    1. Permits and licenses for works implementation

The Contractor shall have or receive (before the Contract's signing) the license of the Ministry of Regional Development and Construction of Ukraine (State Architecture and Construction Inspectorate)for performance of construction works according to the current legislation of Ukraine.

The license for performance of construction works shall cover at least the following types of works:

  • design works, including engineering surveys and design of outdoor engineering structures,networks and systems, including transformer substations with voltage of over 35 kV;

  • construction of bearing and guarding structures, buildings, and installation of engineering and transport communication networks;

  • erection of external and internal engineering communications networks, systems, devices and measuring instruments;

  • installation of technological (electrical) equipment;

  • precommissioning and commissioning;

  • general contract for civil works and designing.

To clarify the licensing requirements, the Contractor shall contact the State Enterprise

" State Architecture and Construction Inspectorate "http://www.dabi.gov.ua

The Contractor shall obtain the appropriate licenses (or certificates) to perform special works at the construction, installation and commissioning sites, as well as obtain the access rights to these sites.

Problems related to the Contractor's right of access to the power industry facilities shall be resolved with the assistance of the Employer.

Prior to commencement of the works, the Contractor shall contact the Employer to obtain the permission for the construction works implementation.

The Employer has all necessary permits and licenses for performance of electrical power transmission. The Employer will submit the operational and technical personnel for carrying out complex tests and commissioning.

    1. Temporary sites

The Contractor, at its own expense, shall fence these areas, provide drainage, necessary access roads, electricity and water supply. The Contractor shall also perform any other rigging works for it suse.

Prior to beginning of reconstruction works the Contractor shall receive an approvals and draw up the corresponding contracts.

The Contractor shall provide temporary sites with facilities and premises for workers, guards,main tenance personnel, as well as warehousing facilities.

The Contractor shall provide at the reconstruction site fully equipped temporary manager's office including the following: water supply, power supply, lighting, furniture, heating and conditioning,sanitary facilities, canteen with related equipment, first aid station, communication equipment (phone,fax, internet) and etc.

The Contractor bears all responsibility for protection and storage of all equipment, materials, tools and machinery at the site.

Prior to commencement of the works, the Contractor shall provide for Employer approval Plan for arrangement of temporary sites.

    1. Supply of construction site

Quantity of materials, structures and equipment at the construction site shall be sufficient to perform construction works in accordance with approved programs and schedules.

The Contractor shall provide all construction sites (areas) with medical kits to provide first aid in case of accidents.