- •1.5 Earth Work
- •2.1 Excavation:
- •2.2 Excavation Operation
- •2.5 Structural Elements
- •2.5.1 Foundation
- •2.5.1.1 Condition That Effect Foundation
- •2.5.1.2 Foundation Types
- •2.5.2 Walls
- •2.5.2.1 Types of Walls
- •2.5.2.2 Building Materials for Wall
- •2.5.2.3 Wall Characteristics
- •2.5.3 Column
- •2.5.3.1 Types of Column
- •2.5.5 Slabs
- •2.5.6 Beams
- •2.5.6.1 Types of Beams
- •2.5.7 Stairs
- •2.5.7.1 Stair Case Materials
- •2.5.8 Roof
- •2.5.8.1 Roof Types
- •2.5.8.2 Roof Connection
- •2.5.8.3 Roof Function
- •2.5.8.4 Roof Materials
- •2.6 Finishing Works
- •2.6.1 Doors and windows
- •2.6.1.1 Standard performance of door and window
- •2.6.1.2 Type of door
- •2.6.2 Plastering
- •2.6.2.1 Type of mortar used for plastering
- •2.6.2.2 Types of Plaster Finishes
- •2.6.2.3 Plastering Materials
- •2.6.2.4 Tools for the Plaster
- •2.6.2.5 Defect in Plastering
- •2.6.4.1 Types of flooring
- •2.6.5 Painting
- •2.6.6 Ceiling
- •2.6.7 Sanitary Installation
- •2.6.8 Plumbing
- •2.6.8.1 Plumbing Materials
- •2.6.8.2 Pipe Connection (Joints)
- •2.6.9 Electrical Installation
- •Introduction
- •3.1.5 Setting out the building
- •3.5 Beam
- •3.5 Slabs
- •3.5.1 Slab Materials
- •3.5.2 Number of Slab of Motels
- •3.7 Finishing Work
- •3.7.1 Plastering
- •3.7.2 Pavement
- •3.7.3 Doors and Windows
- •3.7.4 Drainage
- •3.7.4.1 Sanitary fitting
- •3.7.4.2 Septic Tank
- •3.7.4.3 Water supply
- •3.7.4.4 Painting
- •3.7.4.5 Electrical installation
- •3.8 Bill of Quantity
- •Appendix
3.7.4 Drainage
3.7.4.1 Sanitary fitting
The W.C is squatting types
Showers are in vitreous normal
Bath
Flips for sewage drainage are in plastic materials
Sinks
The fittings on pipe connection in the plastic materials those fitting are:
Coupling
Reduce
Bend
Elbow
Cross
3.7.4.2 Septic Tank
The motel has first septic tank which receive wastewater from motel the septic tank has size 2m as diameter and 4m as deep and its volume is 12.56metercub the capacity of septic tank is 12560litre it located in distance of 14m from the motel
Material used:
Cement (binder)
Stones
Aggregate (fine, course)
Water
Reinforced concrete formed slab used on top of septic tank as a cover
The second septic tank is for receiving the water after used and has 2m diameter, 4m deep hence the volume is 12560litres this septic tank is located near of the first one at 13m length from the motel building .the materials required for to construct it are same as the first.
Discharging the effluent
The motel drainage is the subsoil irrigation which connected to gully (gully collecting waste water from the both and basin and has 13m length
The drain pipes are in plastic material and has 100mm of diameter the gully is constructed in brick and its cover in concrete
The steam water is collected into the suspended tank and could be used in many services such as:
cleaning of motel
Irrigation of garden.
3.7.4.3 Water supply
From the water main located at CYASEMAKAMBA to motel building the water supply system is gravitation
The water supply pipes as material are made in plastic from the main to the motel and pipe for sanitary fittings are galvanized iron pipe which the diameter is 50mm.
3.7.4.4 Painting
The external paint used is white for copping and decoration are painted by green color
The internal paint is made in white color and plinth in black color.
N.B: for more information about paint please consider Model Plan
The ceiling on last floor is in suspended type which made with tiles.
3.7.4.5 Electrical installation
The motel installation is depend upon the uses of different component of our building such as
Lodge and restaurant :-discharge lamps
Dancing room :- signal lamps
Auditorium, garage and verandah :-tube lamps
Garden :-tub lamps
External light :tub lamps
3.8 Bill of Quantity
Abstract of Estimator of Cost
-
item (a)
Earth work
Unity
Quantity
Rate (in rwf)
Amount ( in rwf)
1
2
3
4
Clearing the site
Excavation
Footing
foundation
m2
m3
m3
2.502
82
25
59
140
1200
1200
12000
50280
98400
30000
70800
Total
549480
item(b) |
Construction of substructure |
unity |
quantity |
rate |
amount |
||
1
2 3 4
|
-Consolidation of concrete -Footings -foundation -equalization concrete
|
m3
m3 m3 m2 |
15.358
15.5 20.7 40.54 |
70000
281600 45000 70.000 |
1075060
4364800 931500 2837800 |
||
Total |
|
|
|
|
9209160 |
||
|
|||||||
ITEM(C) |
GROUND FLOOR WORKS |
UNITY |
QUANTITY |
RATE |
AMOUNTY |
||
1 2 3 4 |
block column doors windows |
m3 m3 m2 m2 |
53.668 12.9 22 20.5 |
55200 281600 54250 63700
|
2962473.6 3632640 1193500 1305050 |
||
Total |
|
|
|
|
9094463.6 |
||
Item(d) |
Finishing for ground floor |
unity |
quantity |
rate |
amount |
||
1. 2. 3. 4. 5. |
Plaster Paint Sub grade concrete Blinding concrete Floor covering
|
m2 m2 m3 m3 m3 |
961.5 961.5 54.5 343.5 343.5 |
4200 1600 70000 70000 4500 |
4038300 1538400 3815000 24045000 1545750 |
||
Total |
|
|
|
|
34982450 |
||
|
|||||||
Item(e) |
First floor works |
unity |
quantity |
rate |
amount |
||
1. 2. 3. 4. 5. 6. 7. |
Slab Column Blocks Plastering Paint Beam openings |
m3 m3 m3 m2 m2 m3 m2 |
71.7 12.5 63.5 941.5 941.5 15.5 164.68
|
275400 281600 55200 4200 1600 275400 58975 |
19746180 3520000 3505200 3954300 1506400 4268700 9712003 |
||
-
Total
46212783
Item(f)
Second floor
unity
quantity
rate
Amount
1.
2.
3.
4.
5.
6.
7.
8.
9.
Slab
Column
Blocks
Plastering
Paint
Beam
Ceiling
Stairs
glazing
m3
m3
m3
m2
m2
m3
m2
m3
m2
64.5
14.5
77.5
752.5
752.5
14.5
582.5
15.5
73.5
275400
281600
55200
4200
1600
275400
3200
275400
9500
1773300
3520000
4278000
3160500
1204000
39933000
1864000
4268700
698250
Total
60699750
Item(g)
roof
unity
quantity
rate
Amount
1.
2.
3.
4.
Trusses
Covering
Nail screw
gutter
m3
m2
m
m
12.5
622
168.5
24
9844
9500
2500
7500
123050
5909000
421250
180000
Total
6633300
Item(h)
Swimming poor
unity
quantity
rate
amount
1.
2.
3.
4.
Constructed volume
Plastering
Painting
stairs
m3
m2
m2
m3
52.5
126.5
126.5
4
45000
4200
1600
275400
2362500
531720
202400
1101600
Total
4198220
Item(i)
reception building
Unity
quantity
rate
amount
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Foundation
Blocks
Plaster
Paint
Sub grade concrete
Covering finishing core
Ceiling
Trusses
Covering roof
Opening
Nail screw
m3
m3
m2
m2
m3
m2
m2
m3
m2
m2
m
8.5
7.5
31.5
31.5
3.1
11.5
11.5
4
7
5
16
45000
55200
4200
1600
70000
4500
3200
9844
9500
58975
168.5
382500
414000
132300
50400
217000
51750
36800
39376
66500
494875
2696
Total
945797
Item(j)
facing
unity
quantity
rate
amount
1.
2.
3.
4.
5.
6.
7.
Foundation
Equalization concrete
Blocks
Plaster
Paint
Coping
opening
m3
m2
m3
m2
m2
m
m2
41
81
101
1001
1001
201
7.3
45000
70000
55200
4200
1600
2000
58975
145000
5670000
5575200
4204200
1601600
402000
430517.5
Total
18287517
Item(k)
Cost of electrical installation
2850000
Total
2850000
Item(l)
Cost of plumbing
3100000
Total
3100000
Item(m)
Cost of garden
1500000
Total
1500000
-
Total cost without contingency and expenditure
197,472,820
Total cost with contingency and expenditure of Motel is 212900917rwf
Table 2: Bill of quantity
Conclusion
We conclude that, the construction of BPR of KAYONZA District have the importance of increase the Construction knowledge and District development when making in practices; the construction cost is
This cost has been determined by the calculation of materials used and their qualities, also the building dimensions, location influenced that cost. As the building will be of the KAYONZA District popular that cost will obtain by BPR because is a branch of BPR.
References
www.wikipedia.com
www.encyclopedia.com
www.google.com
Motivate (prepared by Denis Walton)
Rwanda building control Regulation 2009
Unpublished lecture notes (ETO Kibungo 2009 – 2010)
Recommendation
First, we recommend ETO Kibungo to improve I.C.T as a result in construction drawing and references for ETO Kibungo technician Students.
Secondary, we recommend W.D.A as technique government institution to highly make collaboration of Rwanda technical schools and technical companies for improvement of practical skills to future technician student and for making in practice their prepared project example this are of construction Bank building.