System Summary Information Window

The System Summary Information Windowis displayed after opening a new or existingSystem. For new Systems, this window is displayed after exiting theDescription Dialog Box. For existing Systems, this window is displayed upon opening the System.

Note: You cannot modify data directly in this window. Use the selections available on the System Menu to make adjustments to your system. Since the data on this window may be too big to fit on your screen, scroll bars are provided to allow your to view the entire window

The first three fields of this window contain description information which has been previously entered by the user. The remainder of the window contains the most recent system and project summary results. These results are computed from data entered by the user or from default values if data has not yet been entered.

The information displayed in the System Summary Information Window for a System may be customized based on your preferences. SeeDisplay Options Dialog Boxfor information on how to set your display preferences. The following shows theSystem Summary Information Windowwith the System Level Estimation Information description enabled. The information in this window includes:

Name

The name of the project being modeled

Prepared By

Your name

Description

A description of the project (this field scrolls to permit display of long descriptions)

Total Adj. Function Points

The total number of adjusted function points obtained from the summation of all the projects' adjusted function points

Total Source Lines of Code

The total number of source lines of code obtained from the summation of all the projects' source lines of code

Total Adj. Effort

The total number of adjusted effort obtained from the summation of all the projects' adjusted effort

Product Design

Cumulative time to develop in the product design phase

Project Number

Project Number as stored in the System

Programming

Cumulative time to develop in the programming phase

Integration & Test

Cumulative time to develop in the integration and test phase

Final Test & Eval.

Cumulative time to develop in the final test and evaluation phase

Total Time to Develop

Total time to develop the system in calendar months

System Manpower Buildup Index (MBI) Level

System MBI level number

Project Summary Information

Each project's adjusted function points, source lines of code, programming effort, integration and test effort, programming TDEV, integration and test TDEV, and MBI level.

System Level Estimation Projects Dialog Box

The System Level Estimation Projects Dialog Box is displayed after you select theProjectsoption from theSystem Menu.

The Start Time Adjustment in months can be entered via this dialog box.

Select the Addbutton to add projects to the System or select theDelete button to delete projects from the System. Selecting eitherOKorCancelremoves this dialog box. SelectOKto save your changes or selectCancelto disregard your changes.