- •16.1 General requirements 22
- •21.1 General requirements 26
- •22. Requirements to Organization of Construction Works 32
- •22.1 General requirements 32
- •23. Requirements to works 38
- •29. Requirements for the switchgear arrangement 330 kV and 110 kV 60
- •35.1 Special requirements 79
- •36. Assortment and quantity 96
- •37 Information about a nomenclature and amount of the required equipment, materials, wares 97
- •38 Tables of technical information 98
- •III. Special technical requirements to relay protection and automation system 116
- •39 General 116
- •39.4 Training 118
- •40 General Functional Requirements to Elements of Relay Protection and Special Automatics System 123
- •41 Nomenclature and amount supplied with the equipment of the systems electric defense and automation of substation 330 kV «Zhovtneva» 143
- •42 Tables of technical information for the system of relay protection and automation 145
- •43. General 204
- •43.1 Scope of Works 204
- •44. Purpose and Objectives of acs tp ss 206
- •45. Functions Performed by the acs tp ss 207
- •46. Description of the Automation Object 212
- •47. Implementation of acs tp basic functions 213
- •48. Organization of acs tp ss 220
- •48.3.1 General requirements 221
- •48.5.1 General Requirements 230
- •49. Requirement to the Types of Support 235
- •55. Technical data table for acsee 269
- •Section I. General technical requirements
- •General requirements
- •Feasibility study
- •Scope of works
- •Improvement and land scaping territory:
- •System of units The entire technical documentation shall use the International System of Units (si), in accordance withthe provisions of theIso/iec 80000.
- •Guaranteed values
- •Special requirements
- •Coordination of activities
- •Regulations, Standards and Rules
- •Unification and interchangeability
- •Materials and quality
- •Quality assurance system
- •Main principles
- •Notification on defects
- •Standard tools
- •Special accessories, instruments and tools
- •Spare parts
- •Basic requirements
- •Mandatory spare parts
- •Recommended spare parts
- •Packing, shipping, transportation and load-lifting mechanisms
- •Packing
- •Shipping and transportation
- •Load-lifting operations
- •Labels and Nameplates
- •Signs essential in case of emergency
- •Mandatory signs
- •Factory tests and factory test reports
- •Inspections and site tests
- •Test reports and test programs
- •Factory test reports
- •Test programs
- •Warranty
- •Training
- •Documentation
- •General requirements
- •Design coordination procedure
- •Responsibility for errors in data and drawings
- •Design alteration procedures
- •Works implementation program and schedule
- •Project for Organization of Construction
- •Reports on works performed
- •Progress meetings reports
- •Installation and commissioning instructions
- •Operating and maintenance manual
- •Requirements to Organization of Construction Works
- •General requirements
- •Permits and licenses for works implementation
- •Temporary sites
- •Supply of construction site
- •Maintenance and cleaning of construction site
- •Organization and quality assurance of civil and erection works
- •Safety and labour protection requirements
- •Fire safety
- •Environmental protection. Environment protection and socialmanagement plan.
- •Requirements to works
- •Land measuring
- •Earthworks
- •Concrete Works
- •Foundations
- •Covered-up works and covered-up works reports
- •Erection works
- •Electrical installation works
- •Start-up and commissioning
- •Insulation and corrosion-protection works
- •Painting
- •Roofing and waterproofing
- •Operational acceptance of the completed facility
- •Section II. Specific technical requirements primery equipment
- •General information on the project
- •System 110 kV
- •The scope of works and services
- •General Provisions
- •The scope of work for the substation
- •Buildings primary purpose
- •The design solutions for buildings main destination
- •Requirements for the switchgear arrangement 330 kV and 110 kV
- •Basic design-layout solutions
- •Monitoring subsystem gis 330/110
- •Purpose and functions
- •Auxiliaries substation
- •Shields own needs
- •Power supply consumers during construction
- •Monitoring of existing at
- •31 Requirements to works, services, materials, structures and main electrical equipment
- •Overvoltage protection , external insulation, grounding system, lighting system , beacons mounted on top of high structures, biological protection
- •Lightning protection system
- •External insulation
- •Requirements grounding system implementation
- •Handing over in exploitation of the earth system
- •Lighting system
- •Biological protection
- •Requirements to works and structural materials
- •Concrete and reinforced-concrete structures
- •Metallic structures
- •Corrosion protection
- •Painting
- •Deviation tolerances of building structures
- •Shipment and transportation
- •Load-lifting mechanisms and accessories
- •Warranty
- •General layout and transportation system ; Access roads at the site
- •Inspection and tests
- •Factory tests and factory test reports
- •Site tests
- •Fire safety
- •Requirements to materials, equipment, structures, systems, conductors and cables
- •Special requirements
- •Insulating gas
- •Isolating switch
- •Inputs are «insulating gas-air»
- •Terminators of overstrain
- •Shield of own needs 0,4 kV
- •Shield of direct-current 220 V
- •Cables and cable trays
- •Power cables
- •Control cables
- •Requirements to the equipment hf treatments for organization hf ducting’s on wl (hf minelayer, condensers of connection)
- •Technical data sheets for primary equipment and infrastructure
- •Assortment and quantity Technical Data Schedules Description
- •37 Information about a nomenclature and amount of the required equipment, materials, wares
- •Information about a nomenclature and amount of the required high-voltage equipment and equipment of own needs.
- •Information about a nomenclature and amount of the required materials (wires, cables and terminal closets)
- •Information about a nomenclature and amount of the required devices of instruments and adaptations
- •Tables of technical information
- •Expls to the tables
- •Technical requirements to gis - 330 kV
- •Technical requirements to gis – 110 kV
- •Technical requirements to the terminator of overstrain 330 kV
- •Technical requirements to the terminator of overstrain 110 kV
- •Technical requirements to the shield of own needs 0,4 kV
- •В Technical requirements to the shield of direct-current 220 V
- •Technical information of high-frequency minelayer for wl 330 kV
- •Technical information of condensers of connection for wl 330 kV
- •Technical information of high-frequency minelayer for wl 110 kV
- •Technical information of condensers of connection for wl 110 kV
- •III. Special technical requirements to relay protection and automation system
- •General
- •Scope of Work Overview
- •Contractor`s Duties
- •Dismantling
- •Training
- •Operational Conditions
- •General Design Requirements
- •Requirements to Microprocessor Devices Regarding External Interface
- •Software Requirements
- •Requirements to Control Cables
- •Spare Parts and Special Tools
- •Warranty Maintenance
- •Requirements to Methodology Buidelines Regarding Selection of Setting for Relay Protection and Special Automatics
- •General Functional Requirements to Elements of Relay Protection and Special Automatics System
- •Devices of Protection of Automatic Transformers 330 kV for at with Phase Shifting Transformer
- •High-frequency transceivers for basic differential-phase defense of line on a microelectronic element base
- •Complete set of automation of management a switch 330 kV with the functions of dbrs, ari
- •Complete set by a basic differential-phase hf defense of wl-110 kV with the functions of reserve defense
- •Complete set of basic differential defense of wl-110 kV (transmission of signal on fibre-optic communication line) with the functions of reserve defense
- •Complete set of defense wl-110 kV (on the controlled from distance and current principle) with funk-ciey dbrs,ari
- •Complete set of defense cs(connecting switch) -110 kV, bcs(bus connecting switch )-110 kV on current principle with the function dbrs
- •Complete set of automation of management a switch 110 kV with the functions dbrs, ari, fld (fixing of line disconnecting)
- •Dbrs function
- •Functions of ari device
- •Device of fixing disconnecting and including line (fld and fli))
- •Automation device of liquidation asynchronous mode (adla)
- •Complete set for the transmission commands rp (relay protection) and sa (special automatic )
- •Requirements to the dividing filters for organization hf ductings
- •Requirement to the joining filter for organization hf channels
- •Requirements to the radio-frequency cable for joining hf apparatus to the hf highway
- •Requirement to the devices of determining damage location (ddl) by a wave method
- •Complete set for the transmission of command rp and sa on fcl
- •Complete set of defense autotransformers 330 kV on differential, controlled from distance and current principle (basic and dublicate)
- •Complete set of defense transformers 110 kV on differential, controlled from distance and current principle
- •Complete set of differential defense of tires 330 kV and 110 kV
- •Complete set of differential defense bus arrangement 330 kV and 110 kV
- •Complete set for adjusting and verification equipment of relay protection and special automatic
- •Verification of devices rp and sa
- •Nomenclature and amount supplied with the equipment of the systems electric defense and automation of substation 330 kV «Zhovtneva»
- •Tables of technical information for the system of relay protection and automation
- •Generals
- •Terminology
- •Technical information of complete set of basic differential-phase defence wl-330 kV
- •Technical data post high-frequency protection (for overhead lines of 330 kV and 110 kV)
- •Technical data sets main differential protection of 330 kV overhead (with signal transmission on fiber optic)
- •Technical data set up protection of 330 kV overhead (on the remote and current principle)
- •Technical data sets automatic control switch with 330 kV circuit breaker failure protection, ar
- •Technical data sets basic differential-phase protections of 110 kV
- •Technical data sets main differential protection of wl-110 kV
- •Technical data set up protection of 110 kV (on the remote and the current principle)
- •Technical Data Security Kit cs-110 kV, bcs- 110 kV bus coupler on the current printsipes the breaker failure protection
- •Technical data sets automatic control switch with 110 kV circuit breaker failure protection, ar, fld
- •Technical data sets of differential busbar protection / busbar 330 kV
- •Technical data sets of differential busbar protection / busbar 110 kV
- •Technical Data Security Kit autotransformers 330/110 kV differential, distance and current principle (main and backup set)
- •Technical Data Security Kit transformers 110/35 kV differential, distance and current principle
- •Technical data protection management set rpn transformers
- •Technical data kit
- •Technical Data Automation Kit elimination of asynchronous operation
- •Technical data set command rp and sa - Tx, Rx
- •Technical data sets and data relay protection and emergency teams on fcl
- •Requirements Crossover
- •Requirements for coupling filter (wl-110 kV)
- •Requirements for coupling filter (wl-330 kV)
- •Requirements for Radio-frequency cables
- •Technical data sets to test relay protection
- •Technical data test set to test hf devices
- •Technical Data laptop
- •Special IV. Special technical requirements to automated control system for technological process
- •General
- •Scope of Works
- •Project Structure
- •Contractor`s duties
- •Purpose and Objectives of acs tp ss
- •Purpose of acs tp of the Substation
- •Objectives of the acs tp of the Substation
- •Equipment operating modes monitorin
- •Automated substation equipment control
- •Warning and alarm system organization
- •Warning system
- •Alarm system:
- •Registration of emergencies
- •Prоviding current and archived data for operating personnel and other users
- •Data exchange with other levels of control hierarchy
- •System-wide functions
- •Description of the Automation Object
- •Implementation of acs tp basic functions
- •General requirement
- •Monitoring of the Substation Current Mode and the Key Diagram Status
- •Equipment Status Monitoring
- •Process parameters monitoring
- •Control Process Automation
- •Automated Management Services
- •Control of the Substation Components
- •Control of 330 – 110 kV Switching Units
- •Control of 35 – 10 kV Switching Units
- •Software and hardware of acs tp
- •General requirements
- •Requirements to the substation level devices
- •Requirements to the connection and process level devices
- •Intelligent Electronic Devices (ied)
- •Requirements to lan
- •Requirements to electromagnetic compatibility of shs acs tp
- •Requirement to reliability of the acs tp software/hardware
- •Requirement to Safety
- •Ensuring of equipment operating conditions
- •Requirement to control and optical cables
- •Testing and self-diagnostics of the shs components
- •Requirements for the maintenance and repair
- •Arrangement of power supply
- •Requirement for Embodiment of Control Cabinet
- •Data exchanges with higher levels of dispatcher control
- •Interaction with adjacent subsystems
- •General Requirements
- •Interaction with aspfm
- •Interaction with relay protection an emergency controls
- •Interaction with substation main equipment monitoring subsystem
- •Interaction with the security video surveillance subsystem
- •Requirement to cyber security
- •Requirements to ergonomics and industrial design
- •Requirement to patent clearance
- •Requirements to standardisation and unification
- •Requirement to the Types of Support
- •Requirements to mathematical support
- •Requirements to information support
- •Requirement to linguistic support
- •Requirements to software
- •Requirements to measurement assurance/metrological support
- •Requirements to spare parts and accessories
- •Requirement to Documentation
- •Technical documentation
- •Project documentation
- •Operational documentation
- •Requirement for acceptance tests
- •General
- •Guarantees
- •Technical data table for the acs tp
- •General
- •Functional requirement Table 1.1: Technical requirements to acs tp hardware and software
- •Section V. Special specifications for automated metering system
- •Setting and purpose of creation the system
- •Purpose acsee ss
- •The purpose of the acsee ss
- •Description of object of automation
- •System requirements
- •General system requirements
- •Requirements for the structure and functioning of the system
- •Reliability requirements
- •Requirements for Safety
- •Requirements to ergonomics and technical aesthetics
- •Requirements for the operation, maintenance, repair and preservation of the system components
- •Requirements for the protection of information from unauthorized access
- •Requirements for the preservation of information in case of emergencies
- •Requirements for protection from the influence of external factors
- •Requirements for the standardization and unification
- •Power Requirements
- •Feature Requirements acsee ss
- •Functions and settings tasks acsee ss
- •Requirements for the type of collateral
- •Requirements of a software
- •Requirements for data provision
- •Requirements for linguistic support
- •Software Requirements
- •Hardware requirements
- •Requirements for the counters of electric power
- •The requirements for communication cabinet acsee ss
- •The requirements for awp
- •The requirements for communication channels
- •Requirements for metrological support
- •Requirements for Organizational Support
- •Requirements to acsse
- •Regulations
- •Technical data table for acsee
- •The range and number
- •Table 2.1: Information regarding the number and amount of equipment required for electricity metering points ss
- •Table 2.2: Data on the nomenclature and the amount of the required hardware and software acsee
- •Table 2.3: Composition Software
- •Technical data table
- •Table 5.1 Technical requirements for electronic multifunction electricity meter
Fire safety
GIS 330 kV and 110 kV on SS projected for the I degrees of fire-resistance. Gis 330 kV and 110 kV concordantly NAPB 06.015-2006, category on explosive and fire hazard of apartments - "D". For every building there must be no less than two outputs. Width of passage-ways for the ways of evacuation is accepted no less than a 1,0 m, width of doors - no less than 0,8 m.
In the apartment of storage batteries SCR , the pressurized accumulators, selecting the very negligible quantity of hydrogen in the mode of subcharge and boosting battery, are set. Taking into account permanent operating system of natural reveal-drawing ventilation and dissolution of concentration of hydrogen, this concentration can not attain explosive indexes. The apartment of storage batteries is subsumed «D».
External fire-fighting system is provided from existing on SS of the circular plumbing with fire-cocks.
Internal fire-fighting system from fire faucets is not used. For apartments foreseen only primary facilities of fire-fighting.
The gasket of cable is executed taking into account the requirements of gl.2.3 PUE. Concordantly NAPB 05.031-2010 in cable trays through 50 m, and also in the places of branches fire-prevention belts are foreseen from sand.
Fireproof cable passage-ways are foreseen through build constructions with the limit of fire-resistance no less EI60, compression of openings round pipes, cables - with the limit of fire-resistance no less EI60 concordantly p.3.16 SNiP 3.05.06.-85, p.10.5 NAPB V.01.056-2005/iii.
Sanitary Engineering Solutions
Sanitary engineering apartments
Sanitary engineering apartments for workers, инженерно, auxiliary personnel of existent SS suffice and answer the requirements of SNiP II 92 -76 part 11.
To provide for a project gasket of plumbing in the sanitary-domestic apartments of (PPM - ОПУ перевод ?) .
Canalization
The use of existent cleansing buildings of sullage flows is foreseen. Sewer water must pass the complete cycle of bioscrubbing, frequent airing and interfusion.
To foresee the gasket of the sewage system in the sanitary-domestic apartments of (PPM- ОПУ перевод?).
Heating, ventilation and conditioning
The project of heating, ventilation and conditioning must be executed in obedience to the requirements of SNiP a 2.04.05-91 "Heating, ventilation and climatization".
Heating of apartments of SS is foreseen from electric (конвекторов перевод?).
In buildings of (КРУЭ перевод ?) heating for maintenance of temperature is foreseen not below plus 8 °С, during finding of personnel plus 22 °С.
Requirements to materials, equipment, structures, systems, conductors and cables
Special requirements
All equipment supplied by the Contractor, materials, structures, systems and cables used for work implementation, as well as special accessories, tools and instruments necessary for operation and maintenance of the newly installed equipment at the SS , shall be certified in Ukraine according to Ukrainian national requirements.
The measuring instruments shall be registered in the State Register of measuring devices approved for use in Ukraine.
All supplied equipment, structures, fittings, measuring instruments and materials shall be new, unused, have standard manufacturer's design. They shall be designed taking into account the latest the codes and standards, and manufactured using state-of-the-art technologies.
The Contractor shall confirm quality and origin of the goods by the corresponding type test certificates.
During construction, transportation, storage at the Employer's warehouse, as well as during assembly, installation, acceptance testing, commissioning and trial operation, the Contractor shall comply with all requirements specified in the latest editions of Ukrainian normative documents regarding the following aspects:
а) labour protection ;
b) fire safety;
c) environment protection safety.
The Contractor shall own or have guaranteed access (by means of rent, leasing, sales contract, availability of production facilities or otherwise) in the Employer's country to all load-lifting mechanisms and accessories), machines, mechanisms, equipment and accessories, which shall be fully functional and capable of performing all kinds of works.
The Contractor shall have all the tools, materials and equipment needed for temporary operations, such as de-energization, dismantling, disconnection, connection, transfer, which may be required during installation.
All equipment supplied by the Contractor shall:
a) be designed in such a way, in order to ensure reliable and continuous operation in the climatic conditions of the substation`s location;
b) guarantee reliable operation;
c) have the required insulation level;
d) withstand possible mechanical impacts (load and voltage variations) that may occur during this substation`s operation.
The Contractor shall provide sufficient amount of operation and maintenance instructions or manuals in Russian or Ukrainian language for the supplied equipment, as-built drawings, supply of all mandatory spare parts, special tools and repair equipment.
All supplied high-voltage equipment, AC and DC auxiliary equipment shall have possibility of integration into the APCS of the substation.
The detailed technical characteristics of the supplied equipment are given in the corresponding Sheets of Volume III "Technical Data Sheets"
GIS – 330 кВ и GIS – 110 кВ
GIS must be supplied with all necessary terminal boxes, priming of insulating gas, power wiring and management, grounding, device of monitoring of closeness of insulating gas and support structure. Size of supplied with the preliminary collected sections must be so large, as far as it is practical possibly for transporting.
A capacity, tests and estimation of GIS, must correspond the versions of next editions of IEC:
Description |
Norms and standards |
General descriptions for switchgears and switching substation of high tension. |
IEC 62271-1 |
GIS of nominal tension of 52kV and higher |
IEC 62271-203 |
High-voltage switches of alternating current |
IEC 62271-100 |
Isolating switch and ground-wire of alternating current |
IEC 62271-102 |
High-voltage isolating switch of alternating current |
IEC 62271-108 |
Current transformers |
IEC 61869-1 / -2 |
Inductive transformers of tension |
IEC 61869-1 / -3 |
Metal-oxide terminators of overstrain without spark intervals for the systems of alternating current |
IEC 60099-4 |
Isolated input`s for variable tensions higher 1000V |
IEC 60137 |
Insulating gas SF6 |
IEC60376 |
Partial charge |
IEC 60270 |
Direct connection of transformers of high tension |
IEC/TR2 61639 |
High-voltage cable connection |
IEC 62271-209 |
Carcass under constraint |
CENELEC EN50052 und EN 50064 |
Nominal parameters of completed GIS must be in accordance with Table of technical requirements.
All current-conduction components of equipment must be expected for the protracted work at nominal currents without exceeding of maximal temperature, marked in the proper standards of IEC.
GIS supplier must have at least 20 years of experience in planning, production, setting and putting into the operation of insulating gas equipment for the use in networks 110 kV and higher.
A period of free technical service for any external component GIS must be no less than 5 years. For internal components, including the gas refuelling, this term must be no less than 10 years. A supplier must offer the recommended period of service.
REQUIREMENTS TO GIS
A distributive device must be a free-standing, free-standing construction with all high-voltage equipment, set inwardly GIS, in the metallic earthed corps it parts on separate gas compartments, at least for:
- sections of tires with proper isolating switch;
- switch;
- line isolating switch.
Location of separate cells of distributive devices must be executed so that to attain the optimum economy of place, exact and logical location.
Every extreme area of tires must be projected taking into account future expansion of distributive device. Bus end connectors must be accordingly projected.
All blocking, potentially preventing wrong operations, must be constructed so that they can not it was be easily gone round.
Access to any component must be possible enough. Real position of isolating switch and ground knives must be expressly represented facilities of reliable indication.
All components of identical face values and constructions which will demand replacement possibly must be interchangeable.
The supplied with components, tested at the plant, must be united in place of setting only through screw-bolt impermeable connection. Welding of components is in place shut out.
A distributive device must have separate gas compartments, with gas dense barriers between every compartment. A gas compartment must be projected:
– to minimize the operating disconnecting, when pressure of gas goes down in investigation of loss or operating reasons;
– to minimize a gas amount which it is needed to pump out and recharge after maintenance of any part of equipment.
Every gas compartment must be equipped necessary valves, to provide pumping and gas refuelling without pumping from any other compartment. To reduce possibility of loss, connection pipes between gas compartments is shut out.
Every gas compartment must be equipped a static filter. These filters must be in a position to absorb any aquatic steam which can penetrate into a construction, and must be effective on an extent at least between basic conclusions in repair.
Transformers of current preferably must be with mandrels, located outside insulating gas shells.
Every gas area must be equipped the system of monitoring of insulating gas, consisting of device of the permanent monitoring of closeness of insulating gas.
Gas-proof barriers and supporting insulators must be projected so that to keep a high reserve after durability of construction and electric dielectric properties.
Gas-proof barriers must be projected so that to maintain the maximal overfall of pressure, which can arise up on all barrier, I.e. maximal working pressure from one side and vacuum with other.