Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
3 ОР методичні вказівки.doc
Скачиваний:
0
Добавлен:
01.07.2025
Размер:
575.49 Кб
Скачать

Southerntrans-european motorway western border – kyiv on the section vinnytsa – kyiv

(International transport corridor №3)

Ex. 1 Read the text and translate into Ukrainian. / Прочитайте текст та перекладіть на українську мову:

The motorway Vinnytsia – Kyiv, with a length of 146 km, covers the territories of Vinnytsia, Zhytomyr and Kyiv regions, shortening the distance between Kyiv and Vinnytsia by 40-50 km.

Taking into account various positive factors when travelling by the road (traffic speed and safety, travelling time, condition of surface, services, etc.) the designed traffic flow is shared between the existing one and the new road in a ratio 39: 70% for the first years of exploitation

The maximum designed traffic intensity, as forecasted for 2015, is 23 tsd. vehicles/day. The fare for using the whole road section will be: for trucks - EUR 6.23, for cars-EUR 19.5 and for buses - EUR 31.3.

The estimated cost of construction has been identified in amount of EUR 466 tsd. The implementation phase of the project is expected to be 6 years with the use of local materials and labour and imported technologies, machinery and equipment. The pay-back period of the project is 28 years. The net present value (NPV) at a discount rate of 10%-and bank credit interest of 17% is EUR 29.2 tsd., the internal rate of return (1RR) is 16%.

In the first years of developing the motorway, the expected scope of services will be at a relatively low level, providing for the toll collection and other services to road users at a distance of 146 km. In the course of development of the network and attracting additional traffic flows the revenues will increase. Apart from solving the transport problems, the road construction will create new jobs and make contributions to the State budget.

Background /history /overall programme, related or similar projects:

The first attempt to construct a toll road on concession basis in Ukraine is being taken on the road Lviv – Krakovets.

Environmental Impact Summary:

The whole motorway section does not cross natural reserves or animal migration routes, there are no monuments of architecture, culture or archaeology in the area of its influence. Assuming that the travelling distance of vehicles will be shortened by 40-50 km, a considerable decrease of contamination of the environment is expected.

- 45 -

Vocabulary

  • to shorten – скорочувати

  • taking into account various factors – приймаючи до уваги різні фактори

  • traffic flow – потік автомобілів

  • in a ratio – у співвідношенні

  • the estimated cost of construction – орієнтована вартість будівництва

  • the implementation phase of the project – період реалізації проекту

  • labour – робоча сила

  • in the course of development – із розвитком

  • network – мережа

  • to attract – залучати

  • state budget – держбюджет

  • attempt – спроба

Ex.2. Answer the following questions. / Дайте відповіді на питання:

  1. What is the length of the motorway Vinnytsia – Kyiv?

  2. What does the motorway Vinnytsia – Kyiv cover the territories?

  3. What are the positive factors travelling by the road?

  4. What is the maximum designed traffic intensity vehicles per day?

  5. Does the whole motorway section cross natural reserves or animal migration routes?

  6. Are there any monuments of architecture, culture or archaeology in the area of motorway?

Ex. 3. Ask as more questions as possible. / Задайте якомога більше питань до речення:

The new motorway is Vinnytsia Kyiv.

Ex.4. Using new vocabulary retell the text. / Використовуючи нову лексику перекажіть текст.

Самостійна робота 9

Ex. 1.Complete and translate into Ukrainian word-combinations in written

form. / Доповніть і перекладіть словосполучення на українську мову письмово:

The _________ Vinnytsia – Kyiv, the territories of Vinnytsia, ________ and Kyiv regions, positive factors, speed and _________, the maximum ________ traffic intensity, use of local materials and _________, in the first ________ of developing the motorway, _________ additional traffic flows, the motorway section _______ _______ natural reserves or animal _______ routes, monuments of architecture, culture or _________.

- 46 -

Ex.2. Translate into English. / Перекладіть на англійську мову:

1.Автомобільна дорога Вінниця – Київ пролягає по території таких областей як Вінницька, Житомирська та Київська. 2. Ця дорога скорочує відстань між Києвом та Вінницею на 60-70 км. 3. Позитивними факторами при русі автомобільною дорогою Вінниця – Київ є час поїздки, стан покриття та обслуговування. 4. Максимальна інтенсивність руху – 25 тисяч автомобілів за добу. 5. Завдяки будівництву нової дороги створюються нові робочі міст, поповнюється держбюджет додатковими грошовими надходженнями. 6. Ділянка автомагістралі не перетинає об’єкти природно-заповітного фонду та шляхи міграції тварин.

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]