      1. Technical Data laptop

Description

Information:

Note

Required Customer

Guaranteed Contractor

1.

Type

Notebook

2.

Manufacturer

3.

Standards

4.

Теchnical description:

4.1

Processor clock speed, not less, GHz

4-nucleus 2.7GGts

4.2

RAM, not less, GB

4

4.3

Hard disk drive with less GB

500

4.4

Wireless interfaces

yes

4.5

Reader - recording CD / DVD-RW

yes

4.6

Monitor inch

17

4.7

Operating system not lower WINDOWS 7

yes

Special IV. Special technical requirements to automated control system for technological process

  1. General

    1. Scope of Works

ACS TP shall be delivered to the substation as a "turn-key" system in a manner and scope determined by the Employer's requirements.

The scope of works on ACS TP includes the following items:

  • Development of design documentation (DD)

  • Development of working documentation (WD)

  • Supplying of the equipment, including all necessary spare parts and accessories.

  • Performance of all civil-and-erection works and commissioning (including dismantling, mounting, setup and commissioning of equipment, repair/laying of cable routes).

  • Development and submission of operational documentation

  • Employer’s personnel training

    1. Project Structure

In general the ACS TP shall include the following components:

  • Lower (process) level devices – controllers inbuilt to equipment, computer process interfaces (CPI), smart sensors (primary signal transducers) and controlled object actuators

  • Connection level devices (bays) – Intelligent Electronic Devices (IED): measurement, control, equipment status monitoring, electric power quality monitoring, accounting, recording of emergency process etc.

  • Upper level devices –devices of communication operating and maintenance personnel with ACS TP: operator and engineer workstations, remote viewing display, servers, gateways, data transmission devices, substation LAN equipment.

  • Auxiliary subsystems:

    • Power warranty devices

    • Communication and technological LAN devices

    • service equipment and SPTA

    • System, basic and applied user’s software

    • Documentation.

The supplied system should be implemented as an open integrated information system in which intra-communication between control system components are made using the IEC 61850 protocol.

АСS TP should be based on modern element base while minimizing the number of components and maximum use of their functionality.

The Contractor shall provide a functional and hardware compatibility of the supplied system with the rest of substation equipment to ensure the efficient, reliable and safe operation of the substation.