6 Data Verification
- •5.6 Results
- •5.7 Analysis
- •5.7.1 Method of Trending Results
- •5.8 Report
- •HP / IP Turbine Efficiency Test
- •Typical Control Room Data Sheet
- •Point ID
- •Condenser
- •Annexure - I
- •CONDENSER DESIGN DATA
- •Annexure - II
- •TEST READINGS
- •Annexure - III
- •TYPICAL CONTROL ROOM READINGS
- •UNITS
- •kcal/hr
- •3.0 Working And Test Set Up
- •TEST ENGINEER (TE):-----------------------------------------
- •ENGINEERING REVIEW
- •PERSONNEL REQUIRED
- •TEST CREW ORIENTATION
- •REFERENCE DRAWINGS
- •LEAK DETECTOR OPERATION
- •TEST LOG
- •ACCESSIBILITY
- •CONTROL ROOM / UNIT DATA
- •LIST OF INSTRUMENTS & ACCESSORIES REQUIRED FOR AIR-IN-LEAK TEST
- •L. P. Turbine
- •*Total time from leak sensing by instrument to retrieval to zero (0)
- •Unit
- •LOW FEED WATER TEMPERATURE
- •EXCESSIVE MAKEUP
- •HIGH WATER LEVEL
- •EXCESSIVE NUMBER OF TUBES PLUGGED
- •HIGH DRAIN COOLER APPROACH TEMPERATURE (DCA)
- •DRAIN COOLER INLET NOT SUBMERGED
- •IMPROPER SETTING
- •EXCESSIVE TUBE BUNDLE PRESSURE DROP
- •HP Heater Test Data
- •Control Room Readings
- •FAULT TREE
- •LP Heater Test Data
- •Control Room Readings
- •FAULT TREE
- •LOW FEED WATER TEMPERATURE
- •EXCESSIVE MAKEUP
- •WORN VENT
- •HIGH WATER LEVEL
- •TUBE LEAKES
- •HEADER PARTITION LEAKS
- •EXCESSIVE NUMBER OF TUBES PLUGGED
- •HIGH DRAIN COOLER APPROACH TEMPERATURE (DCA)
- •DRAIN COOLER INLET NOT SUBMERGED
- •IMPROPER SETTING
- •EXCESSIVE TUBE BUNDLE PRESSURE DROP
- •EXCESSIVE NUMBER OF TUBES PLUGGED
- •Unit
- •BFP Test Data
- •Typical Control Room Readings
- •Boiler Feed Pump A / B / C
- •Typical DAS Readings
- •Description
- •CONTENTS
- •1.0 Introduction
- •3.1 Process Description
- •4 References
- •4.1 ASME Performance Test Code 4.2 – 1969, Coal Pulverizers
- •5 Prerequisites
- •(A clean air test is performed with the primary air to the mill at full load normal conditions with the mill out of service (normal primary airflow, no fuel flow)).
- •Avg. Velocity
- •6.4 Isokinetic Coal Sampling
- •4.5.2 Unburned in Flyash at Economizer Outlet
- •Summary
- •Dry Gas Loss
- •Gas Temp Leaving AH - Corr. to Design Ambient
- •OBJECTIVE : Determine the amount of Power being consumed by the primary plant equipment.
- •TEST ENGINEER (TE):
- •REFERENCE: ASME PTC 19.6-1955 and TVA Proc. No. TS/PERF/RTST/FOS/16.0
- •BILL OF MATERIALS
- •BILL OF MATERIALS
- •Note: Quantities to be decided as per the requirement
- •2.4 PORTABLE DATA ACQUISITION SYSTEM
- •BILL OF MATERIAL
- •Acquisition
- •EQUIPMENT: Thermocouple wire for flue gas temperature measurement
- •2.9 HIGH VELOCITY THERMOCOUPLE (HVT) PROBE
- •2.11 HIGH VOLUME FLYASH SAMPLER
|
|
|
|
Centre For Power Efficiency And Environmental |
|
|
Procedure Number |
|||||||
|
NTPC |
|
|
|
Protection, NOIDA |
|
|
|
CENPEEP/EFF/TP/305 |
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TITLE |
|
|
|
|
|
|
|
Rev. 1 /EMS |
||
|
CENPEEP |
|
Routine Boiler Feed Pump Performance Test |
|
Issue Date: 20/04/2000 |
|||||||||
|
|
|
|
|
|
|
|
|
|
PAGE: 11 OF 14 |
||||
|
|
|
|
Typical Control Room Readings |
|
|
|
|||||||
|
Station: ...................... |
Unit: ................ |
Test Date: .................. |
|||||||||||
|
Boiler Feed Pump A / B / C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
Sl.N |
|
Description |
|
|
|
|
Test Readings |
|
|
Remarks |
|||
|
o |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Units |
|
Run 1 |
Run 2 |
|
Run 3 |
|
|
|
|
|
|
|
|
|
|
|
Time |
Time |
|
Time |
|
|
|
1. |
Unit Load |
|
|
MW |
|
|
|
|
|
|
|
||
|
2. |
Turbine Speed |
|
|
rpm |
|
|
|
|
|
|
|
||
|
3. |
Main Steam Flow |
|
|
t/hr |
|
|
|
|
|
|
|
||
|
4. |
Feedwater Flow |
|
|
t/hr |
|
|
|
|
|
|
|
||
|
5. |
BFP |
Suction Temp |
|
|
oC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
6. |
BFP |
Discharge Temp |
|
oC |
|
|
|
|
|
|
|
||
|
7. |
BFP |
Diff. Temp |
|
|
oC |
|
|
|
|
|
|
|
|
|
8. |
BFP Booster Suction |
|
kg/cm2 |
|
|
|
|
|
|
|
|||
|
|
Press |
|
|
|
|
|
|
|
|
|
|
|
|
|
9. |
BFP |
Suct. Press |
|
|
kg/cm2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
10. |
BFP Disch. Press |
|
|
kg/cm2 |
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
11. |
BFP Flow |
|
|
m3/hr |
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
12. |
BFP Speed |
|
|
rpm |
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
13. |
BFP Motor Current |
|
|
Amps |
|
|
|
|
|
|
|
||
|
14. |
BFP Speed Cntl. |
|
|
% |
|
|
|
|
|
|
|
||
|
|
Position |
|
|
|
|
|
|
|
|
|
|
||
|
15. |
BFP Speed Cntl. |
|
|
rpm |
|
|
|
|
|
|
|
||
|
|
Position |
|
|
|
|
|
|
|
|
|
|
Annexure - IV