    1. Requirements to the equipment hf treatments for organization hf ducting’s on wl (hf minelayer, condensers of connection)

Requirements to high-frequency minelayer`s:

  • High-frequency (HF) minelayer must consist of reactor and element of tuning. For defense of element of tuning in a complete set HF minelayer the terminator of overstrain must enter.

  • The element of tuning must provide tuning or re-erecting HF minelayer on a widely bar sub range in the working bar of frequencies (to the bar of barrage).

  • Construction HF minelayer must provide his setting on insulating supports or his pendant on the portal of substation (to high-voltage support).

  • HF minelayer must be made for exploitation in climatic terms in accordance with the variant of execution of U1 for GOST 15150-69 and to have the natural air cooling.

  • HF minelayer must have a degree of defense of Ip20 for GOST 14254-80.

  • Elements of construction HF minelayer must be proof to the sun radiation on all period of exploitation.

  • On a corps HF minelayer marking must be inflicted. Marking must be steady to external climatic influences.

Requirement to the condensers of connection:

  • The condensers of connection must have a corps, possessing high mechanical durability.

  • The condensers of connection must be made for exploitation in climatic terms in accordance with the variant of execution of U1 for GOST 15150-69.

  • The construction of condenser of connection must provide his setting on insulating supports.

  • The general capacity of condenser of connection (set of condensers of connection) must provide the concerted work with the connected filter of joining.

  • On the condensers of connection marking must be inflicted. Marking must be steady to external climatic influences.

Technical data sheets for primary equipment and infrastructure

  1. Assortment and quantity Technical Data Schedules Description

In the tables resulted below there is information about a nomenclature and amount of the equipment, devices, materials and cable wares, required Customer. These tables must be fully filled Participant of auctions and presented together with the tender offering to Customer.

The participants of auctions must understand that the unfilled cells of tables mean disparity the requirements of Customer (to the requirements of Contract), and the result of it can be a waiver of Customer of such tender suggestions.

The participant of auctions carries responsibility for any errors, disparity or omission in the tables filled them of technical information.

37 Information about a nomenclature and amount of the required equipment, materials, wares

    1. Information about a nomenclature and amount of the required high-voltage equipment and equipment of own needs.

Name

Units of measurings

Amount:

Required Customer

Guaranteed Participant

1.

GIS - 330 kV

complete set

1

2.

Terminator overstrain 330 kV

things

9

3.

HF minelayer WL - 330 kV

complete set

3

4.

Condenser of connection - 330 kV

things

3

5.

GIS - 110 кВ

complete set

1

6.

Terminator overstrain 110 kV

things

12

7.

Autotransformer lead-330/110 kV, Т-110/35 kV

complete set

2 + 4

HF minelayer WL - 110 kV

things

3

Condenser of connection - 110 kV

complete set

12

shield of own needs 0,4 kV

complete set

2

Shield of direct-current 220 V

complete set

2