  1. Fire safety

GIS 330 kV and 110 kV on SS projected for the I degrees of fire-resistance. Gis 330 kV and 110 kV concordantly NAPB 06.015-2006, category on explosive and fire hazard of apartments - "D". For every building there must be no less than two outputs. Width of passage-ways for the ways of evacuation is accepted no less than a 1,0 m, width of doors - no less than 0,8 m.

In the apartment of storage batteries SCR , the pressurized accumulators, selecting the very negligible quantity of hydrogen in the mode of subcharge and boosting battery, are set. Taking into account permanent operating system of natural reveal-drawing ventilation and dissolution of concentration of hydrogen, this concentration can not attain explosive indexes. The apartment of storage batteries is subsumed «D».

External fire-fighting system is provided from existing on SS of the circular plumbing with fire-cocks.

Internal fire-fighting system from fire faucets is not used. For apartments foreseen only primary facilities of fire-fighting.

The gasket of cable is executed taking into account the requirements of gl.2.3 PUE. Concordantly NAPB 05.031-2010 in cable trays through 50 m, and also in the places of branches fire-prevention belts are foreseen from sand.

Fireproof cable passage-ways are foreseen through build constructions with the limit of fire-resistance no less EI60, compression of openings round pipes, cables - with the limit of fire-resistance no less EI60 concordantly p.3.16 SNiP 3.05.06.-85, p.10.5 NAPB V.01.056-2005/iii.

  1. Sanitary Engineering Solutions

      1. Sanitary engineering apartments

Sanitary engineering apartments for workers, инженерно, auxiliary personnel of existent SS suffice and answer the requirements of SNiP II 92 -76 part 11.

To provide for a project gasket of plumbing in the sanitary-domestic apartments of (PPM - ОПУ перевод ?) .

      1. Canalization

The use of existent cleansing buildings of sullage flows is foreseen. Sewer water must pass the complete cycle of bioscrubbing, frequent airing and interfusion.

To foresee the gasket of the sewage system in the sanitary-domestic apartments of (PPM- ОПУ перевод?).

  1. Heating, ventilation and conditioning

The project of heating, ventilation and conditioning must be executed in obedience to the requirements of SNiP a 2.04.05-91 "Heating, ventilation and climatization".

Heating of apartments of SS is foreseen from electric (конвекторов перевод?).

In buildings of (КРУЭ перевод ?) heating for maintenance of temperature is foreseen not below plus 8 °С, during finding of personnel plus 22 °С.

  1. Requirements to materials, equipment, structures, systems, conductors and cables

    1. Special requirements

All equipment supplied by the Contractor, materials, structures, systems and cables used for work implementation, as well as special accessories, tools and instruments necessary for operation and maintenance of the newly installed equipment at the SS , shall be certified in Ukraine according to Ukrainian national requirements.

The measuring instruments shall be registered in the State Register of measuring devices approved for use in Ukraine.

All supplied equipment, structures, fittings, measuring instruments and materials shall be new, unused, have standard manufacturer's design. They shall be designed taking into account the latest the codes and standards, and manufactured using state-of-the-art technologies.

The Contractor shall confirm quality and origin of the goods by the corresponding type test certificates.

During construction, transportation, storage at the Employer's warehouse, as well as during assembly, installation, acceptance testing, commissioning and trial operation, the Contractor shall comply with all requirements specified in the latest editions of Ukrainian normative documents regarding the following aspects:

а) labour protection ;

b) fire safety;

c) environment protection safety.

The Contractor shall own or have guaranteed access (by means of rent, leasing, sales contract, availability of production facilities or otherwise) in the Employer's country to all load-lifting mechanisms and accessories), machines, mechanisms, equipment and accessories, which shall be fully functional and capable of performing all kinds of works.

The Contractor shall have all the tools, materials and equipment needed for temporary operations, such as de-energization, dismantling, disconnection, connection, transfer, which may be required during installation.

All equipment supplied by the Contractor shall:

a) be designed in such a way, in order to ensure reliable and continuous operation in the climatic conditions of the substation`s location;

b) guarantee reliable operation;

c) have the required insulation level;

d) withstand possible mechanical impacts (load and voltage variations) that may occur during this substation`s operation.

The Contractor shall provide sufficient amount of operation and maintenance instructions or manuals in Russian or Ukrainian language for the supplied equipment, as-built drawings, supply of all mandatory spare parts, special tools and repair equipment.

All supplied high-voltage equipment, AC and DC auxiliary equipment shall have possibility of integration into the APCS of the substation.

The detailed technical characteristics of the supplied equipment are given in the corresponding Sheets of Volume III "Technical Data Sheets"

    1. GIS – 330 кВ и GIS – 110 кВ

GIS must be supplied with all necessary terminal boxes, priming of insulating gas, power wiring and management, grounding, device of monitoring of closeness of insulating gas and support structure. Size of supplied with the preliminary collected sections must be so large, as far as it is practical possibly for transporting.

A capacity, tests and estimation of GIS, must correspond the versions of next editions of IEC:

Description

Norms and standards

General descriptions for switchgears and switching substation of high tension.

IEC 62271-1

GIS of nominal tension of 52kV and higher

IEC 62271-203

High-voltage switches of alternating current

IEC 62271-100

Isolating switch and ground-wire of alternating current

IEC 62271-102

High-voltage isolating switch of alternating current

IEC 62271-108

Current transformers

IEC 61869-1 / -2

Inductive transformers of tension

IEC 61869-1 / -3

Metal-oxide terminators of overstrain without spark intervals for the systems of alternating current

IEC 60099-4

Isolated input`s for variable tensions higher 1000V

IEC 60137

Insulating gas SF6

IEC60376

Partial charge

IEC 60270

Direct connection of transformers of high tension

IEC/TR2 61639

High-voltage cable connection

IEC 62271-209

Carcass under constraint

CENELEC EN50052 und EN 50064

Nominal parameters of completed GIS must be in accordance with Table of technical requirements.

All current-conduction components of equipment must be expected for the protracted work at nominal currents without exceeding of maximal temperature, marked in the proper standards of IEC.

GIS supplier must have at least 20 years of experience in planning, production, setting and putting into the operation of insulating gas equipment for the use in networks 110 kV and higher.

A period of free technical service for any external component GIS must be no less than 5 years. For internal components, including the gas refuelling, this term must be no less than 10 years. A supplier must offer the recommended period of service.

REQUIREMENTS TO GIS

A distributive device must be a free-standing, free-standing construction with all high-voltage equipment, set inwardly GIS, in the metallic earthed corps it parts on separate gas compartments, at least for:

- sections of tires with proper isolating switch;

- switch;

- line isolating switch.

Location of separate cells of distributive devices must be executed so that to attain the optimum economy of place, exact and logical location.

Every extreme area of tires must be projected taking into account future expansion of distributive device. Bus end connectors must be accordingly projected.

All blocking, potentially preventing wrong operations, must be constructed so that they can not it was be easily gone round.

Access to any component must be possible enough. Real position of isolating switch and ground knives must be expressly represented facilities of reliable indication.

All components of identical face values and constructions which will demand replacement possibly must be interchangeable.

The supplied with components, tested at the plant, must be united in place of setting only through screw-bolt impermeable connection. Welding of components is in place shut out.

A distributive device must have separate gas compartments, with gas dense barriers between every compartment. A gas compartment must be projected:

– to minimize the operating disconnecting, when pressure of gas goes down in investigation of loss or operating reasons;

– to minimize a gas amount which it is needed to pump out and recharge after maintenance of any part of equipment.

Every gas compartment must be equipped necessary valves, to provide pumping and gas refuelling without pumping from any other compartment. To reduce possibility of loss, connection pipes between gas compartments is shut out.

Every gas compartment must be equipped a static filter. These filters must be in a position to absorb any aquatic steam which can penetrate into a construction, and must be effective on an extent at least between basic conclusions in repair.

Transformers of current preferably must be with mandrels, located outside insulating gas shells.

Every gas area must be equipped the system of monitoring of insulating gas, consisting of device of the permanent monitoring of closeness of insulating gas.

Gas-proof barriers and supporting insulators must be projected so that to keep a high reserve after durability of construction and electric dielectric properties.

Gas-proof barriers must be projected so that to maintain the maximal overfall of pressure, which can arise up on all barrier, I.e. maximal working pressure from one side and vacuum with other.