3.5 Slabs

3.5.1 Slab Materials

Reinforced concrete as material for slabs construction

Motel building slabs should cast in situ

3.5.2 Number of Slab of Motels

The motel building has two slabs such as:

  • First floor slab

  • Second floor slab

First Floor Slab:

  • Thickness is 20cm

  • Length is 23.5cm

  • Width is 13.5cm

  • Second Slab

  • Thickness is 20cm

  • Length is 20cm

  • Width is 13.5c

The slab should have enough strength and durability to resist against imposed load, dead load and wind load

3.6 Roofs

3.6.1 Roof Types

The motel building roof types is couple roof

3.6.2 Materials of Roof

For forming truss : steel

For roof cover : iron sheet

For nailing : nails scours

For connecting truss : welding

For making gutter: steel with U form

3 .6.3 Roof dimension

Figure 10: Trusses

Figure 10: roof truss

  • Height of principle post is 1.30cm

  • Thickness of principle post is 8X10cm

  • Tie beam is 8X10cm

  • Purlin is 5X8cm

  • Main rafter is 5X8cm

  • Roof cover is 90X300cm

  • Screw nail (1) is 21cm

  • Gutter is 20X25cm

  • Wall plate (1) is 20000cm

  • Number of truss is 7trus

3.7 Finishing Work

Our motel building is finished by different Work such as:

  • Plastering

  • Pavement(flooring)

  • Door and window

  • Drainage

  • Water supply

  • Painting

  • Electrical installation

3.7.1 Plastering

  • Plaster surface

  • The motel plaster surface is located where there are no openings

  • Plaster materials

The motel building of NGOMA district should be plastered by those materials:

  • Cement

  • Sand

  • Water

  • Plaster coat:

External plaster : 3coat

Internal plaster : 2coat

The thickness plaster is 1cm each coat

Plaster ratio: 1:6

3.7.2 Pavement

  • Pavement surface

  • Ground floor pavement

Materials:

  • Cement

  • Sand

  • Water

  • Tiles and Stone(hard core)

The tiles materials are used for finishing on toilets surface (room) and other surface on ground floor are finished with the left materials as shown in figure bellow

.

Figure 11: Pavement

First and second floor finish

The finish above needs those materials:

  • Cement

  • Sand

NB: toilet and bath room are finished with a layer of tiles

3.7.3 Doors and Windows

Windows Material

  • Glazing

  • Frame of windows is steel

Dimension of window for ground floor:

  • Height of window is1.6m

  • Length is 2m

Dimension for first and second floor

  • Height of windows 2m

  • Lengths of window 2m in general have square frame

Doors Materials:

  • Glazing and

Frame and shutter are steel

  • Plywood

  • Woods

External Doors

The external doors need to be constructed on following materials panels with glasses

Internal doors

The internal doors of motel building are constructed in flush materials (flush doors)

Doors dimensions

- External: doors: 2.10 x 150cm

N.B: Garage Door has 210 to 200cm

-Internal doors: 2.10 x 80cm