Assembly works and time-tabling

Text: Assembly works and time-tabling

New words:

  1. balustrade [´bælqstreıd] балюстрада, перила

  2. bracing [´breısıN] крепление; связь жесткости

  3. bricklayer [´brıkleıq] каменщик

  4. carpenter [´ka:pıntq] плотник

  5. decorator [dekq´reıtq] отделочник

  6. erector [ı´rektq] монтажник

  7. excavating [ekskq´veıtıN] земляные работы

  8. foreman [´fO:mqn] прораб

  9. glazier [´gleızıq] стекольщик

  10. joiner [´GOInq] столяр

  11. plumber [´plAmq] слесарь-водопроводчик

  12. precede [prı´si:d] предшествовать

  13. sequence [´si:kwqns] последовательность

  14. ceiling void запотолочное пространство

  15. cladding fixer панелеукладчик

  16. cladding panel навесная панель

  17. heating contractor теплотехник

  18. roof decking настил, плиты покрытия

  19. roofing contractor кровельщик

  20. suspended ceiling подвесной потолок

  1. Read and translate the text.

Assembly works and time-tabling

The assembly of a prefabricated building has been divided into four sequences or stages.

Having completed the preparation of the site, the workmen begin the initial stage. This includes excavating the ground, constructing the concrete foundations, fixing the column base plates and erecting the steel columns. The workmen begin by excavating the ground. This precedes the construction of the concrete foundations because they require solid ground to support them. This is followed by the fixing of the column base plates. Finally the steel columns are erected.

Having completed phase 1, the workmen begin phase 2. This includes fixing the beams and bracing, putting the concrete floors in place, erecting the upper floor steel columns and putting the roof decks in place. The workmen begin by fixing the beams and bracing. This precedes the placing of the concrete floors because they require beams to support them. This is followed by the erecting of the upper floor steel columns. Finally, the roof decking is put in place.

Having completed phase 2, the workmen begin phase 3. This includes erecting the corner units, fixing the horizontal cladding panels, fixing the vertical cladding panels, fixing the balustrade fixing plates and laying the weatherproof roof membrane. The workmen begin by erecting the corner units. This precedes the fixing of the horizontal cladding panels because they are fixed to the corner units. This is followed by the fixing of the vertical cladding panels. Finally, the balustrade fixing plates are fixed and the weatherproof roof membrane is laid.

Having completed phase 3, the workmen begin phase 4. This includes erecting the partitions, installing the services in the ceiling void, fixing the suspended ceilings, decorating the building and laying the floor finishes. The workmen begin by installing the services in the ceiling void. This precedes the erecting of the partitions because the workmen require access to the ceiling void. This is followed by the fixing of the suspended ceilings. Finally, the building is decorated and the floor finishes are laid.

Many trades are involved in the construction of a building. They cannot all work on the building at the same time because some jobs cannot start until others have been completed. Consequently, the time-tabling of jobs is extremely important if the building is to be completed on schedule. Usually the sequence of events in a building program are shown on a bar chart. This is a technique for determining the most efficient way in which events can be time-tabled.

Here is the example of such a bar chart.

Foreman

supervision

Labourer

to do manual work

Machine driver

to excavate

ground

Steel erector

to erecti

steel work

Bricklayer

to build

brickwork

Plumber

to install pipework and sanitary systems

Joiner

to manufacture doors, windows

Carpenters

to fix of floor joists, roof timbers, doors, windows, etc.

Roofing contractor

to lay roof covering

Cladding fixer

to fix

cladding

Heating contractor

to install heating equipment

Electrician

to install electrical equipment

Glazier

to put in glazing

Decorator

to decorate building

Week number

0

5

10

15

20

25

30

35

40

45

50

  1. Fill in the gaps with the appropriate words.

  1. The initial stage includes … of the ground.

a) prefabricating; b) excavation; c) necessitating.

  1. The construction of the concrete foundations is followed by the fixing of the … base plates.

a) steel; b) beam; c) column.

  1. Phase 2 starts with fixing the beams and … .

a) bracing; b) fixing; c) erecting.

  1. Phase 3 starts by the erecting of the … .

a) corner units; b) cladding panels; c) base plates.

  1. Fixing of the corner units precedes the fixing of the … .

a) roof membrane; b) cladding panels; c) balustrade plates.

  1. The workmen begin phase 4 by installing the services in the … .

a) ceiling void; b) suspended ceiling; c) floor finishes.

  1. The last step of the construction is … .

a) decorating; b) decoration; c) roof finishes.