Хорошев / ИЛП_материал_маг_02.15 / Спецификация AECMA Specification 2000M / MIL-STD-1388-2B
.pdfMIL-STD-1388-2B
APPENDIX F
Appendix F
LIST OF LOGISTIC SUPPORT ANALYSIS RECORD ACRONYMS
10. PURPOSE. This appendix is to be used to reference and understand the acronyms and expressions used in MIL-STD-1388-2B.
20.ACRONYMS.
a |
|
Failure Mode Ratio |
|
|
|
|
||||||
|
|
Achieved |
Availability |
|
|
|
||||||
Aa |
|
Inherent |
Availability |
|
|
|
||||||
Ai |
|
Operational |
Availability |
|
|
|||||||
A o |
|
Allocated |
|
|
|
|
|
|
|
|
||
AAL |
|
Additional |
Authorization |
List |
||||||||
AC/DC |
Alternating |
Current/Direct |
Current |
|||||||||
ACT |
CD |
Activity |
Code |
|
|
|
|
|
|
|||
ADP |
|
Automated Data Processing |
|
|
||||||||
ADPE |
|
Automatic |
Data |
Processing |
Equipment |
|||||||
AELs |
|
Allowance |
Equipment Lists |
|
|
|||||||
AFM |
|
Air |
Force |
Manual |
|
|
|
|
|
|||
AFQT |
|
Armed |
Forces Qualifications |
Test |
||||||||
AFR |
|
Air Force Regulation |
|
|
|
|||||||
AIC |
|
Allowance |
Item |
Code |
|
|
|
|||||
|
|
Adaptor Interconnect |
Device |
|
||||||||
ALC |
|
Alternate Logistic Support Analysis Control Number Code |
||||||||||
ALDT |
|
Administrative and Logistics Delay Time |
||||||||||
AMC |
|
Acquisition |
Method |
Code |
|
|
||||||
AMSC |
|
Acquisition |
Method |
Suffix |
Code |
|||||||
AMSDL |
Acquisition Management Systems and Data Requirements Control |
|||||||||||
ANL |
M-H |
List |
|
|
|
|
|
|
|
|
|
|
Annual |
Man-Hours |
|
|
|
|
|
||||||
ANSI |
|
American |
National |
Standards |
Institute |
|||||||
AOR |
|
Annual |
Operating |
Requirements |
||||||||
APL |
|
Allowance |
Part |
List |
|
|
|
|||||
AR |
|
Army |
Regulations |
|
|
|
|
|
||||
ARNSE |
Additional |
Reference |
Number |
|
||||||||
Additional |
Reference |
Number |
Select |
|||||||||
ASO |
|
Aviation |
Supply |
Office |
|
|
||||||
ASVAB |
Armed Services Vocational Aptitude Battery |
|||||||||||
ATE |
|
Automatic |
Test |
Equipment |
|
|
||||||
AVIM |
|
Aviation |
Intermediate |
Maintenance |
||||||||
AVUM |
|
Aviation |
Unit |
Maintenance |
|
|
||||||
B |
|
Failure Effect |
Probability |
|
||||||||
BCD |
|
Binary |
Coded Decimal |
|
|
|
||||||
BDAR |
|
Battle Damage Assessment and Repair |
||||||||||
BDG |
|
Brigade |
|
|
|
|
|
|
|
|
||
BDSR |
|
Below |
Depot |
Scrap |
Rate |
|
|
|||||
BII |
|
Basis |
Of |
Issue |
Items |
|
|
|
||||
BIT |
|
Built-In-Test |
|
|
|
|
|
|
||||
BITE |
|
Built-In-Test-Equipment |
|
|
||||||||
BN |
|
Battalion |
|
|
|
|
|
|
|
|
||
BOI |
|
Basis |
Of |
Issue |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
- 563 - |
||
|
|
|
|
|
|
|
MIL-STD-1388-2B |
|
|
|
|
|
|
|
APPENDIX F |
C m |
Failure Mode Criticality Number |
||||||
C r |
Item |
Criticality |
Number |
||||
C |
Comparative |
Analysis |
|||||
CAD |
Condemnation At Depot |
||||||
CAGE |
Commercial and Government Entity |
||||||
CAL |
Calibration |
|
|
|
|||
CALS |
Computer-aided Acquisition and Logistic Support |
||||||
CBD |
Condemnation Below Depot |
||||||
CBIL |
Common and Bulk Item List |
||||||
CD |
Cleaning |
and |
Drying Procedures |
||||
CDRL |
Contract Data Requirement List |
||||||
CE |
Concept Exploration |
||||||
CFE |
Contractor Furnished Equipment |
||||||
CFI |
Card Format Indicator |
||||||
CFR |
Code |
of |
Federal Regulations |
||||
CIC |
Critical |
Item |
Code |
||||
CLS |
Contractor Logistic Support |
||||||
CMRS |
Calibrations Measurement Requirements Summary |
||||||
COEI |
Components of End Item |
||||||
CON FAC |
Conversion Factor |
|
|||||
CONUS |
Continental United States |
||||||
COSAL |
Coordinated Shipboard/Allowance List |
||||||
CPC |
Concurrent |
Production Code |
|||||
CR |
Contractor |
Recommended |
|||||
CSN |
Card Sequence Number |
||||||
CT |
Cushioning |
Thickness |
|||||
CTIC |
Contractor Technical Information Code |
||||||
CTP |
Coordinated Test Plan |
||||||
CTRL |
Control |
|
|
|
|
||
DAC |
Document Availability Code |
||||||
DCN |
Design |
Change |
Notices |
||||
DD |
Design |
Development |
|||||
DDCC |
Design Data Category Code |
||||||
DED |
Data Element Definitions |
||||||
DEST CD |
Destination |
Code |
|
||||
DIC |
Document |
Identifier Code |
|||||
DID |
Data Item Description |
||||||
DLSC |
Defense Logistics Service Center |
||||||
DMIL |
Demilitarization |
Code |
|||||
DOD |
Department |
of |
Defense |
||||
DOP |
Degree Of Protection |
||||||
DRP |
Designated Rework Point |
||||||
DS |
Direct |
Support |
|
||||
DSR |
Depot |
Scrap |
Rate |
|
|||
EBCDIC |
Extended Binary Coded Decimal Interchange Code |
||||||
EC |
Essentiality |
Code |
|
||||
E-CAGE/PN |
Equivalent Commercial and Government Entity and Part Number |
||||||
EFM-MTBF |
Engineering Failure Mode Mean Time Between Failure |
||||||
EI |
End |
Item |
|
|
|
|
|
EIAC |
End |
Item |
Acronym |
Code |
|||
ELIN |
Exhibit |
Line |
Item |
Number |
|||
ESML |
Expendable/Durable Supplies and Materials List |
||||||
ESS |
Early |
Supply |
Support |
||||
F |
Part |
Failure |
Rate |
|
|||
FAA |
Federal Aviation Administration |
||||||
|
|
|
|
|
|
|
- 564 - |
|
|
|
|
|
|
|
MIL-STD-1388-2B |
|||
|
|
|
|
|
|
|
|
APPENDIX F |
||
FDC |
Facility |
Drawing |
Classification |
|||||||
FGC |
Functional |
Group |
Code |
|
|
|||||
FEP |
Failure |
Effect |
Probability |
|||||||
FI |
Front |
Inside |
|
|
|
|
|
|
||
FIRU |
Fault |
Isolated |
Replaceable Unit |
|||||||
FLSIP |
Fleet Logistic Support Improvement Program |
|||||||||
FM |
Failure |
Mode |
|
|
|
|
|
|
||
FMEA |
Failure Modes and Effects Analysis |
|||||||||
FMECA |
Failure Modes, Effects, and Criticality Analysis |
|||||||||
FMI |
Failure |
Mode |
Indicator |
|
||||||
|
Failure |
Mode |
Ratio |
|
|
|
||||
FMT |
Failure |
Mode |
Task |
|
|
|
|
|||
FO |
Front |
Outside |
|
|
|
|
|
|
||
FR |
Failure |
Rate |
|
|
|
|
|
|
||
FSC |
Federal |
Supply |
Classification |
|||||||
FSD |
Full |
Scale Development |
|
|||||||
FY |
Fiscal Year |
|
|
|
|
|
|
|||
GFAE |
Government Furnished Aeronautical Equipment |
|||||||||
GFE |
Government |
Furnished |
Equipment |
|||||||
GIC |
Gabaret |
International |
|
De Chargement |
||||||
GR |
Government Required |
|
|
|
||||||
HC |
Hazardous |
Code |
|
|
|
|
|
|||
HCI |
Hardness Critical Item |
|
||||||||
HCP |
Hardness |
Critical |
Procedures |
|||||||
HMI |
Hazardous Material Indicator Code |
|||||||||
HMPC |
Hazardous Maintenance Procedures Code |
|||||||||
HQ |
Headquarters |
|
|
|
|
|
|
|||
IA |
Inherent |
Availability |
|
|
||||||
IAW |
In Accordance |
With |
|
|
|
|||||
IC |
Indenture |
Code |
|
|
|
|
|
|||
ICC |
Item |
Category |
Code |
|
|
|
||||
ICP |
Inventory |
Control |
Point |
|||||||
ICQ |
Intermediate |
Container |
Quantity |
|||||||
ICS |
Interim |
Contractor |
Support |
|||||||
ID |
Identification |
|
|
|
|
|
||||
ILS |
Integrated |
Logistic |
Support |
|||||||
IMAC |
Industrial Materials Analysis of Capacity |
|||||||||
IMC |
Item |
Management |
Code |
|
|
|||||
IMF |
Inherent |
Maintenance |
Factor |
|||||||
IND CD |
Indenture |
Code |
|
|
|
|
|
|||
I/O |
Input/Output |
|
|
|
|
|
|
|||
I/R |
Interchangeability/Replaceability |
|||||||||
IRCC |
Integrated Logistic Support Requirement Category Code |
|||||||||
ISIL |
Interim |
Support |
Item |
List |
||||||
ISL |
Integrated |
Stock |
List |
|
|
|||||
IS0 |
International |
Organization of Standards |
||||||||
ISS |
Initial |
Spares |
Support |
Listing |
||||||
JETDS |
Joint Electronics Type Designation System |
|||||||||
LCC |
Life |
Cycle |
Cost |
|
|
|
|
|
||
LCN |
Logistic Support Analysis Control Number |
|||||||||
LCN-IC |
Logistic Support Analysis Control Number - Indenture Code |
|||||||||
LDO |
Logistic |
Decision |
Office |
|||||||
LIN |
Line |
Item |
Number |
|
|
|
|
|||
LLTIL |
Long Lead Time Items List |
|||||||||
LORA |
Level |
of |
Repair |
Analysis |
||||||
|
|
|
|
|
|
|
|
|
|
- 565 - |
|
|
|
|
|
|
|
MIL-STD-1388-2B |
|||
|
|
|
|
|
|
|
|
APPENDIX F |
|
|
OBRP |
On Board |
Repair |
Part |
|
|
|||||
ODRC |
Output |
Data |
Research Code |
|
|
|||||
OJT |
On the Job Training |
|
|
|
||||||
O/M |
Operations |
and |
Maintenance |
|
|
|||||
O/M LVL |
Operations |
and |
Maintenance |
Level |
||||||
OP |
Operation |
|
Level |
|
|
|
|
|||
OPI |
Optional Procedures Indicator |
|
||||||||
ORR |
Overhaul |
Replacement Rate |
|
|
||||||
0SI |
Operating Space Item |
|
|
|||||||
OT |
Operating |
|
Time |
|
|
|
|
|||
OTP |
Operational Test Program |
|
|
|||||||
OW |
One - |
Way |
|
|
|
|
|
|
|
|
P |
Predicted |
|
|
|
|
|
|
|
||
PCB |
Printed |
Circuit |
Board |
|
|
|||||
PCCN |
Provisioning |
Contract Control Number |
||||||||
PCI |
Price |
Challenge |
Indicator |
|
|
|||||
PCL |
Post |
Conference |
List |
|
|
|||||
PCS |
Permanent |
|
Change of |
Station |
|
|
||||
PCT |
Percent |
|
|
|
|
|
|
|
|
|
PCTL |
Percentile |
|
|
|
|
|
|
|||
PF |
Productivity |
Factor |
|
|
|
|||||
PGC |
Parameter |
|
Grouping |
Code |
|
|
||||
PIC |
Priority |
Indicator |
Code |
|
|
|||||
PICA |
Prime Inventory Control Activity |
|||||||||
PII |
Procurement Instrument Identification |
|||||||||
PIIN |
Procurement Instrument Identification Number |
|||||||||
PL |
Provisioning |
List |
|
|
|
|||||
PLCC |
Provisioning |
List Category |
Code |
|
||||||
PLISN |
Provisioning List Item Sequence Number |
|||||||||
PLT |
Production |
Lead |
Time |
|
|
|||||
PMAC |
Preliminary Maintenance Allocation Chart |
|||||||||
PMCS |
Preventive Maintenance Checks and Services |
|||||||||
PMIC |
Precious |
Metal |
Indicator Code |
|
||||||
PMR |
Planned Maintenance |
Requirements |
||||||||
PMS |
Planned Maintenance System |
|
|
|||||||
PPL |
Provisioning |
Parts |
List |
|
|
|||||
PPLI |
Provisioning Parts List Index |
|
||||||||
PPSL |
Program Parts Selection List |
|
||||||||
PR/O |
Pilot |
|
Rework/Overhaul |
|
|
|||||
PSCN |
Permanent System Control Number |
|
||||||||
PSICP |
Program Support Inventory Control Point |
|||||||||
PS/PC |
Physical |
Security/Pilferage |
Code |
|||||||
PTD |
Provisioning Technical Documentation |
|||||||||
PTLD |
Physical Teardown Logistic Demonstration |
|||||||||
PUC |
Provisioning Unit of Measure/Issue Price Code |
|||||||||
QPA |
Quantity Per Assembly |
|
|
|||||||
QPEI |
Quantity Per End Item |
|
|
|||||||
QTY/ASSY |
Quantity Per Assembly |
|
|
|||||||
QTY-AUTH |
Quantity |
Authorized |
|
|
||||||
QTY/EI |
Quantity Per End Item |
|
|
|||||||
QUP |
Quantity Per Unit Pack |
|
|
|||||||
RAM |
Reliability, |
Availability, |
and |
Maintainability |
||||||
RAM IC |
Reliability, |
Availability, |
and |
Maintainability Indicator Code |
||||||
RCM |
Reliability Centered Maintenance |
|||||||||
RCT |
Repair |
Cycle |
Time |
|
|
|
||||
|
|
|
|
|
|
|
|
- 567 - |
|
|
|
|
|
MIL-STD-1388-2B |
|
|
|
APPENDIX F |
R&D |
Research and Development |
||
RDC |
Reference Designation Code |
||
RDOC |
Reference Designator Overflow Code |
||
REP |
Repair |
|
|
RI |
Rear Inside |
|
|
RIL |
Repairable Items List |
||
RIP |
Remain-In-Place Indicator |
||
RISS BUY |
Recommended Minimum System Stock Buy |
||
R&M |
Reliability |
and Maintainability |
|
RMSS LVL |
Recommended Minimum System Stock Level |
||
RNCC |
Reference Number Category Code |
||
RNVC |
Reference Number Variation Code |
||
RO |
Rear Outside |
||
RPF |
Rotatable Pool Factor |
||
RPSTL |
Repair Parts and Special Tools List |
||
RRR |
Rework Removal Rate |
||
RS/IND |
Replace or Supersede Provisioning List Item Sequence Number |
||
|
Indicator |
|
|
RSR |
Repair Survival Rate |
||
RSS |
Ready Service Spare |
||
RTD |
Replacement |
Task Distribution |
|
RTLL |
Recommended Tender Load List Quantity |
||
R/V |
Range/Value |
|
|
SAIP |
Spares Acquisition Integrated With Production |
||
SAR |
System Attrition Rate |
||
SC |
Support Concept |
||
SCI |
Supplemental Card Indicator |
||
SCPL |
System Configuration Provisioning List |
||
SE |
Support Equipment |
||
SEC |
Security Clearance |
||
SER |
Service Designator Code |
||
SERD |
Support Equipment Recommendation Data |
||
SEUUT |
Support Equipment Unit Under Test |
||
SFPPL |
Short Form Provisioning Part List |
||
SHSC |
Safety Hazard Severity Code |
||
SI |
Special Item Code |
||
SIASCN |
Standard Interservice Agency Serial Control Number |
||
SIC |
Suppression Indicator Code |
||
SL |
Shelf |
Life |
|
SL |
Skill |
Level |
|
SLAC |
Shelf |
Life |
Action Code |
SLC |
Skill |
Level |
Code |
SMCC |
Special Material Content Code |
||
SMIC |
Special Maintenance Item Code |
||
SMR |
Source, Maintenance, and Recoverability Code |
||
S/N |
System End Item Serial Number |
||
SNSL |
Stock Number Sequence List |
||
SOW |
Statement Of Work |
||
SPCC |
Ship Parts Control Center |
||
SPI |
Special Packaging Instruction |
||
SPIIN |
Supplemental Procurement Instrument Identification Number |
||
SPI REV |
Special Packaging Instruction Number Revision |
||
SRA |
Special Repair Activity |
||
SSC |
Skill Specialty Code |
||
SSE |
Skill Specialty Evaluation Code |
||
|
|
|
- 568 - |
