    1. Information about a nomenclature and amount of the required materials (wires, cables and terminal closets)

Name

Units of measuring

Amount:

Required Customer

Guaranteed Participant

1.

Switching substation 330 kV

1.1

Linear armature and hollow wires 330 kV

complete set

A type and amount is determined Contractor on the stage of development of project document.

2.

Switching substation 110 kV

2.1

Linear armature and hollow wires 110 kV

complete set

A type and amount is determined Contractor on the stage of development of project document.

3.

Cables (power, control)

3.1

A cable is power 1 kV

m

Types and amount are determined Contractor on the stage of development of project document.

3.2

A cable is power 110 kV

m

3.3

Cable control

m

4.

Terminal closets

4.1

Terminal closets of the different setting

things.

Types and amount are determined Contractor on the stage of development of project document.

5.

Materials

5.1

Insulating gas (mixture of gases) for refueling of gas filled equipment, bulb

things

An amount is offered Contractor from a calculation a 1 bulb on 10 units of every type of equipment

Note: foregoing information behave to the detailed list of cables which must be put on the certain stage of realization of project, however subject a price is a change. All prices on cables in the Price table must be indicated as the Single sum.

Insulating gas for GIS in the indicated amount not included.

    1. Information about a nomenclature and amount of the required devices of instruments and adaptations

Name

Units of measurings

Amount:

Required Customer

Guaranteed Participant of auctions

1.

Complete set of service equipment for filling and pumping of insulating gas

complete set

1

2.

Detector (determinant) of flow of insulating gas

things

1

3.

Device for measuring of percentage of insulating gas, humidity, point of dew

things

1

4.

Mini fluidizer treatment of insulating gas

complete set

1

5.

Vacuum pump

things

1

6.

Service light cart for maintenance of insulating gas equipment

things

1

Note: In the complete set of supplying with positions 1 - 6 this table necessarily there must be operating documents: passports, guidances for exploitations or technical description and instructions on exploitation, and also assembly instruction on the Russian or Ukrainian languages.