- •16.1 General requirements 22
- •21.1 General requirements 26
- •22. Requirements to Organization of Construction Works 32
- •22.1 General requirements 32
- •23. Requirements to works 38
- •29. Requirements for the switchgear arrangement 330 kV and 110 kV 60
- •35.1 Special requirements 79
- •36. Assortment and quantity 96
- •37 Information about a nomenclature and amount of the required equipment, materials, wares 97
- •38 Tables of technical information 98
- •III. Special technical requirements to relay protection and automation system 116
- •39 General 116
- •39.4 Training 118
- •40 General Functional Requirements to Elements of Relay Protection and Special Automatics System 123
- •41 Nomenclature and amount supplied with the equipment of the systems electric defense and automation of substation 330 kV «Zhovtneva» 143
- •42 Tables of technical information for the system of relay protection and automation 145
- •43. General 204
- •43.1 Scope of Works 204
- •44. Purpose and Objectives of acs tp ss 206
- •45. Functions Performed by the acs tp ss 207
- •46. Description of the Automation Object 212
- •47. Implementation of acs tp basic functions 213
- •48. Organization of acs tp ss 220
- •48.3.1 General requirements 221
- •48.5.1 General Requirements 230
- •49. Requirement to the Types of Support 235
- •55. Technical data table for acsee 269
- •Section I. General technical requirements
- •General requirements
- •Feasibility study
- •Scope of works
- •Improvement and land scaping territory:
- •System of units The entire technical documentation shall use the International System of Units (si), in accordance withthe provisions of theIso/iec 80000.
- •Guaranteed values
- •Special requirements
- •Coordination of activities
- •Regulations, Standards and Rules
- •Unification and interchangeability
- •Materials and quality
- •Quality assurance system
- •Main principles
- •Notification on defects
- •Standard tools
- •Special accessories, instruments and tools
- •Spare parts
- •Basic requirements
- •Mandatory spare parts
- •Recommended spare parts
- •Packing, shipping, transportation and load-lifting mechanisms
- •Packing
- •Shipping and transportation
- •Load-lifting operations
- •Labels and Nameplates
- •Signs essential in case of emergency
- •Mandatory signs
- •Factory tests and factory test reports
- •Inspections and site tests
- •Test reports and test programs
- •Factory test reports
- •Test programs
- •Warranty
- •Training
- •Documentation
- •General requirements
- •Design coordination procedure
- •Responsibility for errors in data and drawings
- •Design alteration procedures
- •Works implementation program and schedule
- •Project for Organization of Construction
- •Reports on works performed
- •Progress meetings reports
- •Installation and commissioning instructions
- •Operating and maintenance manual
- •Requirements to Organization of Construction Works
- •General requirements
- •Permits and licenses for works implementation
- •Temporary sites
- •Supply of construction site
- •Maintenance and cleaning of construction site
- •Organization and quality assurance of civil and erection works
- •Safety and labour protection requirements
- •Fire safety
- •Environmental protection. Environment protection and socialmanagement plan.
- •Requirements to works
- •Land measuring
- •Earthworks
- •Concrete Works
- •Foundations
- •Covered-up works and covered-up works reports
- •Erection works
- •Electrical installation works
- •Start-up and commissioning
- •Insulation and corrosion-protection works
- •Painting
- •Roofing and waterproofing
- •Operational acceptance of the completed facility
- •Section II. Specific technical requirements primery equipment
- •General information on the project
- •System 110 kV
- •The scope of works and services
- •General Provisions
- •The scope of work for the substation
- •Buildings primary purpose
- •The design solutions for buildings main destination
- •Requirements for the switchgear arrangement 330 kV and 110 kV
- •Basic design-layout solutions
- •Monitoring subsystem gis 330/110
- •Purpose and functions
- •Auxiliaries substation
- •Shields own needs
- •Power supply consumers during construction
- •Monitoring of existing at
- •31 Requirements to works, services, materials, structures and main electrical equipment
- •Overvoltage protection , external insulation, grounding system, lighting system , beacons mounted on top of high structures, biological protection
- •Lightning protection system
- •External insulation
- •Requirements grounding system implementation
- •Handing over in exploitation of the earth system
- •Lighting system
- •Biological protection
- •Requirements to works and structural materials
- •Concrete and reinforced-concrete structures
- •Metallic structures
- •Corrosion protection
- •Painting
- •Deviation tolerances of building structures
- •Shipment and transportation
- •Load-lifting mechanisms and accessories
- •Warranty
- •General layout and transportation system ; Access roads at the site
- •Inspection and tests
- •Factory tests and factory test reports
- •Site tests
- •Fire safety
- •Requirements to materials, equipment, structures, systems, conductors and cables
- •Special requirements
- •Insulating gas
- •Isolating switch
- •Inputs are «insulating gas-air»
- •Terminators of overstrain
- •Shield of own needs 0,4 kV
- •Shield of direct-current 220 V
- •Cables and cable trays
- •Power cables
- •Control cables
- •Requirements to the equipment hf treatments for organization hf ducting’s on wl (hf minelayer, condensers of connection)
- •Technical data sheets for primary equipment and infrastructure
- •Assortment and quantity Technical Data Schedules Description
- •37 Information about a nomenclature and amount of the required equipment, materials, wares
- •Information about a nomenclature and amount of the required high-voltage equipment and equipment of own needs.
- •Information about a nomenclature and amount of the required materials (wires, cables and terminal closets)
- •Information about a nomenclature and amount of the required devices of instruments and adaptations
- •Tables of technical information
- •Expls to the tables
- •Technical requirements to gis - 330 kV
- •Technical requirements to gis – 110 kV
- •Technical requirements to the terminator of overstrain 330 kV
- •Technical requirements to the terminator of overstrain 110 kV
- •Technical requirements to the shield of own needs 0,4 kV
- •В Technical requirements to the shield of direct-current 220 V
- •Technical information of high-frequency minelayer for wl 330 kV
- •Technical information of condensers of connection for wl 330 kV
- •Technical information of high-frequency minelayer for wl 110 kV
- •Technical information of condensers of connection for wl 110 kV
- •III. Special technical requirements to relay protection and automation system
- •General
- •Scope of Work Overview
- •Contractor`s Duties
- •Dismantling
- •Training
- •Operational Conditions
- •General Design Requirements
- •Requirements to Microprocessor Devices Regarding External Interface
- •Software Requirements
- •Requirements to Control Cables
- •Spare Parts and Special Tools
- •Warranty Maintenance
- •Requirements to Methodology Buidelines Regarding Selection of Setting for Relay Protection and Special Automatics
- •General Functional Requirements to Elements of Relay Protection and Special Automatics System
- •Devices of Protection of Automatic Transformers 330 kV for at with Phase Shifting Transformer
- •High-frequency transceivers for basic differential-phase defense of line on a microelectronic element base
- •Complete set of automation of management a switch 330 kV with the functions of dbrs, ari
- •Complete set by a basic differential-phase hf defense of wl-110 kV with the functions of reserve defense
- •Complete set of basic differential defense of wl-110 kV (transmission of signal on fibre-optic communication line) with the functions of reserve defense
- •Complete set of defense wl-110 kV (on the controlled from distance and current principle) with funk-ciey dbrs,ari
- •Complete set of defense cs(connecting switch) -110 kV, bcs(bus connecting switch )-110 kV on current principle with the function dbrs
- •Complete set of automation of management a switch 110 kV with the functions dbrs, ari, fld (fixing of line disconnecting)
- •Dbrs function
- •Functions of ari device
- •Device of fixing disconnecting and including line (fld and fli))
- •Automation device of liquidation asynchronous mode (adla)
- •Complete set for the transmission commands rp (relay protection) and sa (special automatic )
- •Requirements to the dividing filters for organization hf ductings
- •Requirement to the joining filter for organization hf channels
- •Requirements to the radio-frequency cable for joining hf apparatus to the hf highway
- •Requirement to the devices of determining damage location (ddl) by a wave method
- •Complete set for the transmission of command rp and sa on fcl
- •Complete set of defense autotransformers 330 kV on differential, controlled from distance and current principle (basic and dublicate)
- •Complete set of defense transformers 110 kV on differential, controlled from distance and current principle
- •Complete set of differential defense of tires 330 kV and 110 kV
- •Complete set of differential defense bus arrangement 330 kV and 110 kV
- •Complete set for adjusting and verification equipment of relay protection and special automatic
- •Verification of devices rp and sa
- •Nomenclature and amount supplied with the equipment of the systems electric defense and automation of substation 330 kV «Zhovtneva»
- •Tables of technical information for the system of relay protection and automation
- •Generals
- •Terminology
- •Technical information of complete set of basic differential-phase defence wl-330 kV
- •Technical data post high-frequency protection (for overhead lines of 330 kV and 110 kV)
- •Technical data sets main differential protection of 330 kV overhead (with signal transmission on fiber optic)
- •Technical data set up protection of 330 kV overhead (on the remote and current principle)
- •Technical data sets automatic control switch with 330 kV circuit breaker failure protection, ar
- •Technical data sets basic differential-phase protections of 110 kV
- •Technical data sets main differential protection of wl-110 kV
- •Technical data set up protection of 110 kV (on the remote and the current principle)
- •Technical Data Security Kit cs-110 kV, bcs- 110 kV bus coupler on the current printsipes the breaker failure protection
- •Technical data sets automatic control switch with 110 kV circuit breaker failure protection, ar, fld
- •Technical data sets of differential busbar protection / busbar 330 kV
- •Technical data sets of differential busbar protection / busbar 110 kV
- •Technical Data Security Kit autotransformers 330/110 kV differential, distance and current principle (main and backup set)
- •Technical Data Security Kit transformers 110/35 kV differential, distance and current principle
- •Technical data protection management set rpn transformers
- •Technical data kit
- •Technical Data Automation Kit elimination of asynchronous operation
- •Technical data set command rp and sa - Tx, Rx
- •Technical data sets and data relay protection and emergency teams on fcl
- •Requirements Crossover
- •Requirements for coupling filter (wl-110 kV)
- •Requirements for coupling filter (wl-330 kV)
- •Requirements for Radio-frequency cables
- •Technical data sets to test relay protection
- •Technical data test set to test hf devices
- •Technical Data laptop
- •Special IV. Special technical requirements to automated control system for technological process
- •General
- •Scope of Works
- •Project Structure
- •Contractor`s duties
- •Purpose and Objectives of acs tp ss
- •Purpose of acs tp of the Substation
- •Objectives of the acs tp of the Substation
- •Equipment operating modes monitorin
- •Automated substation equipment control
- •Warning and alarm system organization
- •Warning system
- •Alarm system:
- •Registration of emergencies
- •Prоviding current and archived data for operating personnel and other users
- •Data exchange with other levels of control hierarchy
- •System-wide functions
- •Description of the Automation Object
- •Implementation of acs tp basic functions
- •General requirement
- •Monitoring of the Substation Current Mode and the Key Diagram Status
- •Equipment Status Monitoring
- •Process parameters monitoring
- •Control Process Automation
- •Automated Management Services
- •Control of the Substation Components
- •Control of 330 – 110 kV Switching Units
- •Control of 35 – 10 kV Switching Units
- •Software and hardware of acs tp
- •General requirements
- •Requirements to the substation level devices
- •Requirements to the connection and process level devices
- •Intelligent Electronic Devices (ied)
- •Requirements to lan
- •Requirements to electromagnetic compatibility of shs acs tp
- •Requirement to reliability of the acs tp software/hardware
- •Requirement to Safety
- •Ensuring of equipment operating conditions
- •Requirement to control and optical cables
- •Testing and self-diagnostics of the shs components
- •Requirements for the maintenance and repair
- •Arrangement of power supply
- •Requirement for Embodiment of Control Cabinet
- •Data exchanges with higher levels of dispatcher control
- •Interaction with adjacent subsystems
- •General Requirements
- •Interaction with aspfm
- •Interaction with relay protection an emergency controls
- •Interaction with substation main equipment monitoring subsystem
- •Interaction with the security video surveillance subsystem
- •Requirement to cyber security
- •Requirements to ergonomics and industrial design
- •Requirement to patent clearance
- •Requirements to standardisation and unification
- •Requirement to the Types of Support
- •Requirements to mathematical support
- •Requirements to information support
- •Requirement to linguistic support
- •Requirements to software
- •Requirements to measurement assurance/metrological support
- •Requirements to spare parts and accessories
- •Requirement to Documentation
- •Technical documentation
- •Project documentation
- •Operational documentation
- •Requirement for acceptance tests
- •General
- •Guarantees
- •Technical data table for the acs tp
- •General
- •Functional requirement Table 1.1: Technical requirements to acs tp hardware and software
- •Section V. Special specifications for automated metering system
- •Setting and purpose of creation the system
- •Purpose acsee ss
- •The purpose of the acsee ss
- •Description of object of automation
- •System requirements
- •General system requirements
- •Requirements for the structure and functioning of the system
- •Reliability requirements
- •Requirements for Safety
- •Requirements to ergonomics and technical aesthetics
- •Requirements for the operation, maintenance, repair and preservation of the system components
- •Requirements for the protection of information from unauthorized access
- •Requirements for the preservation of information in case of emergencies
- •Requirements for protection from the influence of external factors
- •Requirements for the standardization and unification
- •Power Requirements
- •Feature Requirements acsee ss
- •Functions and settings tasks acsee ss
- •Requirements for the type of collateral
- •Requirements of a software
- •Requirements for data provision
- •Requirements for linguistic support
- •Software Requirements
- •Hardware requirements
- •Requirements for the counters of electric power
- •The requirements for communication cabinet acsee ss
- •The requirements for awp
- •The requirements for communication channels
- •Requirements for metrological support
- •Requirements for Organizational Support
- •Requirements to acsse
- •Regulations
- •Technical data table for acsee
- •The range and number
- •Table 2.1: Information regarding the number and amount of equipment required for electricity metering points ss
- •Table 2.2: Data on the nomenclature and the amount of the required hardware and software acsee
- •Table 2.3: Composition Software
- •Technical data table
- •Table 5.1 Technical requirements for electronic multifunction electricity meter
Insulation and corrosion-protection works
During performance of insulation and corrosion-protection works using inflammable materials, harmful substance-emitting materials, the Contractor shall ensure protection of employees against influence of harmful substances and against thermal and chemical injury.
When performing corrosion-preventing works, it is necessary to follow the requirements of DSTUBA.3.2-10:2009. «Anticorrosion works. Safety requirements» and DSTU B V.2.6-145:2010. «Protection of concrete and reinforced concrete structures against corrosion».
Painting
When performing painting works, it is necessary to follow the requirements of DSTU B А.3.2-7:2009 SSBT. Painting works. Safety requirements.
Roofing and waterproofing
When performing works, it is necessary to follow the requirements of DSTUBА.3.2-11:2009 «Work roofing and waterproofing. Safety requirements "
Operational acceptance of the completed facility
The procedure and conditions of acceptance of the completed facilities into operation are specified by the "Procedure of acceptance of the completed facilities into operation", approved by the Cabinet of Ministers of Ukraine, Resolution No. 461 dated 13.04.2011, "Aspects of acceptance of the completed facilities into operation", or in accordance with current Ukrainian regulations and legal documents,valid as of the date of the facility's commissioning.
Upon receiving from the Contractor of written notification about completion at site of all the civil, erection and commissioning works the Employer or its authorized representative sets up the committee for drawing up and signing the Certificate of readiness of Facilities to operation that includes representatives of Employer, Contractor, designer, operational service and trade union.
The Contractor is obliged to prepare and submit to the Committee Certificates and all required documents in accordance with requirements of valid norms and rules of operational acceptance of facilities backbone power networks after construction or rehabilitation, including:
list of utilities (subcontractors) participating in the performance of building and erection works with indication of types of works performed by them and names of engineers and technicians directly responsible for performance of these works;
set of production drawings (as-built documentation) for the construction of the equipment presented for acceptance;
certificates, technical passports or other documents, certifying quality of materials, structure sand components used in construction and erection works;
covered-up works survey certificates and acts of intermediate inspection of separate responsiveconstructions (bearing metal and reinforced concrete constructions);
acts of individual testing and installed equipment tests;
reports of testing of communication devices, installations of radio, signalization and automationat their transposition;
reports on actions performed when building at the site with subsidence grounds, high groundwater level, underground openings, karsts;
act of test of devices providing explosion safety, fire safety and lightning protection;
registers of works execution and field supervision.
At the completed site, all works shall be performed as provided by working documentation and state standards, building regulations, equipment to be assembled and tested, safe conditions of industrial safety, fire and anthropogenic safety, ecological protection and sanitary standard shall be arranged.
Defects and faults detected during construction shall be removed prior to the complex testing.
Complex testing shall be performed by the Employer with Contractor's personnel involvement, after completion of all construction and installation works.
Facility complex testing beginning is the moment of its energization.
Prior to signing of certificate of readiness of Facilities to operation the committee shall:
verify the correspondence of the performed construction and installation works to the working;
documentation, to standards, construction norms and work performance rules;
verify the quality of the erected construction and installation works and evaluate them.
Based on results of equipment complex testing relevant records and certificate of readiness of Facilities to operation shall be prepared.
In the case of operational acceptance of the facility in I or IV quarter the terms of execution of certain types of works on land improvement and facade finishing may be postponed, but based on adverse weather conditions only. List of such works and terms of its execution are defined by Employer an dare recorded in the certificate and Declaration of readiness of Facilities for operation.
In case of disclosure of any defects or faults, the Committee makes a list of them and indicates terms of defects elimination, agreed with Contractor. List of defects shall be an essential annex to Certificate and shall be signed by Head of Committee and Contractor. In that case Employer should not sign and submit for registration Declaration of facility readiness for operation; and repeated address to the Employer by Contractor about facility readiness is acceptable only after eliminating of all comments and written notification of Employer about it.
On the grounds of approved certificate of readiness of the completed facilities for operation Employer or its authorized representative signs the Declaration of readiness of the completed facilities for operation and submit it for registration to the relevant State Architecture and Construction Inspectorate at the facility's location.
For registration of Declaration Employer or its authorized representative submits to Inspectorate two completed copies of Declaration. After the registration one copy is returned to Employer and the second one remains in the Inspectorate.
The Inspectorate checks the completeness of data indicated in Declaration and register it.
In the case the Declaration does not meet the requirements the Inspectorate returns it for improvement with explanation of reasons for return.
After the removing of reasons for return of Declaration for improvement the Employer may once more address the Inspectorate for Declaration registration.
The date of commissioning of the completed facility is the date of Declaration registration.
Annex №1
List of the main legal and other guidance documents, which should be guided by the Contractor in the implementation of the Project:
Law of Ukraine "On environment protection" No. 1264-XII dated 25.06.1991.
Law of Ukraine "On metrology and metrological activity".
Decree of the Cabinet of Ministers of Ukraine "On order of acceptance into operation of completed facilities" No. 534 dated 20.05.2009.
GKD 34.20.302-2002. "Electrical equipment testing norms".
NAPB 05.028-2004. "Fire protection system of power facilities, individual sites and power units"
GKD 34.20.507-2003 "Technical maintenance of electric power plants and grids. Rules”.
GKD 341.004.001 -94 "Standards of technological design of a.c. power plants with highest voltage level of 6-750 kV В".
GKD 343.000.004.003.001 -2001. "Fire safety instructions».
NAPB А.01.001 -2004. "Fire safety rules in Ukraine”.
NAPB В.01.034-2005/111 "Fire safety rules in companies and organisations of power sector of Ukraine’.
NAPB 05.032-2002 "Instruction on designing of fire protection system of switchgears, substations and transformers"
NAPB 05.28-2004. "Fire protection system of power facilities, individual sites and power units. Instruction on designing and operation".
NAPB 06.015-2006. "List of premises and buildings of power facilities, with definition of category and classification of fire-explosion hazard zones and fire hazard zones".
DNAOP 1.1.10-1.01 -2000 "Rules of safe operation of electrical installations".
DNAOP 0.00-1.21 -98 "Rules of safe operation of consumer's electrical installations".
SOU-N ЕЕ 20.302:2007 "Testing regulations of equipment".
SOU 45.21.3-00100227-22:2010 "Procedure of commissioning of facilities of backbone electrical grids upon their reconstruction, re-equipment and modernisation".
GOST 9.307-89. "Hot zinc coatings. General requirements and test methods".
GOST 12.1.005-88 "General sanitary and hygienic requirements to air in working area".
GOST 12.1.004-91 revision1 "SSBT. Fire safety. General requirements".
DSTU 7237:2011 System safety standards. electrical safety. General requirements and nomenclature of species protection
GOST 12.2.007.0-75 revision 1, 2, 3, 4 "SSBT. Electrotechnical devices. General safety requirements".
GOST 12.2.007.3-75 revision 1, 2, 3, 4 "SSBT. Electrotechnical devices of voltage above 1000 V. Safety requirements".
GOST 12.3.003-86. "Labour safety standards system (SSBT). Electric welding works. Safety requirements".
GOST 12.3.009-76. "Labour safety standards system (SSBT). Load-lifting works. General safety requirements".
GOST 12.3.016-87 "Anticorrosion works. Safety requirements".
GOST 12.3.032-84 revision 1 "SSBT. Wiring works. General safety requirements".
DSTU BА.3.2-7:2009 SSBT. Painting works. Safety requirementsи
GOST 12.3.040-85 "Construction. Roofing and hydro-insulation works. Safety requirements"
GOST 12.4.009-83. "Labour safety standards system (SSBT). Fire-fighting machinery for protection of sites. Main types. Location and maintenance".
GOST 12.4.154-85 "SSBT. Shielded devices for protection from electrical fields of industry frequency. General technical requirements, basic parameters and dimensions"
GOST 20.39.312-85 "Complex system of general technical requirements. Electrical products. Reliability requirements".
GOST 21.204-93 "Conventional signs and images of elements of general layout plans and transportation systems".
GOST 21.508-93. "Rules of issuing of working documents of general layout plans of enterprises, structures, residential and civil sites".
GOST 21.602-79 System of design documents for construction "Heating, ventilation and air conditioning".
GOST 27.003-90 "Reliability of machinery. Contents and ge neral rules of setting of reliability requirements".
GOST 103-76 "Hot-rolled steel strip. Assortment"..
GOST 687-78 revision 1, 2 "AC circuit-breakers for voltages exceeding 1000 V. General technical conditions".
GOST 689-90 revision 1 "AC disconnectors and earthing switches for voltages exceeding 1000 V. General technical conditions".
GOST 839-80 revision 1, 2 "Uninsulated wires for aerial power line. Technical conditions".
GOST 1508-78 revision 1, 2, 3, 4, 5 "Control cables with rubber and plastic insulation".
GOST 1516.2-97 "AC electrical equipment and installations for voltage level of 3 kV and above. General testing methods of electrical durability of insulation"..
GOST 1516.3-96 "AC Electrical equipment on voltage level from 1 to 750 kV. Electric strength of insulation requirements".
GOST 2590-88 "Round steel bars. Assortment".
GOST 2874-84 "Potable water".
GOST 5781 -82. "Hot-rolled steel for reinforcement of ferroconcrete structures".
GOST 5915-70 "Hexagon nuts, product grade B. Construction and dimensions"..
GOST 6323-79 "Wires with PVC-insulation for electrical equipment. Technical conditions".
GOST 6402-70 "Spring washers. Technical conditions".
GOST 6727-80 "Cold-drawn low-carbon steel wire for reinforced concrete".
GOST 7473-2010 "Ready-mixed concrete. Technical conditions".
GOST 7798-70 "Hexagon bolts, product grade B. Construction and dimensions".
GOST 8024-90 "Alternating current apparatus and devices for voltages above 1000 V. Temperature rise at continuous duty. Norms and test methods"..
GOST 8239-89 "Hot-rolled steel flange beams".
GOST 8240-97 "Hot-rolled steel channels".
GOST 8509-93 "Hot-rolled steel equal-leg angles".
GOST 8510-86 "Hot-rolled steel unequal-leg angles".
GOST 8865-93 "Electrical insulation systems. Evaluation of heat resistance and classification"
GOST 9850-72 "Zinc-coated steel wire for conductor cores. Technical conditions"..
GOST 9920-89 "AC electrical installations for voltage from 3 to 750 kV. Creepage distance of external insulation".
GOST 10434-82 revision 1, 2, 3 "Contact electrical joints. Classification. General technical requirements".
GOST 10704-76 "Longitudinal electrically-welded steel pipes".
GOST 10985-80 revision 1 "Metallic cabinets, boards, boxes. Shells, racks. Basic dimensions".
GOST 11371 -78 "Washers. Technical conditions"..
GOST 12177-79 "Cables, conductors and wires. Methods of structure testing".
GOST 12969-67 revision 1, 2 "Nameplates for devices and machinery. Technical requirements".
GOST 12971 -67 revision 1, 2 "Rectangular nameplates for machinery and devices. Dimensions".
GOST 13276-79 revision 1, 2, 3, 4, 5 "Line fittings. General technical conditions".
GOST 14192-96 "Marking of cargo".
GOST 14254-96 "Protection class, provided by housings (IP rating)".
GOST 14693-90 "Complete non-sealed switchgears, in metallic casing, voltage up to 10 kV. General technical conditions".
GOST 15150-69 revision 1, 2, 3, 4 "Machinery, instruments and other technical products. Versions for various climatic zones. Categories, operating conditions, storage conditions and transportation conditions regarding impact of environmental climatic factors".
GOST 15543.1 -89 "Electrical products. General requirements regarding resistance to climatic impacts".
GOST 16357-83 "Valve-type DC surge suppressors, for rated voltage 3.8 to 600 kV. General technical conditions".
GOST 16442-80 revision 1, 2, 3, 4, 5 "Power cables with plastic insulation. Technical conditions".
GOST 17516-72 revision 1, 2 "Electrical products. General requirements to environmental mechanical stability".
GOST 17613-80 "Line fittings. Terms and definitions".
GOST 18410-73 "Paper insulated power cables. Technical conditions".
GOST 18620-86 revision 1 "Electrical products. Marking".
GOST 18690-82 revision 1, 2, 3 "Cables, conductors, ropes and cable fittings. Marking, packing, transportation and storage".
GOST 19132-86 "Terminal contact blocks. General technical requirements"
GOST 19797-85 "Ceramic insulators for towers, for voltage over 1000 V, for indoor operation. Types, basic parameters and dimensions".
GOST 19903-74 "Hot-rolled sheet steel".Definition
GOST 21130-75 revision 1, 2, 3, 4, 5 "Electrical products. Earth terminals and earth signs. Design and dimensions".
GOST 21242-75 revision 1, 2, 3 "Flat or pin contact terminals of electrical equipment. Basic dimensions".
GOST 30515-2013 «Cements. General specifications»
GOST 23216-78 revision 1, 2, 3 "Electrical products. Storage, transportation, temporary corrosion protection and packing. General requirements and test methods".
GOST R 52085-2003 «Timbering. General specifications»
GOST R 52086-2003 «Timbering. Termsand Definition».
GOST 23478-79. "Timbering for monolithic concrete and reinforced concrete structures erection. Classification and general technical requirements".
GOST 24183-80 revision 1, 2, 3, 4 "Power cables for fixed installation. General technical conditions".
GOST 24259-80. Installation accessories for temporary fastening and a lignment of building structures. Classification and general technical requirements.
GOST 25372-82 "Electric energy meters. Conventional signs"
GOST 26020-83 "Steel double T-beams with parallel self edges"
GOST 26411 -85 "Control cables. General technical conditions".
GOST 27751 -88 "Reliability of building structures and bases".
GOST 27772-88 "Rolled stock for steel building structures".
GOST 29322-92 "Standard voltages".
GOST 30206-94 (МЭК 687-92) "Static W-h counters for AC active energy (accuracy class 0.2S and 0.5S)".
GOST 30586-98 "EMC of technical equipment. Lightning surge withstand. Protection methods".
GOST 52725-2007 "Non-linear overvoltage suppressors for AC installations, 3 to 750 kV".
DSTU 2977-95 "Industrial radio interferences. Terms and definitions".
DSTU 3413-96 revision 1, 2, 3, 4 "UkrSEPRO certification system. Products certification procedure".
DSTU 3857-99 "Line fittings. Terms and definitions".
DSTU IEC 60227-1:2002 "PVC-insulated cables, for rated voltage 450 to 750 V inclusive. (part 1. General requirements)".
DSTU IEC 61268-2001 "Static counters for AC reactive energy (accuracy class 2 and 3)"
DSTU БА.2.4-4:2009. "Basic requirements to design and working documents".
DSTU БА.2.4-5-95 (GOST 21.001 -93). "System of design documents for construction. General provisions".
DSTU БВ.2.7-30-95 "Building materials. Non-metalliferous materials for macadam and gravel beds and coatings of automobile roads. Technical conditions".
DSTU БВ.2.7-46-96. "Building materials. General-purpose construction cements. Technical conditions".
DSTU IEC 60044-1:2008 "Instrument transformers. Part 1. Current transformers".
DSTU IEC 60044-2:2008 "Instrument transformers. Part 2. Inductive voltage transformers".
DSTU ISO 9000:2007 Quality control systems. General provisions and glossary.
DSTU 2203-93 (GOST 6490-93) "Suspension line disc-type insulators. General technical conditions".
DSTU 2651 -94 (GOST 380-94) "Ordinary quality carbon steel".
DSTU 3347-96 (GOST 8608-96) "Tower porcelain insulators, post-type, for voltage over 1000 V. General technical conditions".
DSTU 3760-98 "Reinforcing bars for RC structures".
DBN А.2.2-3-2004. "Contents, procedure of development, endorsement and approval of design documents for construction".
DBN А.3.1 -5-96 revision 1 "Management, organisation and technology. Organisation of construction production".
DBN А.2.1 -1-2008 "Engineering survey for construction".
NAPB 05.028-2004. "Fire protection system of power facilities, individual sites and power units"
DBN А.2.2-1-95 "Design. Contents of documents on evaluation of environmental impact during design and construction of enterprises, houses and structures. General provisions for design".
DBN В1.1 -5-2000 "Buildings and structures in treated areas and sagging soils".
DBN В.1.1 -12:2006 "Construction in seismic areas of Ukraine".
DBN В.1.1.-7-2002. "Fire protection. Fire safety of construction sites".
DBN В.1.2-2:2006. "Reliability and safety system of construction sites. Loads and impacts. Design codes".
DBN В.2.3-4:2007. "Transportation structures. Automobile roads. Part і. Design. Part ІІ. Construction."
DBN В.2.6-31: 2006 "Thermal insulation of buildings".
DBN В.1.1 -12:2006 "Construction in seismic areas".
DBN В.1.2-2:2006 "Load and impacts".
DBN G.1 -4-95. "Rules of transportation, warehousing and s afekeeping of materials, products, structures and equipment in construction".
SNiP 3.02.01 -87 revision 1 "Earthworks, bases and foundations".
DSTU -NBV.1.1-27-2010. Construction climatology.
DBN В.2.6-98:2009 Concrete and reinforced concrete structures. Main provisions.
DSTU B V.2.6-145:2010. Protection of concrete and reinforced concrete structures against corrosion.
DBNВ.2.5-64:2012. Domestic water supply and sewerage.
DBN В.2.5-74:2013 Water supply. Main provisions design.
SNiP 2.04.05-91 "Heating, ventilation and air conditioning".
SNiP 3.03. 01 -87 "Bearing and fencing structures".
DSTU -NBА.3.1-23:2013 Guidance on the work on installation of insulation, finishing, protective coating walls, floors and roofs of buildings and structures (SNiP 3.04.01-87, MOD).
SNiP 3.05.05-84. "Engineering equipment and engineering pipelines".
SNiP 3.05.06-85. Electrotechnical devices.
SNiP II-89-80 "General layout plans of industrial enterprises".
DBN А.3.2-2-2009 "SSBT. Industrial safety in construction. General provisions"
"Guidelines on design of grounding devices of power stations and substations, 3-750 kV AC". Ministry of energy and electrification, 1987.
No. 2768-III dated 25.10.2001. Land Code of Ukraine.
No. 45/95-ВР dated 02.09.1995. Law of Ukraine "On ecological expertise".
No. 858-IV dated 22.05.2003. Law of Ukraine "On land management".
No. 1264-XII dated 25.06.1991. Law of Ukraine "On environment protection".
Decree of the Cabinet of Ministers of Ukraine dated 17.11.1997, No. 1279 "On amounts and Procedure of identification of losses of agricultural and forest production, to be compensated" and "Procedure of identification of losses of agricultural and forest production, to be compensated".
Decree of the Cabinet of Ministers dated 11.04.2001, No. 483 "On procedure of approval of investment programs and construction projects, and their complex state expertise".
No. 1378 dated 11.12.2003. Law of Ukraine "On evaluation of land".
No. 554 dated 27.07.1995. Decree of the Cabinet of Ministers of Ukraine "On the list of types of activities and sites representing high environmental danger".
No. 461 dated 13.04.2011. Decree of the Cabinet of Ministers of Ukraine "On commissioning of completed facilities".
State sanitary norms and rules of protection of people against electromagnetic radiation, order of the Ministry of Health Protection of Ukraine No. 239 dated 1.08.1996.
Convention on Access to Information, Public Participation in Decision-making and Access to Justice in Environmental Matters (Aarhus Convention), 1999.
Operating manual for SF6 switchgears (GND 34.47.503-2004).
SOU 40.1 -32385941 -38:2011 "General technical requirements to design and operation of rigid bus arrangement 110-750 kV"СОУ 40.1-32385941-38:2011 “Загальні технічні вимоги до проектування та експлуатації жорсткої ошиновки 110-750кВ”.
Technical requirements for the construction of "integrated security system of technological facilities of NEC Ukrenergo" of 17.04.2012.
Alternative standards of IEC for main high-voltage equipment, which have recommending nature in Ukraine:
IEC 62271 -100:2001 "High-voltage switchgear and control gear. Part 100: High voltage alternating-current circuit-breakers";
IEC 606694:1996 «Common specification for high-voltage switchgear and controlgear standards»;
IEC 60044-1:2003 «Instrument transformers – Part 1: Current transformers»;
IEC 60044-2:2003 «Instrument transformers – Part 2: Inductive voltage transformers»;
IEC 62271-102:2001 «High-voltage switchgear and controlgear - Part 102: Alternating current disconnectors and earthing switches».
IEC 60099 «Surge arresters».
EN 50081–2 Electromagnetic compatibility – Generic emission standard – Industrial environment.
EN 60255–6 Electric relays – Measuring relays and protection equipment Safety.
IEC 60 947-1 Ed/ 4.0 b: 2004 Low-voltage switchgear and controlgear.