Description

Code Identification for Instruments

500.20

Page 1 (3)

Edition 01H

 

 

 

 

L23/30H

Symbol explanation:

TI

Measuring device

40

Local reading

Temperature Indicator

No 40 *

PI 22

TAH 12

08028-0D/H5250/94.08.12

Measuring device

Sensor mounted on engine/unit

Reading/identification mounted in a panel on the engine/unit

Pressure Indicator

No 22 *

Measuring device

Sensor mounted on engine/unit

Reading/identification outside the engine/unit

Temperature Alarm High

No. 12 *

* Refer to standard location and text for instruments on the following pages.

Specification of letter code for measuring devices

1st letter

Following letters

 

 

 

 

 

 

F

Flow

A

Alarm

L

Level

D

Differential

P

Pressure

E

Element

S

Speed

H

High

T

Temperature

I

Indicating

U

Voltage

L

Low

V

Viscosity

S

Switching, Stop

X

Sound

T

Transmitting

Z

Position

X

Failure

 

 

 

 

 

96.02 - ES1U-G

500.20

Code Identification for Instruments

Description

Edition 01H

Page 2 (3)

 

 

 

 

L23/30H

Standard Text for Instruments

Diesel engine/Alternator

LT Water System

01

inlet to air cooler

05

outlet from alternator

02

outlet from air cooler

06

outlet from fresh water cooler (SW)

03

outlet from lub. oil cooler

07

inlet to lub. oil cooler

04

inlet to alternator

08

inlet to fresh water cooler (SW)

 

 

09

 

HT Water System

 

 

10

inlet to engine

14B FW outlet air cooler

10A

FW inlet to engine

15

outlet HT system

11

outlet each cylinder

16

outlet turbocharger

12

outlet from engine

17

outlet fresh water cooler

13

inlet to HT pump

18

inlet fresh water cooler

14

inlet HT air cooler

19A

inlet prechamber

14A

FW inlet air cooler

19B outlet prechamber

Lubricating Oil System

 

 

20

inlet to cooler

25

prelubricating

21

outlet from cooler / inlet to filter

26

inlet rocker arms and roller guides

22

outlet from filter / inlet to engine

27 intermediate bearing / alternator bearing

23

inlet to turbocharger

28

level in base frame

24

sealing oil - inlet engine

29

main bearings

Charging Air System

 

 

30

inlet to cooler

35

surplus air inlet

31

outlet from cooler

36

inlet to turbocharger

32

jet assist system

37

charge air from mixer

33

outlet from TC filter / inlet to TC compressor

38

 

34

 

39

 

Fuel Oil System

 

 

40

inlet to engine

45

fuel-rack position

41

outlet from engine

46

inlet prechamber

42

leakage

47

 

43

inlet to filter

48

 

44

outlet sealing oil pump

49

 

08028-0D/H5250/94.08.12

96.02 - ES1U-G

Description

 

Code Identification for Instruments

500.20

Page 3 (3)

 

Edition 01H

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L23/30H

Cooling Oil System

 

 

 

50

inlet to fuel valves

55

 

 

51

outlet from fuel valves

56

 

 

52

 

 

57

 

 

53

 

 

58

 

 

54

 

 

59

 

 

Exhaust Gas System

 

 

 

60

outlet cylinder

65

 

 

61

outlet turbocharger

66

 

 

62

inlet turbocharger

67

 

 

63

 

 

68

 

 

64

 

 

69

 

 

Compressed Air System

 

 

 

70

inlet to engine

75

microswitch for turning gear

 

71

inlet to stop cylinder

76

inlet turning gear

 

72

inlet to balance arm unit

77

waste gate pressure

 

73

control air

78

inlet to sealing oil system

 

74

inlet to reduction valve

79

 

 

Load Speed

08028-0D/H5250/94.08.12

80

81 overspeed

82

83

84

Miscellaneous

91natural gas - inlet to engine

92oil mist detector

93knocking sensor

94cylinder lubricating

85 microswitch for overload

86

87

88index - fuel pump

89turbocharger speed

90engine speed

95voltage

96switch for operating location

96.02 - ES1U-G

Description

Introduction to Planned Maintenance Programme

500.24

Page 1 (1)

Edition 02H

 

 

 

 

 

General

The overhaul intervals are based on operation on a specified fuel oil quality at normal service output, which means 70-100% of MCR.

In the long run, it is not possible to obtain a secure and optimal economical running without an effective maintenance system.

With the structure and amount of information in the maintenance programme, it can be integrated in the entire ship's/power station's maintenance system or it can be used separately.

The crux of the maintenance system is the key diagram, see page 500.25, indicating the inspection intervals for the components/systems, so that the crew can make the necessary overhauls, based on the engines' condition and/or the time criteria.

The stated recommended intervals are only for guidance as different service conditions, the quality of the fuel oil and the lubricating oil, treatment of the cooling water, etc, will decisively influence the actual service results and thus the intervals between necessary overhauls.

L23/30H

4. Related procedures - indicates other works, depending on this work - or works which would be expedient to carry out.

5. Indicates x number of men in x number of hours for accomplishing the work.

The stated consumption of hours is only intended as a guide.

Experience with the specific station/crew may lead to a bringing up-to-date.

6. Refers to data, which are required for carrying out the work.

7. Special tools, which must be used. Please note that not all tools are standard equipment.

8. Various requisite hand tools.

9. Indicates the components/parts, which it is advisible to replace during the maintenance work. Please note, that this is a condition for the intervals stated.

08028-0D/H5250/94.08.12

Experience with the specific plant/crew is to be used for adjustment of time between overhaul. Further it is to be used for adjusting the timetable stated for guidance in the working cards.

Working Cards

Each of the working cards can be divided into two: a front page and one or several pages, describing and illustrating the maintenance work.

The front page indicates the following:

1. Safety regulations, which MUST be carried out before the maintenance work can start.

2. A brief description of the work.

3. Reference to work, which must be carried out, if any, before the maintenance work can start.

1

7

 

2

 

3

 

 

8

4

 

5

9

 

6

 

Fig 1. Guidance instruction for working cards.

96.02 - ES0S-G

 

Description

 

Planned Maintenance Programme

 

 

 

 

 

 

500.25

 

Page 1 (4)

 

 

 

 

 

 

 

Edition 01H

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L23/30H

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

720/750 RPM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

new/Check partsoverhauled hoursafter

Time Between Overhaul

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Working

 

 

 

Description

l =

Overhaul to be carried out

50

200

2000

8000

16000

32000

Daily

Weekly

Monthly

month3rd

Observations

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Card

 

 

 

n =

Check the condition

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operating of Engine:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Readings of data for engine and alternator with refe-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rence to "Engine Performance Data", section 502.01 ......

 

 

 

 

 

 

 

 

n

 

 

 

 

502-01.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cylinder Head:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inlet and exhaust valve - overhaul and regrinding of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

spindle and valve seat

....................................................

 

 

 

 

 

 

l

 

 

 

 

 

 

 

505-01.10

 

 

 

Inspection of inlet, exhaust valves and valve guide ........

 

 

 

 

 

n

 

 

 

 

 

 

 

505-01.05

 

 

 

Check of valve rotators' rotation during engine rotation....

 

 

 

n

 

 

 

 

 

 

 

 

 

505-01.05

 

 

 

Sleeve for fuel injector ....................................................

 

 

 

 

 

 

 

n

 

 

 

 

 

 

 

505-01.30

 

 

 

Safety valve - overhaul and adjustment of opening

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pressure ..........................................................................

 

 

 

 

 

 

 

n

 

 

 

 

 

 

 

505-01.25

 

 

 

Indicator valve ................................................................

 

 

 

 

 

 

 

n

 

 

 

 

 

n

505-01.26

 

 

 

...............Cylinder head cooling water space - inspection

 

 

 

 

 

n

 

 

 

 

 

 

 

505-01.45

 

 

 

Cylinder head nut - retightening .......................................

 

200

 

 

 

 

 

 

 

 

 

 

 

 

505-01.40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Piston, Connecting Rod and Cylinder Liner:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspection of piston .........................................................

 

 

 

 

 

 

 

n

 

 

 

 

 

 

 

506-01.10

 

 

 

Piston ring and scraper ring ............................................

 

 

 

 

 

 

l

 

 

 

 

 

 

 

506-01.10

 

 

 

Piston pin and bush for connecting rod - check of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

clearance ........................................................................

 

 

 

 

 

 

 

n

 

 

 

 

 

 

 

506-01.15

 

 

 

....................Connecting rod - measuring of big-end bore

 

 

 

 

 

n

 

 

 

 

 

 

 

506-01.15

 

 

 

................................Inspection of big-end bearing shells

 

 

 

 

 

n

 

 

 

 

 

 

 

506-01.16

 

0D/H5250/94.08.12

 

Connecting rod - retightening ...........................................

 

200

 

 

 

n

 

 

 

 

 

 

 

 

506-01.25

 

 

Camshaft and Camshaft Drive:

 

 

 

 

 

 

l

 

 

 

 

 

 

 

506-01.35

 

 

 

...............Cylinder liner - cleaning, honing and measuring

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cylinder liner removed - check the water space and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

wear ring in frame ...........................................................

 

 

 

 

 

 

 

 

n

 

 

 

 

 

 

506-01.40

 

08028-

 

Camshaft - Inspection of gear wheels, bolts, connections

 

 

 

 

 

 

 

 

 

 

 

 

 

507-01.00

 

 

 

etc. .................................................................................

 

 

200

 

 

 

 

n

 

 

 

 

 

 

 

 

 

 

.....................Camshaft bearing - inspection of clearance

 

 

 

 

 

n

 

 

 

 

 

 

 

507-01.05

 

 

 

....................Camshaft adjustment - check the condition

 

 

 

 

 

n

 

 

 

 

 

 

 

507-01.20

 

 

 

..........................Lubrication of camshaft bearing - check

 

 

 

 

 

n

 

 

 

 

 

 

 

507-01.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

96.02 - ES0U

500.25

Planned Maintenance Programme

Description

Edition 01H

Page 2 (4)

 

 

 

 

 

L23/30H

720/750 RPM

 

 

 

new/Check partsoverhauled hoursafter

Time Between Overhaul

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Working

Description

l =

Overhaul to be carried out

50

200

2000

8000

16000

32000

Daily

Weekly

Monthly

month3rd

Observations

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Card

n =

Check the condition

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operating Gear for Inlet Valves, Exhaust Valves and

 

 

 

 

 

 

 

 

 

 

 

 

 

Fuel Injection Pumps:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Roller guide for valve gear ...............................................

 

 

 

 

 

 

 

n

 

 

 

 

 

 

508-01.00

Valve gear - valve bridge, spring, push rod, etc ..............

 

 

 

 

 

n

 

 

 

 

 

 

508-01.10

Roller guide for fuel injection pump

..................................

 

 

 

 

 

n

 

 

 

 

 

 

508-01.05

Roller guide housing ........................................................

 

 

 

 

 

 

 

n

 

 

 

 

 

 

508-01.10

Inlet and exhaust valve - check and adjustment of valve

 

 

 

 

 

 

 

 

 

 

 

 

508-01.10

clearance ........................................................................

 

 

 

 

 

n

 

 

 

 

 

 

 

 

Lubricating of operating gear - check...............................

 

 

 

 

 

n

 

 

 

 

 

 

508-01.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

508-01.05

Control and Safety System, Automatics and

 

 

 

 

 

 

 

 

 

 

 

 

 

Instruments:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety, alarm and monitoring equipment .........................

 

 

 

 

 

 

 

 

 

 

n

 

509-01.00

Lambda controller - adjustment .......................................

 

 

 

 

 

 

 

 

 

 

 

n

 

509-10.00

Governor - check oil level, see governor instruction

 

 

 

 

 

 

 

 

 

 

 

 

 

book, section 509 ...........................................................

 

 

 

 

 

 

 

 

 

 

 

 

n

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Crankshaft and Main Bearing:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Checking of main bearings alignment, (autolog) ..............

 

 

 

 

n

 

 

 

 

 

 

 

510-01.00

Inspection af main bearing ..............................................

 

 

 

 

 

 

 

 

n

 

 

 

 

 

510-01.05

Inspection of guide bearing .............................................

 

 

 

 

 

 

n

 

 

 

 

 

 

 

510-01.10

Vibration damper - check the condition ...........................

 

 

 

 

 

n

 

 

 

 

 

 

510-04.00

Lubricating of gear wheel for lub. oil pump and cooling

 

 

 

 

 

 

 

 

 

 

 

 

 

water pump etc. ..............................................................

 

 

 

 

 

 

 

 

n

 

 

 

 

 

 

Counterweight - retightening, see page 500.40 ................

200

 

 

 

n

 

 

 

 

 

 

 

 

Mainand guide bearing cap - retightening ......................

200

 

 

 

n

 

 

 

 

 

 

 

510-01.05

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

510-01.10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08028-0D/H5250/94.08.12

96.02 - ES0U

Description

Planned Maintenance Programme

500.25

Page 3 (4)

Edition 01H

 

 

 

 

 

 

08028-0D/H5250/94.08.12

Description

l =

Overhaul to be carried out

n =

Check the condition

 

Engine Frame and Baseframe:

Holdingdown bolts - retightening, see page 500.40 ..........

Bolts between engine frame and base frame -

retightening, see page 500.40 .........................................

For flexible mounted engines - check anti-vibration

mountings .......................................................................

Safety cover - function test .............................................

Turbocharger System:

Wet cleaning of turbine side ............................................

Water washing of compressor side..................................

Cleaning of air filter - compressor side (see turbo-

charger instruction book) .................................................

Turbocharger complete - dismantling, cleaning, inspec-

tion etc. (see turbocharger instruction book) ....................

Charging air cooler - cleaning and inspection...................

Charging air cooler housing - draining ..............................

Exhaust pipe - compensator ...........................................

Compressed Air System:

Air starter motor - dismantling and inspection .................

Function test - main starting valve, starting valve, main

valves and emergency start valve ...................................

Dirt separator - dismantling and cleaning .........................

Muffler - dismantling and cleaning ...................................

Compressed air system - draining ...................................

Compressed air system - check of the system ...............

 

 

 

 

 

 

 

 

 

 

 

L23/30H

 

 

 

 

 

 

 

 

 

 

 

720/750 RPM

new/Check partsoverhauled hoursafter

Time Between Overhaul

 

 

 

 

 

 

 

 

 

 

 

Working

50

200

2000

8000

16000

32000 Daily

Weekly

Monthly

month3rd

Observations

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Card

 

 

 

 

 

 

 

 

 

 

 

No

200

 

 

 

n

 

 

 

 

 

 

 

200

 

 

 

n

 

 

 

 

 

 

 

200

 

 

 

n

 

 

 

 

 

 

519-03.00

 

 

 

 

n

 

 

 

 

 

 

511-01.00

 

 

 

 

 

 

 

l

 

 

 

512-15.00

 

l

 

 

 

 

 

 

 

 

 

512-05.00

 

 

 

 

 

 

 

 

 

 

n 512-01.00

 

 

 

 

 

 

 

 

 

 

l

 

 

 

 

 

 

 

 

 

 

 

n

 

n 513-01.30

n 513-01.40

l l

l 513-01.90 n 513-01.90

96.02 - ES0U

500.25

Planned Maintenance Programme

Description

Edition 01H

Page 4 (4)

 

 

 

 

 

L23/30H

720/750 RPM

 

 

 

new/Check partsoverhauled hoursafter

Time Between Overhaul

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Working

Description

l =

Overhaul to be carried out

50

200

2000

8000

16000

32000

Daily

Weekly

Monthly

month3rd

Observations

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Card

n =

Check the condition

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fuel Oil System and Injection Equipment:

 

 

 

 

 

 

 

 

 

 

 

 

 

Fuel oil filter - dismantling and cleaning ...........................

 

 

 

 

 

 

 

 

 

 

 

l

514-01.15

Fuel oil feed pump ..........................................................

 

 

 

 

 

 

 

 

 

 

 

 

 

l

514-10.00

Fuel oil injection pump - dismantling and cleaning ...........

 

 

 

 

 

 

 

 

 

 

 

l

514-01.05

Fuel injection valve - adjustment of opening pressure .....

200

 

 

n

 

 

 

 

 

 

 

 

514-01.10

Fuel oil high-pressure pipe - dismantling and check ........

 

 

 

n

 

 

 

 

 

 

 

 

514-01.05

Adjustment of the maximum combustion pressure ..........

 

 

 

 

 

 

 

 

 

 

 

l

514-05.01

Fuel oil system - check the system ................................

 

 

 

 

 

 

 

 

 

 

n

 

514-01.90

Fuel oil - oil samples after every bunkering, see sec.504

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricating Oil System:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricating oil pump - engine-driven ................................

 

 

 

 

 

n

 

 

 

 

 

 

515-01.00

Lubricating oil filter - cleaning and exhange .....................

 

 

 

 

 

 

 

 

 

 

 

l

515-01.10

Lubricating oil cooler .......................................................

 

 

 

 

 

 

 

 

 

 

 

 

 

l

515-06.00

Prelubricating pump - el. driven .......................................

 

 

 

 

 

 

n

 

 

 

 

 

 

515-01.05

Thermostatic valve .........................................................

 

 

 

 

 

 

 

 

 

 

 

 

 

n

515-01.20

Centrifugal filter - cleaning and exhange of paper ............

 

 

 

 

 

 

 

 

 

 

 

l

515-15.00

Hand pump .....................................................................

 

 

 

 

 

 

 

 

 

 

 

 

 

l

515-10.00

Lubricating oil - oil samples, see section 504 ..................

 

 

 

 

 

 

 

 

 

 

n

 

 

Lubricating oil system - check the system ......................

 

 

 

 

 

 

 

 

 

 

n

 

515-01.90

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cooling Water System:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cooling water pump - engine-driven (sea water and

 

 

 

 

 

 

 

 

 

 

 

 

 

fresh water) .....................................................................

 

 

 

 

 

 

 

n

 

 

 

 

 

 

516-04.00

Thermostatic valve .........................................................

 

 

 

 

 

 

 

 

 

 

 

 

n

 

516-04.00

Cooling water system - check the system.......................

 

 

 

 

 

 

 

 

 

n

 

 

516-01.90

Cooling water system - water samples, see sec. 504 ......

 

 

 

 

 

 

 

n

 

n

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08028-0D/H5250/94.08.12

96.02 - ES0U

Description

Operation Data & Set Points

500.30

Page 1 (2)

Edition 01H

 

 

 

 

08028-0D/H5250/94.08.12

 

 

Normal Value at Full load

Alarm Set point

Autostop of engine

 

 

 

 

 

 

 

 

Lubricating Oil

 

 

 

 

 

 

 

System

 

TI 20

60-70° C

TAH 20

90° C

 

 

Temp. before cooler

SAE 30

 

 

TI 20

65-75° C

TAH 20

100° C

 

 

(outlet engine)

SAE 40

TI 22

45-60° C

TAH 22

75° C

TSH 22

85° C

Temp. after cooler

SAE 30

TI 22

50-65° C

TAH 22

85° C

TSH 22

95° C

(inlet engine)

SAE 40

PI 22

3-4 bar

PAL 22

3 bar

PSL 22

2.5 bar

Pressure after filter (inlet eng.)

 

 

 

 

 

 

Elevated pressure e.g. when

PI 22

4-5 bar

PAL 22

4 bar

PSL 22

3.5 bar

centrifugal filter installed

PDAH 21-22

0.5-1 bar

PDAH 21-22

1.5 bar

 

 

Pressure drop across filter

 

 

PI 25

0.5-0.8 bar

LAL 25

level switch

 

 

Prelubricating pressure

 

 

PI 23

1.1-1.3 bar

 

 

 

 

Pressure inlet turbocharger

 

 

LAL 28/LAH

low/high level

 

 

Lub. oil level in base frame

 

 

 

 

TE 29

75-85° C

28

95° C

 

 

Temp. main bearings

 

TAH 29

 

 

 

 

 

 

 

 

Fuel Oil System

 

PI 40

2-3 bar

 

1.5 bar

 

 

Pressure after filter

MDO

PAL 40

 

 

PI 40

(A)

4 bar

 

 

 

HFO

 

 

PAL 40

leakage

 

 

Leaking oil

 

 

 

LAH 42

 

 

 

 

 

 

 

 

Cooling Water System

PI 01

1-2.5 bar

 

0.4 bar + (B)

 

 

Press. LT-system, inlet engine

PAL 01

 

 

PI 10

1-3.0 bar

0.4 bar + (B)

 

 

Press. HT-system, inlet engine

PAL 10

 

 

TI 10

60-75° C

 

 

 

Temp. HT-system, inlet engine

 

 

 

 

TI 11

70-85° C

 

 

 

 

Temp. HT-system, outl. cyl.

 

 

 

 

 

 

 

 

 

 

units

 

 

 

TAH 12

90° C

TSH 12

95° C

Temp. HT-system, outlet

 

max. 10° C

 

 

 

 

 

 

 

 

engine

 

 

 

 

 

 

 

Temp. raise across cyl. units

 

 

 

 

 

 

Exhaust Gas and Charge Air

TI 62

425-475° C

TAH 62

500° C

 

 

 

 

average ±50° C

 

 

Exh. gas temp. before TC

 

 

TDAH 60

 

 

TI 61

275-350° C*

500° C

 

 

Exh. gas temp. outlet cyl.

TAH 61

 

 

TI 61

320-390° C**

 

 

 

Exh. gastemp. after TC

 

 

 

 

PI 31

2-2.5 bar

 

 

 

 

 

 

 

 

 

 

Ch. air press. after cooler

TI 31

35-55° C

TAH 31

65° C (C)

 

 

 

 

 

 

 

Ch. air temp. after cooler

 

 

 

 

 

 

Compressed Air System

PI 70

7-9 bar

PAL 70

7 bar

 

 

 

 

 

 

 

Press. inlet engine

 

 

 

 

 

 

 

Speed Control System

SI 90

720 rpm

SAH 81

820 rpm

SSH 81

820 rpm

SI 90

750 rpm

855 rpm

SSH 81

855 rpm

Engine speed

 

SAH 81

 

SI 90

900 rpm

1015 rpm

SSH 81

1015 rpm

Engine speed

 

SAH 81

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Engine speed

Specific plants will not comprise alarm equipment and autostop for all parameters listed above. For specific plants additional parameters can be included. For remarks to some parameters, see overleaf.

* for 720/750 rpm ** for 900 rpm.

96.02 - ES1U

500.30

Operation Data & Set Points

Description

Page 2 (2)

Edition 01H

 

L23/30H

Remarks to individual Parameters

A. Fuel Oil Pressure HFO-operation.

When operating on HFO, the system pressure must be sufficient to depress any tendency to gasification of the hot fuel.

The system pressure has to be adjusted according to the fuel oil preheating temperature.

B. Cooling Water Pressure, Alarm Set Points.

As the system pressure, in case of pump failure, will depend on the height of the expansion tank above the engine, the alarm set point has to be adjusted to 0.4 bar plus the static pressure.

08028-0D/H5250/94.08.12