- •International Society of Krishna Consciousness
- •Iskcon Mayapur, 2014
- •1. Introduction
- •2. The features of clean recycling
- •3. Current situation analysis 3.1 . Specification of a place for clean recycling
- •3.2 Current methods of waste’s utilizing: incineration and disposal.
- •3.3 Dioxin
- •3.4 Current situation in the world.
- •4. Clean recycling: stages of introduction.
- •Actions to perform to run the first stage.
- •5. Places of waste accumulation and collecting
- •5.1.At food places (restaurants, cafes, etc)
- •5.2.At outlets (stores, offices)
- •5.3. At public places (streets, squares)
- •5.4. Waste collection at residential areas
- •5.5.Course of action for cleaners
- •5.6.Purchasing and obtaining waste and raw-stuff
- •6.Transportation of waste.
- •6.1.The current situation (analysis)
- •6.2. Suggested waste collection ways in the residential areas and streets.
- •6.3. Planned collection ways at the area of Vedic Planetarium (isckon-Mayapur).
- •7.Waste sorting
- •7.1.Primary sorting (stage 1, table sketch)
- •7.2.Recycling complex’ building description
- •7.3. Waste in a recycling complex (a closer look inside)
- •7.4 Slide-ways chute (sketch and description)
- •7.5. Description of conveyor section of sorting complex (scheme)
- •8.Recycling
- •8.1. Recycling. First stage (description)
- •8.2. Organic waste recycling (plan of a basement floor, composting, worms, bio-solutions)
- •8.3.Distribution of equipment and tools in the building of recycle complex.
- •9. Agricultural Soil Recovery – a part of clean recycling phenomenon.
- •9.1. Guide to permaculture design.
- •9.2. Permaculture – is the part of clean recycling idea.
- •9.3. Schedule of daily planting
- •10. Conditions of placement and running of a recycling complex. Total costs.
- •10.1. Approximate project costs, description
- •10.2 Financing of green projects
- •11. Advantages of clean recycling
- •11.1. Environmental advantages:
- •11.2. Economical advantages:
- •11.3. Social advantages:
- •12. Necessary perspectives of clean recycling’s development
- •If it is economically successful, organize production of recycling equipment.
9.3. Schedule of daily planting
Pits and seeds of fruit trees and vegetables are to get planted daily into to pots and buckets. Seedlings must be protected by mosquito screens. It’s also very important to have cats to protect plants from rodents. Everyday watering, taking care and watching after seedlings is a must. Information must be updated in a journal daily. Daily planting starts after developing a scheduled plan of planting. All plants must be protected from animals and registered in database.
10. Conditions of placement and running of a recycling complex. Total costs.
Area of land (former rubbish dump): from 4000 m2 with a building of 6 floors (30 x 30 meters), total building area of 6300 m2 + loading/unloading zone (with access roads) of 3000 m2.
Water volumes: 6000 liters/daily for sanitary needs and equipment.
Daily waste arrivals: 550 tons, or 2700 m3 daily.
Staff: 117 people.
Total costs of equipment (including delivery, installation and customs affairs): 30 000 000 roubles approximately.
Total construction costs (building of recycling comlex, 6 floors) - 17 280 000 roubles.
Payback time: 4,5 years.
10.1. Approximate project costs, description
Basement floor
Let’s use bio-solution technology for example.
JAC loader vehicle, 832 000 roubles.
Compressors, 2 units 50 000 roubles, 6 kW.
Scales for weighing , 10 000 roubles.
Large containers, 3 units, 15 000 roubles.
Containers of 3m3 capacity, 78 units, 780 000 roubles
“Karcher” washers , 2 units 50 000 roubles, 3 kW
Pipes, hosepipes, liter counters, 50 000 roubles.
Bio-solution (It’s better to make it by yourselves locally in a complex), purchasing: 200 roubles/liter = 200 000 roubles.
First floor
360 pallets – 50 000 roubles.
Second floor
Machine for the production of napkins: 500 000 roubles, 3.5 kW.
Waste paper to toilet paper recycling machinery: 1 800 000 roubles, 60 kW.
Machinery for bone meal (bone flour) production: 1 630 000 roubles, 73 kW.
Third floor.
Tetra-pak recycling equipment 7 100 000 roubles, 160 kW.
Rubber tiles production equipment 650 000 roubles, 10 kW.
Polymer recycling machinery: 2 550 000 roubles, 36.5 kW.
Fourth floor.
Technological complex for regeneration of secondary polygon polymers: 3 300 000 roubles, 90 kW.
Textile recycling machinery, 580 000 roubles, 22 kW, 1 person
Conveyor, 2 units, 2 320 000 roubles,11 kW. 32 people. Or use sorting tables.
АМD-45 press, 2 units, 700 000 roubles, 15 kW.
АМD-12 press, 2 units, 260 000 roubles, 11 kW.
Extruders, 2 units, 600 000 roubles, 50 kW.
Lighting system, 100 000 roubles, 100 kW.
Fifth floor.
Auto-weighing system: 500 000 roubles, 5 kW.
Instruments & tools: 100 000 roubles, 15 kW.
Equipment: 100 000 roubles, 20 kW.
Recycling complex area.
Water well: 70 000 roubles.
Total costs: 25 032 000 roubles.