CONCEPTUAL STUDIES: SELECTION CRITERIA

Proven technology for duty vs technical innovations,

Operator and Partners experience of the proposed concept, Operability, reliability,

Ease of construction & installation,

Project time schedule,

Capex & Opex,

Value creation,

Safety & Environmental aspects,

Risks (technical, economical,..)

Stakeholders, Partners & Authorities point of view.

21

DEVELOPMENT STUDIES:

A MULTIDISCIPLINARY APPROACH

Geophysics

Economics

Geology

Field Operations

Reservoir

Project

Construction

HSE

 

Conceptual

Drilling &

Safety Engineering

Engineering

Completion

Infrastructures

 

Liquefied Natural Gas

Design & Layout

 

 

Process Design

New

 

Technology

Cost Estimate

Mature Fields

Research &

Development

 

 

22

IMPACT OF EARLY STUDIES ON DEVELOPMENT COSTS

Potential of cost reduction

+40 %

+30 %

+20 %

Conceptual

studies +10 % (Concept

Selection)

Key ideas and innovations that generate most cost savings are introduced at this stage

Refined detailed level yields additional/marginal cost savings & opportunities

Pre-Project

 

Detailed

 

 

engineering

 

Basic

 

 

Time

 

engineering

 

 

 

 

 

 

 

 

 

 

 

 

Potential cost reductions should be identified early !

23

THE PRE-PROJECT STUDIES

PRE-PROJECT

Objectives:

Study & describe with more details the development recommended by the conceptual studies. (This document will be the basis of the Basic Engineering)

Determine costs and execution schedule with sufficient robustness to allow launching the Project.

Establish the «Basis of Design» , which will be the reference document for the whole Project phase.

Assess all remaining risks and their potential impact for the execution of the Project as well as during the life of the field.

The pre-project will allow to propose to sanction the Project, and if approved, to launch the execution of the Project (or at least to progress into Basic

Engineering, FEED studies, and to issue the related Call For Tenders, …)

25

PRE-PROJECT CONTENT

Basic data & Basis of Design

Reservoir Development Plan

Hydrocarbons process studies (see next slide)

Utilities, Offsites (Flares, storages, buildings, etc..)

PFDs, simplified PIDs, lay out

Safety systems

Description of wells and surface facilities

Operating philosophy (see content here after)

Safety concept (see content here after)

Project Execution Plan, including Contractual strategy

Project schedule

Costs estimate (see methodology here after)

Define Project Referential (Company rules & Specifications to be applied)

Economic evaluation

26

RESERVOIR DEVELOPMENT PLAN

The Reservoir Development Strategy needs to be formalized as it is the corner stone of both the development and production phases.

More specifically it will precise further the reservoir information to be acquired during the development and production phases

It could also define potential additional appraisal to be completed before the Decision to Develop is taken.

27

PRE-PROJECT: PROCESS STUDIES

Process description

Material Balances for Process & Utilities,

Sizing & data sheet

Main Equipment (vessels, dehydration, sweetening units, pumps, compressors, storage, etc. )

Pipelines

Drawings

PFDs (Process Flow Diagrams)

Simplified PIDs (Process & Instruments Diagrams)

UFDs (Utilities Flow Diagrams)

Safety Logic Diagrams

28

PIDs example

29

WELLHEAD PLATFORM SIDE VIEW

30