3.7.4 Drainage

3.7.4.1 Sanitary fitting

  • The W.C is squatting types

  • Showers are in vitreous normal

  • Bath

  • Flips for sewage drainage are in plastic materials

  • Sinks

The fittings on pipe connection in the plastic materials those fitting are:

  • Coupling

  • Reduce

  • Bend

  • Elbow

  • Cross

3.7.4.2 Septic Tank

The motel has first septic tank which receive wastewater from motel the septic tank has size 2m as diameter and 4m as deep and its volume is 12.56metercub the capacity of septic tank is 12560litre it located in distance of 14m from the motel

Material used:

Cement (binder)

Stones

Aggregate (fine, course)

Water

Reinforced concrete formed slab used on top of septic tank as a cover

The second septic tank is for receiving the water after used and has 2m diameter, 4m deep hence the volume is 12560litres this septic tank is located near of the first one at 13m length from the motel building .the materials required for to construct it are same as the first.

Discharging the effluent

The motel drainage is the subsoil irrigation which connected to gully (gully collecting waste water from the both and basin and has 13m length

The drain pipes are in plastic material and has 100mm of diameter the gully is constructed in brick and its cover in concrete

The steam water is collected into the suspended tank and could be used in many services such as:

  • cleaning of motel

  • Irrigation of garden.

3.7.4.3 Water supply

From the water main located at CYASEMAKAMBA to motel building the water supply system is gravitation

The water supply pipes as material are made in plastic from the main to the motel and pipe for sanitary fittings are galvanized iron pipe which the diameter is 50mm.

3.7.4.4 Painting

The external paint used is white for copping and decoration are painted by green color

The internal paint is made in white color and plinth in black color.

N.B: for more information about paint please consider Model Plan

The ceiling on last floor is in suspended type which made with tiles.

3.7.4.5 Electrical installation

The motel installation is depend upon the uses of different component of our building such as

Lodge and restaurant :-discharge lamps

Dancing room :- signal lamps

Auditorium, garage and verandah :-tube lamps

Garden :-tub lamps

External light :tub lamps

3.8 Bill of Quantity

Abstract of Estimator of Cost

item (a)

Earth work

Unity

Quantity

Rate (in rwf)

Amount ( in rwf)

1

2

3

4

Clearing the site

Excavation

Footing

foundation

m2

m3

m3

2.502

82

25

59

140

1200

1200

12000

50280

98400

30000

70800

Total

549480

item(b)

Construction of substructure

unity

quantity

rate

amount

1

2

3

4

-Consolidation of concrete

-Footings

-foundation

-equalization concrete

m3

m3

m3

m2

15.358

15.5

20.7

40.54

70000

281600

45000

70.000

1075060

4364800

931500

2837800

Total

9209160

ITEM(C)

GROUND FLOOR WORKS

UNITY

QUANTITY

RATE

AMOUNTY

1

2

3

4

block

column

doors

windows

m3

m3

m2

m2

53.668

12.9

22

20.5

55200

281600

54250

63700

2962473.6

3632640

1193500

1305050

Total

9094463.6

Item(d)

Finishing for ground floor

unity

quantity

rate

amount

1.

2.

3.

4.

5.

Plaster

Paint

Sub grade concrete

Blinding concrete

Floor covering

m2

m2

m3

m3

m3

961.5

961.5

54.5

343.5

343.5

4200

1600

70000

70000

4500

4038300

1538400

3815000

24045000

1545750

Total

34982450

Item(e)

First floor works

unity

quantity

rate

amount

1.

2.

3.

4.

5.

6.

7.

Slab

Column

Blocks

Plastering

Paint

Beam

openings

m3

m3

m3

m2

m2

m3

m2

71.7

12.5

63.5

941.5

941.5

15.5

164.68

275400

281600

55200

4200

1600

275400

58975

19746180

3520000

3505200

3954300

1506400

4268700

9712003


Total

46212783

Item(f)

Second floor

unity

quantity

rate

Amount

1.

2.

3.

4.

5.

6.

7.

8.

9.

Slab

Column

Blocks

Plastering

Paint

Beam

Ceiling

Stairs

glazing

m3

m3

m3

m2

m2

m3

m2

m3

m2

64.5

14.5

77.5

752.5

752.5

14.5

582.5

15.5

73.5

275400

281600

55200

4200

1600

275400

3200

275400

9500

1773300

3520000

4278000

3160500

1204000

39933000

1864000

4268700

698250

Total

60699750

Item(g)

roof

unity

quantity

rate

Amount

1.

2.

3.

4.

Trusses

Covering

Nail screw

gutter

m3

m2

m

m

12.5

622

168.5

24

9844

9500

2500

7500

123050

5909000

421250

180000

Total

6633300

Item(h)

Swimming poor

unity

quantity

rate

amount

1.

2.

3.

4.

Constructed volume

Plastering

Painting

stairs

m3

m2

m2

m3

52.5

126.5

126.5

4

45000

4200

1600

275400

2362500

531720

202400

1101600

Total

4198220

Item(i)

reception building

Unity

quantity

rate

amount

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

Foundation

Blocks

Plaster

Paint

Sub grade concrete

Covering finishing core

Ceiling

Trusses

Covering roof

Opening

Nail screw

m3

m3

m2

m2

m3

m2

m2

m3

m2

m2

m

8.5

7.5

31.5

31.5

3.1

11.5

11.5

4

7

5

16

45000

55200

4200

1600

70000

4500

3200

9844

9500

58975

168.5

382500

414000

132300

50400

217000

51750

36800

39376

66500

494875

2696

Total

945797

Item(j)

facing

unity

quantity

rate

amount

1.

2.

3.

4.

5.

6.

7.

Foundation

Equalization concrete

Blocks

Plaster

Paint

Coping

opening

m3

m2

m3

m2

m2

m

m2

41

81

101

1001

1001

201

7.3

45000

70000

55200

4200

1600

2000

58975

145000

5670000

5575200

4204200

1601600

402000

430517.5

Total

18287517

Item(k)

Cost of electrical installation

2850000

Total

2850000

Item(l)

Cost of plumbing

3100000

Total

3100000

Item(m)

Cost of garden

1500000

Total

1500000

Total cost without contingency and expenditure

197,472,820

Total cost with contingency and expenditure of Motel is 212900917rwf

Table 2: Bill of quantity

Conclusion

We conclude that, the construction of BPR of KAYONZA District have the importance of increase the Construction knowledge and District development when making in practices; the construction cost is

This cost has been determined by the calculation of materials used and their qualities, also the building dimensions, location influenced that cost. As the building will be of the KAYONZA District popular that cost will obtain by BPR because is a branch of BPR.

References

  • www.wikipedia.com

  • www.encyclopedia.com

  • www.google.com

  • Motivate (prepared by Denis Walton)

  • Rwanda building control Regulation 2009

  • Unpublished lecture notes (ETO Kibungo 2009 – 2010)

Recommendation

First, we recommend ETO Kibungo to improve I.C.T as a result in construction drawing and references for ETO Kibungo technician Students.

Secondary, we recommend W.D.A as technique government institution to highly make collaboration of Rwanda technical schools and technical companies for improvement of practical skills to future technician student and for making in practice their prepared project example this are of construction Bank building.