- •16.1 General requirements 22
- •21.1 General requirements 26
- •22. Requirements to Organization of Construction Works 32
- •22.1 General requirements 32
- •23. Requirements to works 38
- •29. Requirements for the switchgear arrangement 330 kV and 110 kV 60
- •35.1 Special requirements 79
- •36. Assortment and quantity 96
- •37 Information about a nomenclature and amount of the required equipment, materials, wares 97
- •38 Tables of technical information 98
- •III. Special technical requirements to relay protection and automation system 116
- •39 General 116
- •39.4 Training 118
- •40 General Functional Requirements to Elements of Relay Protection and Special Automatics System 123
- •41 Nomenclature and amount supplied with the equipment of the systems electric defense and automation of substation 330 kV «Zhovtneva» 143
- •42 Tables of technical information for the system of relay protection and automation 145
- •43. General 204
- •43.1 Scope of Works 204
- •44. Purpose and Objectives of acs tp ss 206
- •45. Functions Performed by the acs tp ss 207
- •46. Description of the Automation Object 212
- •47. Implementation of acs tp basic functions 213
- •48. Organization of acs tp ss 220
- •48.3.1 General requirements 221
- •48.5.1 General Requirements 230
- •49. Requirement to the Types of Support 235
- •55. Technical data table for acsee 269
- •Section I. General technical requirements
- •General requirements
- •Feasibility study
- •Scope of works
- •Improvement and land scaping territory:
- •System of units The entire technical documentation shall use the International System of Units (si), in accordance withthe provisions of theIso/iec 80000.
- •Guaranteed values
- •Special requirements
- •Coordination of activities
- •Regulations, Standards and Rules
- •Unification and interchangeability
- •Materials and quality
- •Quality assurance system
- •Main principles
- •Notification on defects
- •Standard tools
- •Special accessories, instruments and tools
- •Spare parts
- •Basic requirements
- •Mandatory spare parts
- •Recommended spare parts
- •Packing, shipping, transportation and load-lifting mechanisms
- •Packing
- •Shipping and transportation
- •Load-lifting operations
- •Labels and Nameplates
- •Signs essential in case of emergency
- •Mandatory signs
- •Factory tests and factory test reports
- •Inspections and site tests
- •Test reports and test programs
- •Factory test reports
- •Test programs
- •Warranty
- •Training
- •Documentation
- •General requirements
- •Design coordination procedure
- •Responsibility for errors in data and drawings
- •Design alteration procedures
- •Works implementation program and schedule
- •Project for Organization of Construction
- •Reports on works performed
- •Progress meetings reports
- •Installation and commissioning instructions
- •Operating and maintenance manual
- •Requirements to Organization of Construction Works
- •General requirements
- •Permits and licenses for works implementation
- •Temporary sites
- •Supply of construction site
- •Maintenance and cleaning of construction site
- •Organization and quality assurance of civil and erection works
- •Safety and labour protection requirements
- •Fire safety
- •Environmental protection. Environment protection and socialmanagement plan.
- •Requirements to works
- •Land measuring
- •Earthworks
- •Concrete Works
- •Foundations
- •Covered-up works and covered-up works reports
- •Erection works
- •Electrical installation works
- •Start-up and commissioning
- •Insulation and corrosion-protection works
- •Painting
- •Roofing and waterproofing
- •Operational acceptance of the completed facility
- •Section II. Specific technical requirements primery equipment
- •General information on the project
- •System 110 kV
- •The scope of works and services
- •General Provisions
- •The scope of work for the substation
- •Buildings primary purpose
- •The design solutions for buildings main destination
- •Requirements for the switchgear arrangement 330 kV and 110 kV
- •Basic design-layout solutions
- •Monitoring subsystem gis 330/110
- •Purpose and functions
- •Auxiliaries substation
- •Shields own needs
- •Power supply consumers during construction
- •Monitoring of existing at
- •31 Requirements to works, services, materials, structures and main electrical equipment
- •Overvoltage protection , external insulation, grounding system, lighting system , beacons mounted on top of high structures, biological protection
- •Lightning protection system
- •External insulation
- •Requirements grounding system implementation
- •Handing over in exploitation of the earth system
- •Lighting system
- •Biological protection
- •Requirements to works and structural materials
- •Concrete and reinforced-concrete structures
- •Metallic structures
- •Corrosion protection
- •Painting
- •Deviation tolerances of building structures
- •Shipment and transportation
- •Load-lifting mechanisms and accessories
- •Warranty
- •General layout and transportation system ; Access roads at the site
- •Inspection and tests
- •Factory tests and factory test reports
- •Site tests
- •Fire safety
- •Requirements to materials, equipment, structures, systems, conductors and cables
- •Special requirements
- •Insulating gas
- •Isolating switch
- •Inputs are «insulating gas-air»
- •Terminators of overstrain
- •Shield of own needs 0,4 kV
- •Shield of direct-current 220 V
- •Cables and cable trays
- •Power cables
- •Control cables
- •Requirements to the equipment hf treatments for organization hf ducting’s on wl (hf minelayer, condensers of connection)
- •Technical data sheets for primary equipment and infrastructure
- •Assortment and quantity Technical Data Schedules Description
- •37 Information about a nomenclature and amount of the required equipment, materials, wares
- •Information about a nomenclature and amount of the required high-voltage equipment and equipment of own needs.
- •Information about a nomenclature and amount of the required materials (wires, cables and terminal closets)
- •Information about a nomenclature and amount of the required devices of instruments and adaptations
- •Tables of technical information
- •Expls to the tables
- •Technical requirements to gis - 330 kV
- •Technical requirements to gis – 110 kV
- •Technical requirements to the terminator of overstrain 330 kV
- •Technical requirements to the terminator of overstrain 110 kV
- •Technical requirements to the shield of own needs 0,4 kV
- •В Technical requirements to the shield of direct-current 220 V
- •Technical information of high-frequency minelayer for wl 330 kV
- •Technical information of condensers of connection for wl 330 kV
- •Technical information of high-frequency minelayer for wl 110 kV
- •Technical information of condensers of connection for wl 110 kV
- •III. Special technical requirements to relay protection and automation system
- •General
- •Scope of Work Overview
- •Contractor`s Duties
- •Dismantling
- •Training
- •Operational Conditions
- •General Design Requirements
- •Requirements to Microprocessor Devices Regarding External Interface
- •Software Requirements
- •Requirements to Control Cables
- •Spare Parts and Special Tools
- •Warranty Maintenance
- •Requirements to Methodology Buidelines Regarding Selection of Setting for Relay Protection and Special Automatics
- •General Functional Requirements to Elements of Relay Protection and Special Automatics System
- •Devices of Protection of Automatic Transformers 330 kV for at with Phase Shifting Transformer
- •High-frequency transceivers for basic differential-phase defense of line on a microelectronic element base
- •Complete set of automation of management a switch 330 kV with the functions of dbrs, ari
- •Complete set by a basic differential-phase hf defense of wl-110 kV with the functions of reserve defense
- •Complete set of basic differential defense of wl-110 kV (transmission of signal on fibre-optic communication line) with the functions of reserve defense
- •Complete set of defense wl-110 kV (on the controlled from distance and current principle) with funk-ciey dbrs,ari
- •Complete set of defense cs(connecting switch) -110 kV, bcs(bus connecting switch )-110 kV on current principle with the function dbrs
- •Complete set of automation of management a switch 110 kV with the functions dbrs, ari, fld (fixing of line disconnecting)
- •Dbrs function
- •Functions of ari device
- •Device of fixing disconnecting and including line (fld and fli))
- •Automation device of liquidation asynchronous mode (adla)
- •Complete set for the transmission commands rp (relay protection) and sa (special automatic )
- •Requirements to the dividing filters for organization hf ductings
- •Requirement to the joining filter for organization hf channels
- •Requirements to the radio-frequency cable for joining hf apparatus to the hf highway
- •Requirement to the devices of determining damage location (ddl) by a wave method
- •Complete set for the transmission of command rp and sa on fcl
- •Complete set of defense autotransformers 330 kV on differential, controlled from distance and current principle (basic and dublicate)
- •Complete set of defense transformers 110 kV on differential, controlled from distance and current principle
- •Complete set of differential defense of tires 330 kV and 110 kV
- •Complete set of differential defense bus arrangement 330 kV and 110 kV
- •Complete set for adjusting and verification equipment of relay protection and special automatic
- •Verification of devices rp and sa
- •Nomenclature and amount supplied with the equipment of the systems electric defense and automation of substation 330 kV «Zhovtneva»
- •Tables of technical information for the system of relay protection and automation
- •Generals
- •Terminology
- •Technical information of complete set of basic differential-phase defence wl-330 kV
- •Technical data post high-frequency protection (for overhead lines of 330 kV and 110 kV)
- •Technical data sets main differential protection of 330 kV overhead (with signal transmission on fiber optic)
- •Technical data set up protection of 330 kV overhead (on the remote and current principle)
- •Technical data sets automatic control switch with 330 kV circuit breaker failure protection, ar
- •Technical data sets basic differential-phase protections of 110 kV
- •Technical data sets main differential protection of wl-110 kV
- •Technical data set up protection of 110 kV (on the remote and the current principle)
- •Technical Data Security Kit cs-110 kV, bcs- 110 kV bus coupler on the current printsipes the breaker failure protection
- •Technical data sets automatic control switch with 110 kV circuit breaker failure protection, ar, fld
- •Technical data sets of differential busbar protection / busbar 330 kV
- •Technical data sets of differential busbar protection / busbar 110 kV
- •Technical Data Security Kit autotransformers 330/110 kV differential, distance and current principle (main and backup set)
- •Technical Data Security Kit transformers 110/35 kV differential, distance and current principle
- •Technical data protection management set rpn transformers
- •Technical data kit
- •Technical Data Automation Kit elimination of asynchronous operation
- •Technical data set command rp and sa - Tx, Rx
- •Technical data sets and data relay protection and emergency teams on fcl
- •Requirements Crossover
- •Requirements for coupling filter (wl-110 kV)
- •Requirements for coupling filter (wl-330 kV)
- •Requirements for Radio-frequency cables
- •Technical data sets to test relay protection
- •Technical data test set to test hf devices
- •Technical Data laptop
- •Special IV. Special technical requirements to automated control system for technological process
- •General
- •Scope of Works
- •Project Structure
- •Contractor`s duties
- •Purpose and Objectives of acs tp ss
- •Purpose of acs tp of the Substation
- •Objectives of the acs tp of the Substation
- •Equipment operating modes monitorin
- •Automated substation equipment control
- •Warning and alarm system organization
- •Warning system
- •Alarm system:
- •Registration of emergencies
- •Prоviding current and archived data for operating personnel and other users
- •Data exchange with other levels of control hierarchy
- •System-wide functions
- •Description of the Automation Object
- •Implementation of acs tp basic functions
- •General requirement
- •Monitoring of the Substation Current Mode and the Key Diagram Status
- •Equipment Status Monitoring
- •Process parameters monitoring
- •Control Process Automation
- •Automated Management Services
- •Control of the Substation Components
- •Control of 330 – 110 kV Switching Units
- •Control of 35 – 10 kV Switching Units
- •Software and hardware of acs tp
- •General requirements
- •Requirements to the substation level devices
- •Requirements to the connection and process level devices
- •Intelligent Electronic Devices (ied)
- •Requirements to lan
- •Requirements to electromagnetic compatibility of shs acs tp
- •Requirement to reliability of the acs tp software/hardware
- •Requirement to Safety
- •Ensuring of equipment operating conditions
- •Requirement to control and optical cables
- •Testing and self-diagnostics of the shs components
- •Requirements for the maintenance and repair
- •Arrangement of power supply
- •Requirement for Embodiment of Control Cabinet
- •Data exchanges with higher levels of dispatcher control
- •Interaction with adjacent subsystems
- •General Requirements
- •Interaction with aspfm
- •Interaction with relay protection an emergency controls
- •Interaction with substation main equipment monitoring subsystem
- •Interaction with the security video surveillance subsystem
- •Requirement to cyber security
- •Requirements to ergonomics and industrial design
- •Requirement to patent clearance
- •Requirements to standardisation and unification
- •Requirement to the Types of Support
- •Requirements to mathematical support
- •Requirements to information support
- •Requirement to linguistic support
- •Requirements to software
- •Requirements to measurement assurance/metrological support
- •Requirements to spare parts and accessories
- •Requirement to Documentation
- •Technical documentation
- •Project documentation
- •Operational documentation
- •Requirement for acceptance tests
- •General
- •Guarantees
- •Technical data table for the acs tp
- •General
- •Functional requirement Table 1.1: Technical requirements to acs tp hardware and software
- •Section V. Special specifications for automated metering system
- •Setting and purpose of creation the system
- •Purpose acsee ss
- •The purpose of the acsee ss
- •Description of object of automation
- •System requirements
- •General system requirements
- •Requirements for the structure and functioning of the system
- •Reliability requirements
- •Requirements for Safety
- •Requirements to ergonomics and technical aesthetics
- •Requirements for the operation, maintenance, repair and preservation of the system components
- •Requirements for the protection of information from unauthorized access
- •Requirements for the preservation of information in case of emergencies
- •Requirements for protection from the influence of external factors
- •Requirements for the standardization and unification
- •Power Requirements
- •Feature Requirements acsee ss
- •Functions and settings tasks acsee ss
- •Requirements for the type of collateral
- •Requirements of a software
- •Requirements for data provision
- •Requirements for linguistic support
- •Software Requirements
- •Hardware requirements
- •Requirements for the counters of electric power
- •The requirements for communication cabinet acsee ss
- •The requirements for awp
- •The requirements for communication channels
- •Requirements for metrological support
- •Requirements for Organizational Support
- •Requirements to acsse
- •Regulations
- •Technical data table for acsee
- •The range and number
- •Table 2.1: Information regarding the number and amount of equipment required for electricity metering points ss
- •Table 2.2: Data on the nomenclature and the amount of the required hardware and software acsee
- •Table 2.3: Composition Software
- •Technical data table
- •Table 5.1 Technical requirements for electronic multifunction electricity meter
Complete set of differential defense bus arrangement 330 kV and 110 kV
Functional requirements:
differential current defense with braking;
three-phase execution with two areas of differential defense;
choice of area of defense on the basis of position of block-contacts of high-voltage vehicles;
sensible organ of differential defense;
algorithm of control area defense;
two variants of monitoring position of disconnector/switch;
algorithm of fixing of including of the measured current of joining in an area A (B);
association of two areas in one, in the mode of the «broken fixing» of joining or in the case of necessity (regardless of position disconnector);
selective disconnecting from differential defense of tires switches, connected with damage area;
control of good condition chains of TC ( transformer of current ) of the incoming joinings;
blocking of defense at the disrepair of chains of current;
reserve nondirectional maximal current defense;
Phase and three-phase starting DBRS, with control of current, positions of block-contacts of switch or adaptive combination of these two signs;
free-programmable logic;
amount groups of setpoints – not less than 4th;
synchronization from the outsourcing of exact time;
self-diagnostic of device;
internal recorder of events;
oscillographic testing;
energyindependent memory;
liquid-crystal screen on a front panel;
state information represented on the screen of device interconnect vehicles of joining;
user-programmable light-emitting-diode indicators for signaling;
support of protocol of MEK 61850, and presence of standard international protocols of exchange by information for integration in ACS;
front port of Ethernet (Rs232) for connection with a device;
back port with an optical fibre ethernet-interface for connection with ACS substations;
Complete set for adjusting and verification equipment of relay protection and special automatic
Microprocessor device for verification equipment RP and SA must provide possibility and target at implementation of technical service and editing-adjusting works of all microproc and electro mechanics devices of RPA (relay protection automatic) on SS-330 kV.
Configuring and tuning settings of microprocessor devices RP and SA must be carried out by a notebook with the special software (given Contractor in the complete set of delivery). The required parameters of notebook are resulted in the table of technical information.
Verification of devices rp and sa
For providing verification of capacity equipment, implementations of adjustings works and further technical maintenance of all microprocessor and electromechanics devices RP and SA on SS-330 kV in the process of exploitation, Contractor must give Customer a complete verification device.
A verification complete set must consist of:
microprocessor device of verification of equipment RP and SA;
managing device on the base of notebook with the special software.
Microprocessor device verification equipment RP and SA must have a complete package of the specialized software, necessary for verification of all types devices, and also necessary for this purpose accessories.
A management a verification device must be carried out from the personal computer (notebook), manned for this purpose necessary software and by accessories. Must be provided:
Possibility of work with primary sizes for verification basic and reserved protection;
possibility of work on verification functions of DPD (different phase defense) ,MCD ( maximal current defense ) , DD ( distance defense );
possibility to work with RIO by files;
support of format СОMTRADE.
Proof-of-concept complex for verification HF apparatuses
Trier for a generation test HF signals of tensions, analogical to those which act on an entrance HF defense and HF automations.
In retrograde through a device computer information must enter about a reaction HF devices on these test influences.
A complex must allow automatically to take off descriptions, design protocols of tests.
A proof-of-concept complex must execute generator and sensory functions for co-operating with checked up HF by an equipment.
HF generator (frequency 24 . 2500 kHz), R out = 0; 75; 150 Ohm;
LF generator (frequency is 20 Hertzs . 24 khz);
Source of control current (0 . 250 V=, 10 W);
HF and LF generators change frequency (in relation to set) both by (through virtual devices with a necessary step) hand and automatically.
The results of measurings must be designed as charts and tables, in form standard protocols and at pleasure to be accessible for unsealing on a printer.
Software must function in the environment of MICROSOFT WINDOWS XP / 7 or higher software providing must function in the environment of MICROSOFT WINDOWS XP / 7 or higher.
Low-voltage complete devices (LCD). Closets with the microprocessor terminals of defense
Requirements to execution
Climatic execution and category of placing of UKHl4 for GOST 15150-89 and GOST 15543.1-89. Degrees of defense of Ip40 on MEK 529 (GOST 14254-80).
LCD must be protected from electromagnetic hindrances, conditioned an origin s.c (shorting circuit ) .The corps of closets must be grounded..
Requirements on safety
Requirement to technique safety must correspond GOST 12.2.007.0-75, GOST 12.1.004-91 and to the requirements of RSEI ( rules of setting electrical installation ).
Structural requirements
A closet with a transparent front and steel postern must have sizes 2200x800x800 (HxWxD).
A closet must be equipped all wiring, terminals, relay, by lamps et al needed by accessories, subject approval by Customer.
Electric descriptions
Electric descriptions of closets must correspond GOST 22789-94.
Thus nominal parameters must have next values:
operative current - permanent;
nominal tension of chains control current - 220 V;
working turn-down tension of chains control current - from 0,8 to 1,1 U of nohm;
nominal tension of the second chains variable tension - 100 V, (50 Hertz’s);
nominal current of the second chains of alternating current – 1A or 5 A in depending on the transformer of current (50 Hertz’s);
nominal tension of auxiliary chains - 380/220 V, 50 Hertz’s.
Requirements to electric connections
Contact connections of wires in a low-voltage equipment must conform to the requirements GOST 10434-82.
Editing of wires - buildings.
For editing a copper, solid wire must be used, except for connections with mobile elements for which a wire must be flexible.
Section of wires concordantly RSEI p.3. 4.12, but no less:
for current chains and chains of tension are 2,5 mm;
for other chains are 1,5 mm.
Wires must not have a pull.
The electric editing must not hinder access to the removable and managed elements for examination, verification and their replacement.
The ends of free wires must be isolated.
All wires and apparatus must have marking, proper indicated on an of principle chart and chart of connections.
Contact connections of wires in LCD must correspond GOST 10434-82.
Requirement to the rows of clamps
These requirements do not spread on power clamps.
The rows of clamps must be set apeak on the assembling side of closet and disposed on the left and right side-frames.
Placing of clamps and apparatus on panels must provide comfortable access to the clamp of the second chains on any terminal.
Clamps must have connection "screw-screw" for the nominal section of explorers to 4 mm with a maximal loading current no less than 16 A and by nominal tension no less than 400 V.
Clamps must take from measurings clamp with release, communicating terminals and terminals with slide-type disconnectors.
Communicating clamps must be set in the chains of permanent and variable tension, operations in which will be executed an operative personnel with the use of separate make-and-break devices (switches, proof-of-concept blocks, sockets etc.). Number them determined a project for every panel concretely.
Communicating clamps with dis-connector must be set in the chains of direct-current, operations in which will be executed a relay personnel (chains of signaling, chains to the recorder of emergency events, chains of starting of commands of teleacceleration, prohibition ARI etc.). Number them determined a project for every panel concretely.
Clamps with slide-type release must be set in the measuring chains of TC (transformator of current) and TT (transformator of tension).
Contacts and all belongings of current-carrying chains must be protected from a casual touch in obedience to the standard of safety.
The construction of terminals must eliminate possibility of casual shorting nearby clamps.
In a complete set deliveries must be bridges, foreseen a chart (by a working document).
Class of inflammability for all types clamps V0 on the standard of Ul94.
Basic descriptions of clamps must conform to the requirements of standard of IEC 7-7.
Requirements to the make-and-break switchgears
The switches set in closets must provide reliable commutation of currents from 2 to 1000 mA at nominal tension 220 V.
Transitional resistance of contacts make-and-break devices must be no more than 0,002 Ohm.
The wearproofness is more than 25000 cycles.
Durability of isolation - 1000 V, during 1 minute.
Requirement to editing of apparatus
All make-and-break devices, proof-of-concept blocks, relays must be disposed on the external facial surface of closet.
Microprocessor devices of defense in a closet it is necessary to place at level, comfortable for service (height 1,4 - 1,7 m from the level of floor).
For fastening apparatuses must be used assembling laths.
Resistors, diodes, condensers must take place from the back (editing) side of plane for setting of apparatus.
Every vehicle must have marking in accordance with denotation of vehicle on an of principle chart.
Inscriptions of make-and-break devices, alarm apparatus etc. must be disposed under a device in a scope for inscription. Inscription must include marking and setting of vehicle.
Requirements to reliability
Reliability of low-voltage complete equipment indexes must correspond GOST 27.003-90, GOST 20.39.312-85.
Requirements to fire safety
The construction of closet must correspond the terms of fire safety in accordance with GOST 12.1.004-91.
Kitting
In the complete set of delivery LCD must enter:
closet with the internal editing of all necessary elements, including microprocessor device;
standard complete set of spare parts, recommended a factory-manufacturer;
operating document on ukraine /russian language.