Добавил:
Upload
Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз:
Предмет:
Файл:GROUP 5.doc
X
- •1.5 Earth Work
- •2.1 Excavation:
- •2.2 Excavation Operation
- •2.5 Structural Elements
- •2.5.1 Foundation
- •2.5.1.1 Condition That Effect Foundation
- •2.5.1.2 Foundation Types
- •2.5.2 Walls
- •2.5.2.1 Types of Walls
- •2.5.2.2 Building Materials for Wall
- •2.5.2.3 Wall Characteristics
- •2.5.3 Column
- •2.5.3.1 Types of Column
- •2.5.5 Slabs
- •2.5.6 Beams
- •2.5.6.1 Types of Beams
- •2.5.7 Stairs
- •2.5.7.1 Stair Case Materials
- •2.5.8 Roof
- •2.5.8.1 Roof Types
- •2.5.8.2 Roof Connection
- •2.5.8.3 Roof Function
- •2.5.8.4 Roof Materials
- •2.6 Finishing Works
- •2.6.1 Doors and windows
- •2.6.1.1 Standard performance of door and window
- •2.6.1.2 Type of door
- •2.6.2 Plastering
- •2.6.2.1 Type of mortar used for plastering
- •2.6.2.2 Types of Plaster Finishes
- •2.6.2.3 Plastering Materials
- •2.6.2.4 Tools for the Plaster
- •2.6.2.5 Defect in Plastering
- •2.6.4.1 Types of flooring
- •2.6.5 Painting
- •2.6.6 Ceiling
- •2.6.7 Sanitary Installation
- •2.6.8 Plumbing
- •2.6.8.1 Plumbing Materials
- •2.6.8.2 Pipe Connection (Joints)
- •2.6.9 Electrical Installation
- •Introduction
- •3.1.5 Setting out the building
- •3.5 Beam
- •3.5 Slabs
- •3.5.1 Slab Materials
- •3.5.2 Number of Slab of Motels
- •3.7 Finishing Work
- •3.7.1 Plastering
- •3.7.2 Pavement
- •3.7.3 Doors and Windows
- •3.7.4 Drainage
- •3.7.4.1 Sanitary fitting
- •3.7.4.2 Septic Tank
- •3.7.4.3 Water supply
- •3.7.4.4 Painting
- •3.7.4.5 Electrical installation
- •3.8 Bill of Quantity
- •Appendix
Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]
