Добавил:
Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
Скачиваний:
0
Добавлен:
01.09.2026
Размер:
48 Мб
Скачать
Phase-0 upgrade (2013-2014)
• ATLAS: Insertable B-layer (IBL), Level-1 topological trigger, complete muon coverage, repairs (TRT, LAr and Tile)
Phase-1 upgrade (2018-2019)
• ATLAS: Fast Track Trigger (FTK), High granularity Level-1 calorimeter trigger, new small wheel for Level-1 muon trigger
Phase-2 upgrade (2023-2025)
• ATLAS: New silicon tracker & forward calorimeter & electronics, Level-1 track trigger
Physics requires to increase rate
Run1 data-taking rate 400 Hz Run2 data-taking rate 1kHz
М.Г. Коротков Москва, февраль 2023 41
LHC Computing Model Evolution. Tiers Hierarchy
Hierarchy
Mesh
Evolution of computing models
Network capabilities and data access technologies have significantly improved our ability to use resources independent of location Now we are relaxing hierarchical model : Flat instead of Tiered
М.Г. Коротков Москва, февраль 2023 42
Grid model
Суперкомпьютеры
Использование высокопроизводительных вычислительных мощностей для моделирования физических процессов и обработки экспериментальных данных.
М.Г. Коротков Москва, февраль 2023 43
HPC Scheduling. Cont’d
This is not a typical workday view of HPC machine
At this moment machine is 85% full, the largest open partition has 1024 nodes
But the shortest job in the queue required 4096 nodes
The scheduler will be happy to run a short job in R12
24h backfill tests have been
М.Г. Коротков Москва, февраль 2023 44
conducted on Titan together with OLCF team
Новый FCC pp – коллайдер: 80-100 км туннель в окрестностях Женевы
Схема возможного расположения коллайдера FCC в окрестностях Женевы. Хорошо видно кольцо действующего коллайдера LHC с длиной окружности 27 км.
М.Г. Коротков Москва, февраль 2023 45
Соседние файлы в папке ML - Коротков (2 сем, мага)