
- •Содержание
- •The oil and gas industry
- •Lcm Oil & Gas
- •Methods of accounting
- •Leasing Agreement
- •Agenda 21
- •What causes oil pollution?
- •The History of Standard Oil
- •Rig Location
- •Hurricane Dean reaches Belize
- •Drillers
- •Tool pushers
- •Anthony Johnson
- •Faisal Riyad
- •Colin Freyer
- •Igor Borovsky
- •Local firm awarded contract to dismantle rigs
- •A summary of the drilling process
- •The drill string
- •Rotating Systems
- •Drilling fluid
- •Types of drilling fluid
- •Functions, property or ingredient?
- •Blow out on Ensco 51
- •Drilling Technologies
- •Viability assessment
- •The geology of petroleum traps
- •Angular unconformity traps
- •Identification of farm-in opportunities
- •Bright spots
- •Developments in seismic technology
- •Using a vibrator truck
- •Principles of seismology
- •Two Technician Mud Logging Service
- •Remote Service Mud Logging
- •Different types of wireline well log
- •Some Common Wireline Logs and their Uses
- •New Frontiers of Oil Production
- •Completion Systems
- •Oil and Gas Separators
- •Primary and secondary separation
- •Successful Well Stimulation in Orenburg, Russia
- •The GasGun
- •Frac Job or Fracture Stimulation
- •Improved Oil Recovery
- •Primary, secondary and tertiary recovery
- •Enhanced recovery methods
- •C02 gas injection
- •Natural drives
- •Westminster Dual Purpose Pipeline Security and Leak Detection System
- •Pipeline systems
- •Oil Spills in the United States between 1991 and 2004
- •Task 1. Read the following extract from the website of an assaying company called Intertek (www.Intertek-cb.Com). What services does the company provide?
- •Assaying services
- •Crude Oil Assays
- •Список рекомендуемой литературы
Anthony Johnson
I suppose the type of maintenance we do would be called 'corrective maintenance'. In other words, we're pretty casual about it and just take action when something breaks down. So far this has worked out OK. We're quite a small outfit and everybody works very closely with the equipment. You usually get a feeling when something is going wrong, and a quick check will show what needs mending or replacing. We certainly don't do anything systematic.
Faisal Riyad
We have a systematic procedure of preventive maintenance. This involves planned inspections of each item at specific times, and every two years we do a complete overhaul during a scheduled shutdown of the rig. We perform tests, measurements and adjustments; we replace or replenish lubricants and other fluids; and we replace worn parts so that faults can be corrected before they develop into major defects.
Colin Freyer
I’m a rope access technician. I work in a harness up to 70 metres about sea level. A lot of the maintenance work we do involves using ultrasonic equipment, which measures the thickness of metal. If metal is supporting a heavy load or transporting gas or liquid, after a while it will wear and tear, and it’s very important that it’s repaired if it becomes too thin. I guess it’s quite dangerous work, but I get a big thrill from it.
Igor Borovsky
It is important for us to keep our older platforms producing and in good working condition, so we constantly need to monitor and modify our equipment. In the past, we carried out surveys and assessed the work required by taking hand-read measurements and making two-dimensional drawings. Nowadays, we can do this with a hand-held scanner to record and visualize complex components within construction projects and working installations. Instead of climbing ladders and around dangerous pipe work with harnesses, a laser scanner allows the data to be collected remotely from a d stance of up to 50 metres.
Задание 2. Для каждого предложения выберите 3 из 5 слов. Два слова являются неверными:
Task 2. For each sentence, choose three of the five words to complete the sentence. Two of the words are not correct.
During shutdown, we _____ the equipment for defects.
check, control, inspect, monitor, supervise
We _____ many different tests and analyze the results using special software.
carry out, do, make, perform, take
Regular maintenance enables us to detect _____ in the equipment.
flaws, damage, defects, errors, mistakes
We _____ a lot of data to ensure the accuracy of the tests.
assess, collect, gather, measure, obtain
If we find a defect, we can _____ the part.
remove, replenish, repair, replace, restore
Taking preventive _____ saves a lot of money on expensive repairs.
action, activity, measures, maintenance, steps
Задание 3. Соедините определение с видом ремонта:
Task 3. Match the correct definition to each of these types of maintenance: breakdown maintenance, predictive maintenance, condition-based maintenance, corrective maintenance, preventive maintenance, reliability-centred maintenance, risk-based maintenance
Planned maintenance or servicing at regular intervals to avoid failures occurring in the future.
Maintenance carried out at the optimum time, based on forecasts of a machine's lifespan and failures that could happen during that time.
Maintenance carried out at the optimum time, based on analysis of events which have caused damage to this or other such machines in the past.
Maintenance carried out at the optimum time, based on an analysis of the current health of a machine and what could happen to it in the future.
Maintenance to determine, systematically and scientifically, what must be done to ensure that physical assets continue to function normally and as the users want them to.
Maintaining only when inspection shows that it is required.
Not maintaining at all, unless the machine has actually failed.
Задание 4. Прочитайте и выучите диалог наизусть:
Task 4. Read and learn this dialogue by heart:
A. How's it going with that pump?
B. Fine . We found the problem.
A. What was wrong with it?
B. The bearing was frozen.
A. Have you replaced it?
B. Not yet. But we've ordered a new one. It'll be here tomorrow. And we've replaced
the hose.
A. Why did you do that?
B. It was split.
A. Oh, OK. So when will it be ready?
B. We'll get the bearing tomorrow morning. We'll reinstall the pump tomorrow
afternoon.
Задание 5.Найдите и исправьте ошибки как в примере:
Task 5. Find and correct the mistakes as in the example:
Например:
The fire have
been put out. – has
Her latest book can found at many bookshops. – …
The house cleaned every Friday. – …
My favourite song sung by Elton John. – …
You will invited to our wedding. – …
The ironing haven’t been done. – …
The car were serviced a week ago. – …
Gifts is always given at Christmas. – …
Many new houses will built in my street next year. – …
This sweater knitted by my mother. – …
Практическое занятие 11
Rig Erection and Dismantling
Сооружение вышки и демонтаж
Задание 1. Прочитайте и переведите текст:
Task 1. Read and translate the text:
company компания
contract контракт
platform платформа
steel метал, металлический
heavy тяжёлый
to represent представлять
rig вышка
project проект
to include включать
pipeline трубопровод
dismantling демонтаж