Full Threat Report |
5 |

443 Direct, Accts Pay 








Figure 14.6 Data
Direct, Accts Rec
(27.8%)
Direct, Applicatns
(27.7%) 4 Others (8.1%)
5 |
10 |
15 |
20 |
25 |
30 |
35 |
|
|
|
|
Dollars |
|
|
40 (x 10)
Integrity Loss - ALE's
Direct, Comms S/W (13.7%)
Disclosure, Personnel (22.7%)
Figure 15.6 |
Data Integrity Loss |
- |
ALE's |
|
|
|
|
|
|
|
|
|
|||
|
Direct, Accts Rec |
|
|
|
|
|
|
|
|
|
|
5,526 |
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
Direct, Applicatns |
|
|
|
|
|
|
|
|
|
|
5,507 |
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Disclosure, Personnel |
|
|
|
|
|
|
|
|
|
|
4,500 |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
Direct, Comms S/W |
|
|
|
|
|
|
|
|
|
|
2,723 |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
Direct, System S/W |
|
|
|
|
|
|
|
|
|
|
|
817 |
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
Direct, Databases |
|
|
|
|
|
|
|
|
|
|
|
640 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
Direct, Accts Pay |
|
|
|
|
|
|
|
|
|
|
|
147 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
5 |
10 |
15 |
20 |
25 |
30 |
35 |
40 |
45 |
50 |
55 (x 100) |
|
|
|
|
|
|
|
|
|
|
|
Dollars |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Figure 16.6 |
Data Integrity Loss |
- |
SLE's |
||||
3.2.7 |
Flooding/Water Damage |
- |
AFE: 0.01 |
|
|
|
|
|
|
|
|
|
|||
The various incident classes associated with this threat are shown in the following table:
Incident Class |
SLE |
ALE |
% of total ALE |
Direct Loss, Communications Hardware |
$10,001. |
$100. |
93.5% |
Direct Loss, Office Equipment |
$625. |
$6. |
5.8% |
Disclosure, Databases |
$250. |
$3. |
2.3% |
Figure 13.7

100 Direct, Comms H/W 











1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 (x 10) |
Full Threat Report |
6 |
Dollars
6
Direct, Off Equip
3
Disclosure, Databases
|
1 |
|
2 |
3 |
4 |
|
|
|
|
Dollars |
|
Figure 14.7 |
Flooding/Water Damage |
- |
ALE's |
|
|
5 |
6 |
Disclosure, Databases (2.8%)
Direct, Off Equip (5.5%)
Direct, Comms H/W (91.7%)
Figure 15.7 Flooding/Water Damage - ALE's

10,001 Direct, Comms H/W 










1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 (x 1,000) |
Dollars
Full Threat Report |
7 |
||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
625 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
Direct, Off Equip |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
250 |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
Disclosure, Databases |
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 10 15 20 25 30 35 40 |
45 50 55 60 (x 10) |
||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
Dollars |
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
Figure 16.7 |
Flooding/Water Damage - SLE's |
||||||||||
3.2.8Hardware Failure - AFE: 70.00
The various incident classes associated with this threat are shown in the following table:
Incident Class |
SLE |
ALE |
% of total ALE |
Direct Loss, Hardware |
$375,000. |
$26,250,000. |
100.0% |
Disclosure, Databases |
$0. |
$0. |
0.0% |
Figure 13.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
26,250,000 |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
Direct, Hardware |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
25 |
50 |
75 100 125 150 175 200 |
225 250 (x 100,000) |
||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Dollars |
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
Figure 14.8 |
Hardware Failure - ALE's |
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
375,000 |
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
Direct, Hardware |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
5 |
10 |
15 |
20 |
25 |
30 |
35 (x 10,000) |
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
Dollars |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
Figure 16.8 |
|
Hardware Failure - SLE's |
||||||
3.2.9Pirating Key Personnel - AFE: 1.00
The various incident classes associated with this threat are shown in the following table:
There are no incidents associated with this threat.
Safeguard vs Threat Report |
1 |
The section below looks at each safeguard and indicates, for each threat, the ALE before and after the safeguard is implemented. The overall ALE for a threat is the sum of the ALEs for each of the associated incidents. The percentage by which the ALE is reduced by the safeguard is also indicated.
The next section contains a table indicating, for each safeguard, the ALE before (Original ALE) and after the safeguard is implemented.
Safeguard: Physical Access Control |
|
|
|
|
|
|
|
|
|
|
|
Threat |
Original ALE |
|
ALE with Safeguard |
|
Percentage Drop |
|
|
||||
|
|
|
|
|
|
Data Destruction |
$5,055,028. |
$5,035,861. |
0.38% |
||
Data Disclosure |
$5,813. |
$4,915. |
15.45% |
||
Data Integrity Loss |
$59,584. |
$43,827. |
26.45% |
||
Safeguard: |
Application Controls |
|
|
|
|
|
|
|
|
Threat |
|
|
Original ALE |
|
ALE with Safeguard |
|
Percentage Drop |
||
Data Destruction |
$5,055,028. |
|
|
|
$4,549,525. |
10.00% |
|||
Safeguard: |
Classification Markings |
|
|
|
|
|
|
|
|
Threat |
|
Original ALE |
|
|
|
ALE with Safeguard |
|
Percentage Drop |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Data Disclosure |
$5,813. |
|
$3,459. |
40.50% |
|||||
Safeguard: |
Contract Specifications |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Threat |
|
|
Original |
|
|
ALE with Safeguard |
|
Percentage Drop |
|
|
|
|
ALE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Data Destruction |
$5,055,028. |
|
|
|
$2,527,514. |
50.00% |
|||
Data Disclosure |
$5,813. |
|
$2,861. |
50.78% |
|||||
DSatafeguard:IntegrityDataLossEncryption |
$59,584. |
|
|
|
$44,688. |
25.00% |
|||
Threat |
|
|
Original |
|
|
|
|
|
|
|
|
|
ALE |
|
|
|
|
||
Safeguard: |
Detection System |
|
|
|
|
|
|
|
|
Threat |
|
|
Original ALE |
|
|
ALE with Safeguard |
|
Percentage Drop |
|
Data Destruction |
$5,055,028. |
|
|
|
$5,047,361. |
0.15% |
|||
Data Disclosure |
$5,813. |
|
$5,372. |
7.59% |
|||||
Data Integrity Loss |
$59,584. |
|
|
|
$53,251. |
10.63% |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ALE with Safeguard |
|
Percentage Drop |
Safeguard: |
Life Cycle Management |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
||
Threat |
|
Original ALE |
|
ALE with Safeguard |
|
Percentage Drop |
|||
|
|
|
|
|
|
|
|
||
Data Integrity Loss |
$59,584. |
|
|
|
$59,238. |
0.58% |
|||
Data Disclosure |
$5,813. |
|
$5,740. |
1.26% |
|||||
Safeguard vs Threat Report |
|
|
|
|
|
|
|
|
2 |
|
|
|
|||
Safeguard: |
Personnel Clearances |
|
|
|
|
|
|
|
|
|
|
|
|
S |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
|
Threat |
|
|
Original ALE |
|
|
ALE with Safeguard |
Percentage Drop |
g |
|||||||
Data Destruction |
$5,055,028. |
|
|
$5,050,854. |
0.08% |
u |
|||||||||
Data Disclosure |
$5,813. |
$4,337. |
25.39% |
|
|
||||||||||
|
|
a |
|||||||||||||
Data Integrity Loss |
$59,584. |
$56,505. |
5.17% |
||||||||||||
|
|||||||||||||||
rd: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Passwords/Authenticaion |
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Threat |
|
Original ALE |
|
|
ALE with Safeguard |
|
Percentage Drop |
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
S |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
||||||
Threat |
|
|
Original ALE |
|
|
ALE with Safeguard |
|
Percentage Drop |
a |
|
|||||
Data Disclosure |
$5,813. |
|
|
|
|
|
|
|
f |
|
|||||
|
|
|
|
|
|
|
|
||||||||
Data Integrity Loss |
|
$59,584.eguard: Personnel Control |
|
||||||||||||
Safeguard: |
Quality Assurance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Threat |
|
|
Original ALE |
|
|
|
|
|
|
|
|
|
|
||
Data Integrity Loss |
$59,584. |
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
ALE with Safeguard |
|
Percentage Drop |
|
|
||||
Safeguard: |
Risk Analysis |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
Threat |
|
|
Original ALE |
|
|
|
|
|
|
|
|
Data |
|||
n |
|
$5,055,028. |
|
|
ALE with Safeguard |
|
Percentage Drop |
Destructio |
|||||||
|
|
|
|
|
|
|
|
|
|
|
|||||
Data Disclosure |
$5,813. |
$5,232. |
9.99% |
|
|||||||||||
Data Integrity Loss |
$59,584. |
$54,977. |
7.73% |
|
|||||||||||
Safeguard: |
Security Policy |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Threat |
|
Original ALE |
|
|
|
ALE with Safeguard |
|
Percentage Drop |
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
Data Destruction |
$5,055,028. |
|
|
$4,796,256. |
|
|
5.12% |
|
|
|
|
||||
Data Disclosure |
$5,813. |
|
|
$4,703. |
|
|
19.10% |
|
|
|
|
||||
Data Integrity Loss |
$59,584. |
|
|
$52,058. |
|
|
12.63% |
|
|
|
|
||||
The following is a table indicating, for each safeguard, the ALE before (Original ALE) and after the safeguard is implemented (ALE with Safeguard). This table also indicates the difference between the two ALE values.
Also shown is a barchart that provides a visual presentation of the difference in ALE for each safeguard.
Safeguard |
Original AL |
|
ALE with Safeguard |
|
Difference |
|
|
||||
|
|
|
|
|
|
Physical Access Control |
$31,445,536. |
$31,409,712. |
$35,824. |
||
Application Controls |
$31,445,536. |
$30,940,033. |
$505,503. |
||
Classification Markings |
$31,445,536. |
$31,443,182. |
$2,354. |
||
Contract Specifications |
$31,445,536. |
$31,445,536. |
$0. |
||
Data Encryption |
$31,445,536. |
$28,900,174. |
$2,545,362. |
||
Detection System |
$31,445,536. |
$31,431,094. |
$14,442. |
||
Life Cycle Management |
$31,445,536. |
$31,445,189. |
$347. |
||
Passwords/Authenticaion |
$31,445,536. |
$31,445,463. |
$73. |
||
Personnel Clearances |
$31,445,536. |
$31,436,806. |
$8,730. |
||
Personnel Control |
$31,445,536. |
$31,445,451. |
$85. |
||
Quality Assurance |
$31,445,536. |
$31,439,578. |
$5,958. |
||
Risk Analysis |
$31,445,536. |
$31,434,844. |
$10,692. |
||
Security Policy |
$31,445,536. |
$31,178,127. |
$267,409. |
||
Safeguard vs Threat Report |
3 |
Data Encryption
Application Controls
Security Policy
2,545,362 |
505,503 |
267,409 |
Physical Access Control
Detection System
Risk Analysis
Personnel Clearances
Quality Assurance
Classification M arkings
Life Cycle M anagement
Personnel Control
Passwords/Authenticaion
25 |
50 |
75 |
100 |
125 |
|
150 |
175 |
200 |
225 |
250 (x 10,000) |
||||
|
|
|
|
|
|
|
Dollars |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
35,824 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14,442 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10,692 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8,730 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5,958 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2,354 |
25 |
50 |
75 |
100 |
125 |
150 |
175 200 |
225 |
250 |
|
275 |
300 |
325 |
350 (x 100) |
|
|
|
|
|
|
|
|
Dollars |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
347 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
85 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
73 |
25 |
50 |
75 |
100 |
125 |
150 |
175 |
200 |
225 |
250 |
275 |
300 |
325 |
||
|
|
|
|
|
|
|
Dollars |
|
|
|
|
|
|
|
Instructions for preparing Final Reports.
In Phase 4, there are many different reports that can be generated. To facilitate the assembly of these smaller specialized reports into a single "Final Report" for submission to management, provision is made to attach the name of each selected report file (each is a .WRI file) to a list that is made available to the analyst at the end of the reporting phase, Phase 4.
A couple of points must be kept in mind when the final report is assembled; it is assumed that a word processor will be used to prepare the Final Report and the following are tasks and ideas that are within the purview of most word processors:
1. On the parameter screen in Phase 1, you indicated that the sensitivity level of the system being analyzed is 1. Because reports that deal with a system must bear markings that indicated that the report is of a similar level of sensitivity, you are warned that the word processor used in the assembly process must also be used to indicate, as both Headers and
Footers, this level of sensitivity on EVERY page;
2.There is no provision in the RiskWatch system for the title page or pages that come before paragraphs, sections, or diagrams. The analyst wishing these must provide them himself using the facilities of the word processor employed;
3.The ordering of sections is left to the discretion of the analyst - some people prefer to have the Executive Summary as the very first section, even preceding the Table of Contents, while others may wish to
have their Table of Contents immediately following the Cover page;
4.Because of the strong possibility that different enterprises will opt to assemble different pieces (sub-reports) into their respective Final Reports, the Table of Contents for the Final Report is left to the analyst, using the power of a modern word processor.
5.In the text provided by RiskWatch as part of the reports that embody the results of the analysis and the initial data, there are several sections that are enclosed in triple square brackets (that is, [[[ and
]]] ). All |
text |
that |
is |
between these braces is given SOLELY as a guide |
|||
to suggested |
text |
to |
surround the |
numbers that form the basis of the |
|||
reports. The |
text |
serves no other |
purpose. Please replace this text with |
||||
other text |
that |
is more |
appropriate to your enterprise. |
||||
Reo mmendations |
1 |
II.Recommendations
[[[One hundred seventy]]] vulnerabilities were identified which, if not corrected, could result in considerable loss to SpecOrg.
Immediate steps which can be taken are:
[[[
•Correct the fire detection and control vulnerabilities identified during the walk-through.
•Publish and disseminate SpecOrg Disaster Recovery Plan.
• Develop a system-generated cover page for and improve the control of sensitive output listings.
•Review the security of terminals at the Parkview Building.
•Test the adequacy of current system software and user file backups.
•Remind users of the importance of backing up tape files.
•Provide additional training on and enforce existing security policies and procedures.
•Publish and disseminate an SpecOrg-wide policy on the handling of sensitive documents and develop a uniform cover sheet for these documents.
•Review SpecOrg staffing and separation of duties.
•SpecOrg System Security Officer, in coordination with SpecOrg management, should develop a Risk Management Plan to address the implementation of the safeguards with the greatest return on investment.
]]]
[[[
Twelve major safeguards (see CHAPTER IX., Applicable Safeguard Cost Benefit Analysis Summary Table) were recommended which, if implemented, would substantially reduce losses if these threats occurred or prevent the threats from occurring altogether.
SpecOrg System Security Officer should develop a Risk Management Plan in cooperation with SpecOrg management, who will make the final decision as to the selection of applicable safeguards. The Plan will identify the specific steps required to implement the selected safeguards and recommend to SpecOrg management the priority for safeguard implementation.
]]]