- •2007 Р.
- •3) Match a word in column
- •Rock Excavation in civil Engineering
- •Introduction to Remote Control Technology
- •Supplementary reading:
- •Introduction
- •Versatile Drillrig
- •Multiple Tasking in Western Australia
- •Improving Productivity
- •Exercises:
- •4) Give answers to the following questions:
- •Exercises:
- •1)Give Ukrainian equivalents of the following words and word combinations:
- •2) Give English equivalents of the following words and word combinations:
- •3)Fill the blanks with the necessary words and word combinations:
- •4) Quote the sentences in which these words and word combinations are used. Translate these sentences into Ukrainian:
- •5.Give answers to the following questions:
- •6. Tell what you know about:
- •Importance of Geology
- •Igneous Rocks
- •Investigation and Exploration
- •Exercises:
- •1) Give Ukrainian equivalents of the following words and word combinations:
- •4) Quote the sentences in which these words and word combinations are used:
- •5) Give answers to the following questions:
- •Exercises:
- •2) Give English equivalents of the following words and word combinations:
- •4) Quote the sentences in which these words and word combinations are used:
- •5) Answer the following questions:
- •6) Tell what you know about:
- •Vertical Crater Retreat
- •Exercises:
- •1) Give Ukrainian equivalents of the following words and word combinations:
- •2) Give English equivalents of the following words and word combinations:
- •3) Fill the blanks with the necessary words:
- •4) Quote the sentences in which these words and word combinations are used:
- •5) Answer the fallowing questions:
- •6) Tell what you know about:
- •Supplementary reading
- •Список використаної літератури:
- •«Наукова англійська мова»
3) Match a word in column
A with a definition in column В :
both mechanical and human aspect 1. зменшення шуму та пилу
to get maximum return 2. увесь процес буріння
reducing noise and dust 3. i механічний i людський аспект
entire drilling process 4. вщповщати :шжнародним вимогам з охорони
праці
air conditioning system 5. точні інструменти
compile with international 6. напрям бурової свердловини safety demands
precise instruments 7. лазерний сенсор
blasthole direction 8.витрати на видобуток руди
costs for ore excavation 9. система кондищювання повітря
10. laser sensor 10. отримати максимальну віддачу
4) Complete the following sentences:
Operator comfort and safety
To get maximum return on
The cabin offers
The cabin is laid out so that
Productivity, and the need to control
5) Tell what you know about:
Drilling efficiency
Operator's cabin
Ergonomics and Environment
Hole alignment
Depth control
Rock Excavation in civil Engineering
Construction in Rock
In civil engineering, as well as in the building industry, rock is removed to make place for new roads and railways, house foundations, ports and airports, trenches and pipelines, or to provide material for breakwaters and concrete aggregate. These types of construction projects differ from quarrying and open pit mining, in that bench heights vary continuously. Drilling is often performed from a rugged and steep rock surface, which means that the equipment used must have good terrain travelling characteristics. Also, as several holes are drilled from one rig setup, folding booms having good coverage in various directions and planes are the preferred equipment. Atlas Copco has a complete range of drillrigs for this type of work, from heavy crawler rigs to lightweights that can be craned into position, if necessary. The whole spectrum of drilling methods is also available, from pneumatic handheld to hydraulic tophammer, COPROD and DTH.
Accurate
Tendering
Before a new project is commenced, it is normal routine that a design and preinvestigation is conducted, coupled with allocation of financing. Most civil engineering projects are subject to a tendering procedure, where scope of work, bill of quantities, drawings, geological information and time schedule are disclosed, to give all interested parties standard information on which to base their bids. The con-tractor, or a consortium of contractors, makes its calculations based on evaluating equipment requirements, methods, availability of skilled labour, time schedule, local conditions and regulations, as well as cost estimates. Past experience derived from similar projects plays an important role in estimating future costs. A project involves a wide range of equipment, and clever selection is important to achieve overall optimum performance. For blasthole drilling, the variation and complexity of blasting parameters might require both heavy crawler drills and hand held rock drills.
The equipment should, however, be selected to cover a wide range of applications, which will improve spare parts handling and maintenance procedure, and the prospects for usage in subsequent projects. Tophammer drilling rigs are normally the first choice, due to their flexibility, versatility and ability to drill holes of small diameter.
Road Excavation
Figure 1 shows a typical drilling and blasting pattern for a road cut where special emphasis is placed on the final rock wall contour. Smooth blasting, or presplitting, are commonly used, and quite often specified in the tendering documents, to obtain smooth and stable side contours. Contour holes are normally not larger than 64 mm, with spacing of less than 1 m, and charging is carried out using special, light explosive to mini-mize the effect of shock waves. Initiation is frequently by detonating cord. Presplit holes are fired simultaneously ahead of the other holes, where-as smooth blasting uses the highest number of detonator delay.
Presplitting creates an artificial plane along the limits of the excavation, against which the subsequent main blast may break, resulting in a smooth wall, with little or no over-break. Some of the shock waves from the subsequent main blast are reflected against the presplit plane, preventing them from being transmitted into the remaining rock. This also tends to reduce ground vibrations. Drilling with high precision is of utmost importance for the final result.
Slope stabilization should normally be carried out as an integrated part of the excavation process. Horizontal drilling, anchoring, grouting, and meshing using elevated working platforms could cause excessive costs and delays, where they have to be conducted at a later stage (figure 2).
Urban Blasting
Several precautions have to be taken when excavating in built-up areas close to population, infrastructure, buildings and installations (figure 3).
It is quite common that special blasting consultants are involved, to assist the contractor with vibration control and design of drill patterns, as well as a thorough survey of adjacent structures before the work can commence. To minimize ground vibrations, the drillholes are kept as small as possible, normally 30-50 mm diameter. To eliminate the risk of fly rock, the blasts are covered with heavy mats made of logs, rubber, or tyres, cut into sections and twined together with steel wires. These mats, of around 1 t weight, are energy absorbing. The gases produced by the blast ventilate through the mats without displacing them.
Trenching
Trenches are excavated for installation of oil, water and sewage pipelines, as well as for cables. Blasting of trenches differs from common bench blasting, because the width of the round is considerably smaller than its length. Trench blasting is defined as rounds with a width of less than 4 m.A trench blast is more constricted than a normal open pit blast, which results in higher explosives consumption per cubic metre of blasted rock. The diameter of the blast holes is normally smaller, which provides better distribution of the explosive in the rock, and avoids excessive overbreak outside the theoretical contour. As a rule of thumb, the hole diameter should be one sixtieth of the width of the trench, so if the width is 2.0 m, the diameter of the hole should be 33 mm.
Two methods are used for trench blasting: traditional and smooth wall. In traditional trench blasting, the middle hole/holes are placed in front of the lateral holes. All holes are charged with the same amount of explosives. In smooth wall trench blasting, all holes in each row are in line. The middle hole/holes are quite heavily charged, while the edge holes have light charges.
Blasting of trenches in urban areas requires careful planning and precautions. A typical drilling pattern and blasting sequence is shown in figure 4 overleaf. Overall project costs and tight time schedule are of highest priority when conducting pipeline projects for oil and gas distribution in unpopulated areas, and larger blastholes are used, as shown in figure 5 overleaf.
Lists of words
1. bench hight – висота уступу
2. boom - стріла
3. complexity - складність
4. trenching – проходка траншей
5. tender – пропозиція
6. shock wave - ударна хвиля
7. initiation - ініціювання
8. subsequent - наступний
9. precision - точність
10. blasting – підривні роботи
11. eliminate - усувати
12. constrict - стягувати
13. sequence - послідовність
14. anchoring- закріплення
15. bid – заявка, пропонування
16. planning - планування
17. charge - заряджати
Exercises
1) Give the definitions of the following terms :
Civil engineering, drillrig, drilling method.
2) Read and give Ukrainian equivalents of the following international words:
Engineering, port, airport, trench, project, crane, spectrum, pneumatic, hydraulic, routine, detonator.
3) Match a word in column A with a definition in column В :
preinvestigation
scope of work
local conditions
blasthole drilling
due to flexibility
shock wave
reduce ground vibration
slope stabilization
trench blasting
10. overall project costs
Micцевi умови
буріння вибухових свердловин
об'єм робіт 4.ударна хвиля
зменшення вібрації грунту
стабілізащя уступів
попередні розрахунки
вибух у траншеї
загальні витрати по проекту
10. завдяки гнучкості
4) Complete the following sentences .
Before a new project is commenced.....
Past experience derived from.....
Tophammer drilling rigs are normally.....
Smooth blasting, or presplitting.....
Presplitting creates an artificial plane.....
5) Tell what you know about:
Construction in Rock
Accurate Tendering
Road Excavation
Urban Blasting
Trenching
Radio Remote Control
Аutomation Overview
Automation of surface drilling operations may have different focuses, depending on individual circumstances, but safety, ergonomics, quality, and productivity are major considerations.
Safety is required to minimize the risks for operators, while ergonomics improves the working environment. Quality in hole positioning and straightness will result in better fragmentation, producing less waste rock com-pared to the theoretical drill plan. At construction sites, remote guided access to difficult drilling positions is faster, because the driver can obtain the best view of the route.
Above all, a successful automation project should lead to increased productivity.
Requirements for remote control capabilities are growing, especially in the market for non-cab surface drillrigs with remote controlled tramming and drilling. Feedback has been extremely positive from the site in southern Norway where the first of this new genre of drillrigs, the ROC D7 RRC, has been working.