
Хорошев / ИЛП_материал_маг_02.15 / DEF STAN 00-60 / Issue 4 / Part 0 - Annex C - Data dictionary and related technical inf
.pdf
DEF STAN 00-60 (PART 0)/4
ANNEX C
|
|
|
|
|
|
|
|
End Item Acronym |
|
|
Modelling Data |
|
|
||
|
|
|
|
|
|
|
|
End Item Acronym Code |
|
Modelling Service |
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
Designator Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Modelling Operations and |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Maintenance Level Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
XA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AI |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LCN Indentured Item |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LSA Control Number |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(LCN) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Alternate LCN Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LCN Type |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
XB |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
System/End Item |
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
Interoperability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Requirement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interoperable Item Name |
|
|
|
|
|
||
|
|
XC |
|
|
|
|
|
Interoperable item |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Number Type |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
System/End Item |
|
|
|
|
|
|
|
|
Operations and |
|
|
||
|
|
Narrative |
|
|
Reliability Requirement |
|
AH |
|
Maintenance Requirement |
|
|
||||
|
|
System/End Item |
|
|
Annual Operating |
|
|
|
Service Designator Code |
|
|
||||
|
|
Narrative Code |
|
|
Requirement |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
Measurement Base |
|
|
|
|
|
|
|
||
|
|
System /End Item Text |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sequencing Code |
|
|
|
|
AG |
|
|
|
|
AA |
|
|
|
Operations/Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Level Transportation |
|
AK |
|
|
|
|
|
|
|
||||||
Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Operations/Maintenance |
|
|
|
|
|
|
|
|
|
War/Peace Operations |
|
|
|||
Level From |
|
|
|
|
|
|
|
|
|
and Maintenance Reqmt |
|
Skill Speciality |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
Operations/Maintenance |
|
|
|
|
|
|
|
|
|
Operational Requirement |
|
Skill Speciality Code |
|||
Level To |
|
|
|
|
|
|
|
|
|
Indicator |
|
|
|||
|
|
AJ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AB |
|
GA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
War/Peace Additional
Requirement Narrative
Additional Requirements
Text Sequencing Code
Operations/Maintenance
Level Requirement
Operations and
Maintenance Level Code
AF |
|
|
AC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Organization Level |
|
Skill Operations and |
||
|
|
Requirements |
|
Maintenance Requirement |
||
|
|
|
AD |
|
|
AE |
Figure 7 A Table Relationships
C-21
DEF STAN 00-60 (PART 0)/4
ANNEX C
C.5.1 Table AA, Operations and Maintenance Requirement. This Table identifies operations, maintenance, and reliability requirements for the new system/equipment by the service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), and Service Designator Code (SERDESAA). For a given row of information, Percentile (PERCENAA) is not allowed without a Maximum Time To Repair (MAXTTRAA).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X |
L |
- |
096 |
F |
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
K |
MAXTTRAA |
REQUIRED MAXIMUM TIME TO REPAIR |
5 |
N |
R |
2 |
222 |
|
PERCENAA |
REQUIRED PERCENTILE |
2 |
N |
F |
- |
286 |
|
ACHAVAAA |
REQUIRED ACHIEVED AVAILABILITY |
8 |
N |
R |
6 |
001 |
|
INHAVAAA |
REQUIRED INHERENT AVAILABILITY |
8 |
N |
R |
6 |
164 |
|
OMAMDTAA |
OPERATIONAL MAMDT |
6 |
N |
R |
1 |
223 |
|
TMAMDTAA |
TECHNICAL MAMDT |
6 |
N |
R |
1 |
223 |
|
OPMTTRAA |
REQUIRED OPERATIONAL MTTR |
5 |
N |
R |
2 |
236 |
|
TEMTTRAA |
REQUIRED TECHNICAL MTTR |
5 |
N |
R |
2 |
236 |
|
NUOPLOAA |
NUMBER OF OPERATING LOCATIONS |
4 |
N |
R |
- |
262 |
|
CREWSZAA |
CREW SIZE |
4 |
N |
R |
- |
064 |
|
TOSYSUAA |
TOTAL SYSTEMS SUPPORTED |
6 |
N |
R |
- |
454 |
|
RCMLOGAA |
RCM LOGIC UTILIZED |
32 |
X |
- |
- |
345 |
|
C.5.2 Table AB, War/Peace Operations and Maintenance Requirement. This Table identifies operations/maintenance (O/M) requirements for the new system/equipment based on its projected wartime and peacetime missions for a given service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), and Operational Requirement Indicator (OPRQINAB). For a given row, Mean Mission Duration (MMISDUAB) and Mean Mission Duration Measurement Base (MMISDMAB) shall either both be blank, or both have entries.
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N F |
- |
019 |
F |
|
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
K |
ANNOMIAB |
ANNUAL NUMBER OF MISSIONS |
6 |
N R |
- |
021 |
|
|
ANOPDAAB |
ANNUAL OPERATING DAYS |
3 |
N R |
- |
022 |
|
|
ANOPTIAB |
ANNUAL OPERATING TIME |
4 |
N |
R |
- |
024 |
|
MMISDUAB |
MEAN MISSION DURATION |
6 |
N R |
1 |
228 |
|
|
MMISDMAB |
MEAN MISSION DURATION MEASUREMENT BASE |
1 |
A F |
- |
238 |
|
C-22
|
DEF STAN 00-60 (PART 0)/4 |
|||||
|
ANNEX C |
|
|
|
|
|
OPAVAIAB |
REQUIRED OPERATIONAL AVAILABILITY |
8 |
N |
R |
6 |
273 |
OPALDTAB |
REQUIRED ADMINISTRATIVE AND LOGISTIC DELAY |
3 |
N |
R |
- |
013 |
|
TIME |
|
|
|
|
|
OSTBTIAB |
REQUIRED STANDBY TIME |
4 |
N |
R |
- |
403 |
C.5.3 Table AC, Operations/Maintenance Level Requirement. This Table identifies O/M requirements for the new system/equipment by O/M level, wartime/peacetime scenario, and service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), Operational Requirement Indicator (OPRQINAB), and O/M Level Code (OMLVLCAC). For a given row, Maintenance Level Percentile (MLPERCAC) is not allowed without a Maintenance Level Maximum Time to Repair (MLMTTRAC).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N F |
- |
019 |
F |
|
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
F |
OMLVLCAC |
OPERATIONS/MAINTENANCE LEVEL CODE |
1 |
A F |
- |
277 |
K |
|
MLMTTRAC |
MAINTENANCE LEVEL MAXIMUM TIME TO REPAIR |
5 |
N R |
2 |
222 |
|
|
MLPERCAC |
MAINTENANCE LEVEL PERCENTILE |
2 |
N |
F |
- |
286 |
|
MLNSSUAC |
NUMBER OF SYSTEMS SUPPORTED |
6 |
N R |
- |
265 |
|
|
MLSAMHAC |
MAINTENANCE LEVEL SCHEDULED ANNUAL MAN- |
6 |
N R |
1 |
020 |
|
|
|
HOURS |
|
|
|
|
|
|
MLUAMHAC |
MAINTENANCE LEVEL UNSCHEDULED ANNUAL MAN- |
6 |
N R |
1 |
020 |
|
|
|
HOURS |
|
|
|
|
|
|
MLSMHOAC |
SCHEDULED MAN-HOUR PER OPERATING HOUR |
8 |
N R |
5 |
215 |
|
|
MLUMHOAC |
UNSCHEDULED MAN-HOUR PER OPERATING HOUR |
8 |
N R |
5 |
215 |
|
|
MLUMETAC |
UNSCHEDULED MAINTENANCE MEAN ELAPSED TIME |
5 |
N R |
2 |
499 |
|
|
MLUMMHAC |
UNSCHEDULED MAINTENANCE MEAN MAN-HOURS |
5 |
N R |
2 |
499 |
|
C.5.4 Table AD, Organizational Level Requirement. This Table identifies organizational O/M level requirements for the new system/equipment by wartime/peacetime scenario, O/M level, and service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), Operational Requirement Indicator (OPRQINAB), and O/M Level Code (OMLVLCAC). For a given row, only ‘C’ and ‘O’ for the O/M Level Code (OMLVLCAC) are allowed for this Table.
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N F |
- |
019 |
F |
|
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
F |
C-23
DEF STAN 00-60 (PART 0)/4
ANNEX C
OMLVLCAC |
OPERATIONS/MAINTENANCE LEVEL CODE |
1 |
A F |
- |
277 |
F |
|
DINMETAD |
DAILY INSPECTION MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
|
DINMMHAD |
DAILY INSPECTION MEAN MAN-HOURS |
5 |
N R |
2 |
280 |
|
|
PREMETAD |
PRE-OPERATIVE INSPECTION MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
|
PREMMHAD |
PRE-OPERATIVE INSPECTION MEAN MAN-HOURS |
5 |
N R |
2 |
280 |
|
|
POIMETAD |
POSTOPERATIVE INSPECTION MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
|
POIMMHAD |
POSTOPERATIVE INSPECTION MEAN MAN-HOURS |
5 |
N R |
2 |
280 |
|
|
PINMETAD |
PERIODIC INSPECTION MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
|
PINMMHAD |
PERIODIC INSPECTION MEAN MAN-HOURS |
5 |
N R |
2 |
280 |
|
|
MPCMETAD |
MISSION PROFILE CHANGE MEAN ELAPSED TIME |
5 |
N R |
2 |
280 |
|
|
MPCMMHAD |
MISSION PROFILE CHANGE MEAN MAN-HOURS |
5 |
N R |
2 |
280 |
|
|
TINMETAD |
TURNROUND INSPECTION MEAN ELAPSED TIME |
5 |
N R |
2 |
280 |
|
|
TINMMHAD |
TURNROUND INSPECTION MEAN MAN-HOURS |
5 |
N R |
2 |
280 |
|
C.5.5 Table AE, Skill Operations and Maintenance Requirement. This Table identifies operational maintenance manpower constraints by SSC at specific O/M levels given a wartime/peacetime scenario and service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), Operational Requirement Indicator (OPRQINAB), O/M Level Code (OMLVLCAC), and SSC (SKSPCDGA).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N F |
- |
019 |
F |
|
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
F |
OMLVLCAC |
OPERATIONS/MAINTENANCE LEVEL CODE |
1 |
A F |
- |
277 |
F |
|
SKSPCDGA |
SKILL SPECIALITY CODE (SSC) |
9 |
X |
L |
- |
387 |
F |
AVAIMHAE |
AVAILABLE ANNUAL MAN-HOURS |
6 |
N R |
- |
028 |
|
|
QTYAVAAE |
QUANTITY SKILL SPECIALITY CODE AVAILABLE |
5 |
N |
R |
- |
324 |
|
UTRATIAE |
UTILIZATION RATIO |
3 |
N |
R |
2 |
503 |
|
C.5.6 Table AF, War/Peace Additional Requirements Narrative. This is a narrative Table which identifies the additional O/M level requirements for the new system/equipment by wartime/peacetime and service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), Operational Requirement Indicator (OPRQINAB), and Additional Requirements Text Sequencing Code (TEXSEQAF).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N F |
- |
019 |
F |
|
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
C-24
DEF STAN 00-60 (PART 0)/4
ANNEX C
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
F |
TEXSEQAF |
ADDITIONAL REQUIREMENTS TSC |
5 |
N |
R |
- |
450 |
K |
WPADDRAF |
ADDITIONAL SPECIFICATIONS/REQUIREMENTS |
65 |
X |
- |
- |
009 |
|
C.5.7 Table AG, Reliability Requirement. This Table identifies reliability requirement parameters for the new system/equipment that are dependent on measurement base (MB). There can be multiple tables depending upon the annual operating requirements (AOR) MB. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), and AOR MB (MEASBSAG). Reliability Operational Requirements Indicator (OPRQINAG) shall match Operational Requirements Indicator (OPRQINAB) in Table AB for the given keys.
NOTE: If Required Operational Mean Time Between Failures (OPMTBFAG) and Required Technical Mean Time Between Failures (TEMTBFAG) are entered, in Table HK, Reason for Selection (DED 668) should not be ‘0’ and in Table HA, Spare Parts Classification (DED 684) should be ‘2’ or ‘6’.
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X |
L |
- |
096 |
F |
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
MEASBSAG |
ANNUAL OPERATING REQUIREMENT MEASUREMENT |
1 |
A |
F |
- |
238 |
K |
|
BASE |
|
|
|
|
|
|
ANOPREAG |
ANNUAL OPERATING REQUIREMENT |
6 |
N |
R |
- |
023 |
M |
OPRQINAG |
RELIABILITY OPERATIONAL REQUIREMENTS |
1 |
A |
F |
- |
275 |
M |
|
INDICATOR |
|
|
|
|
|
|
OPMTBFAG |
REQUIRED OPERATIONAL MTBF |
10 |
D |
- |
- |
229 |
|
TEMTBFAG |
REQUIRED TECHNICAL MTBF |
10 |
D |
- |
- |
229 |
|
OPMRBMAG |
REQUIRED OPERATIONAL MTBMA |
10 |
D |
- |
- |
230 |
|
TMTBMAAG |
REQUIRED TECHNICAL MTBMA |
10 |
D |
- |
- |
230 |
|
MTBRXXAG |
REQUIRED MEAN TIME BETWEEN REMOVALS |
10 |
D |
- |
- |
235 |
|
C.5.8 Table AH, Interoperability Requirement. This Table identifies item name, NATO stock number (NSN), and the technical manual (TM) of the system/equipment with which the new system/equipment shall be able to be transported by/interoperate with. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Interoperable Item Name (IONAMEAH), and Interoperable Item Number Type (IOINTYAH). For a given row of information, the following cross-element edits apply to Table AH:
(a)Interoperable CAGE code (IOCAGEAH) and Interoperable Reference Number (IOREFNAH) shall either both be blank, or both have entries.
(b)Interoperable Item National Item Identification Number (IONIINAH) and Interoperable Item NSN NATO Supply Classification (IONFSCAH) shall either both be blank, or both have entries.
C-25
DEF STAN 00-60 (PART 0)/4
ANNEX C
NOTE: If Interoperable Item National Item Identification Number (IONIINAH) and Interoperable Item NSN NATO Supply Classification (IONFSCAH) are entered, Reason For Selection (DED 668) in Table HK should not be ‘0’.
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N F |
- |
019 |
F |
|
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
IONAMEAH |
INTEROPERABLE ITEM NAME |
19 |
X L |
- |
182 |
K |
|
IOINTYAH |
ITEM INTEROPERABILITY CODE |
1 |
A |
F |
- |
266 |
K |
IOCAGEAH |
INTEROPERABLE CAGE CODE |
5 |
X |
F |
- |
046 |
|
IOREFNAH |
INTEROPERABLE REFERENCE NUMBER |
32 |
X |
L |
- |
337 |
|
IONIINAH |
INTEROPERABLE ITEM NATIONAL ITEM |
9 |
N |
F |
- |
253 |
|
|
IDENTIFICATION NUMBER |
|
|
|
|
|
|
IONFSCAH |
INTEROPERABLE ITEM NSN NATO SUPPLY |
4 |
N |
F |
- |
253 |
|
|
CLASSIFICATION |
|
|
|
|
|
|
IOITNMAH |
INTEROPERABLE ITEM TECHNICAL MANUAL NUMBER |
30 |
X L |
- |
440 |
|
C.5.9 Table AI, Modelling Data. This Table documents maintenance level specific information, for a given service designator code, to be used for LSA modelling. Table keys consist of EIAC (EIACODXA), Modelling Service Designator Code (SERDESAI), and Modelling O/M Level Code (OMLVLCAI). For a given row of information, the following cross-element edits apply to Table AI:
(a)Labour Rate (LABRATAI) and Labour Rate Currency Code (LRTCCDAI) shall either both be blank, or both have entries.
(b)Repair Work Space Cost (RPWSCSAI) and Repair Work Space Cost Currency Code (RWCCCDAI) shall either both be blank, or both have entries.
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X |
L |
- |
096 |
F |
SERDESAI |
MODELLING SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
K |
OMLVLCAI |
MODELLING OPERATIONS/MAINTENANCE LEVEL CODE |
1 |
A |
F |
- |
277 |
K |
LABRATAI |
LABOUR RATE |
4 |
N |
R |
2 |
189 |
|
LRTCCDAI |
LABOUR RATE CURRENCY CODE |
3 |
X |
- |
- |
629 |
|
NOSHPSAI |
NUMBER OF SHOPS |
2 |
N |
R |
- |
263 |
|
RPWSCSAI |
REPAIR WORKSPACE COST |
4 |
N |
R |
2 |
352 |
|
RWCCCDAI |
REPAIR WORK SPACE COST CURRENCY CODE |
3 |
X |
- |
- |
629 |
|
RQDSTKAI |
REQUIRED DAYS OF STOCK |
3 |
N |
R |
- |
357 |
|
C.5.10 Table AJ, Operations/Maintenance Level Transportation Requirement. This Table identifies the O/M level from which a spare/repair part is shipped and the O/M level which receives the part. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), O/M level from (OMLVLFAJ), O/M level to (OMLVLTAJ).
C-26
|
|
DEF STAN 00-60 (PART 0)/4 |
|||||
|
|
ANNEX C |
|
|
|
|
|
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N F |
- |
019 |
F |
|
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
OMLVLFAJ |
OPERATIONS/MAINTENANCE LEVEL FROM |
1 |
A F |
- |
277 |
K |
|
OMLVLTAJ |
OPERATIONS/MAINTENANCE LEVEL TO |
1 |
A |
F |
- |
277 |
K |
SHPDISAJ |
TRANSPORTATION DISTANCE |
4 |
N |
R |
- |
085 |
|
TIMESHAJ |
TRANSPORTATION TIME |
3 |
N |
R |
- |
379 |
|
C.5.11 Table AK, System/End Item Narrative. This Table may be used to identify additional supportability considerations, additional supportability parameters, and operational mission failure definition. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), System/EI Narrative Code (SEINCDAK), and System/EI Narrative Text Sequencing Code (TEXSEQAK). For a given row of information, the following cross-element edits apply to Table AK:
(a)If the System/EI Narrative Code (SEINCDAK) is ‘B’, then this Table provides a narrative description of additional supportability considerations for the item under analysis (Additional Supportability Considerations, DED 010).
(b)If the System/EI Narrative Code (SEINCDAK) is ‘A’, then this Table describes additional supportability parameters which will specify data elements and associated data when discrete fields are not provided (Additional Supportability Parameters, DED 011).
(c)If the System/EI Narrative Code (SEINCDAK) is ‘C’, then this Table provides a narrative of the guidelines to be followed when defining operational mission failures (Operational Mission Failure Definition, DED 274).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X |
L |
- |
096 |
F |
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SEINCDAK |
SYSTEM/END ITEM NARRATIVE CODE |
1 |
A |
F |
- |
424 |
K |
TEXSEQAK |
SYSTEM END ITEM NARRATIVE TSC |
5 |
N |
R |
- |
450 |
K |
SEINARAK |
SYSTEM END ITEM NARRATIVE |
65 |
X |
- |
- |
--- |
|
C-27
DEF STAN 00-60 (PART 0)/4
ANNEX C
C.6 Item Reliability, Availability, and Maintainability Characteristics; Failure Modes Effects and Criticality Analysis; and, Maintainability Analysis
Data Tables beginning with ‘B’ in the first position of the Table Code are structured to provide a description of the function of each LSA candidate item (CI) of the system/end item; outline the maintenance concept to be utilized for design and support planning purposes; and, identify any design conditions such as fail safe requirements/environmental or nuclear hardness considerations imposed upon the system/end item. The Tables summarize the CI reliability, maintainability, and related availability characteristics, resulting from the failure modes and effects, criticality, and maintainability analyses, and accommodate a narrative description of any analysis related to the potential redesign of an item. Figure 8 depicts the relational hierarchy of these Tables/entities.
TABLE CODE |
TABLE TITLE |
BA |
Reliability, Availability, and Maintainability Characteristics |
BB |
Reliability, Availability, and Maintainability Characteristics Narrative |
BC |
Reliability, Availability, and Maintainability Logistics Considerations |
BD |
Reliability, Availability, and Maintainability Indicator Characteristics |
BE |
War/Peace Reliability, Availability, and Maintainability Indicator |
|
Characteristics |
BF |
Failure Mode and Reliability-Centred Maintenance Analysis |
BG |
Failure Mode and Reliability-Centred Maintenance Narrative |
BH |
Failure Mode Task |
BI |
Failure Mode Indicator Mission Phase Code Characteristics |
BJ |
Failure Mode Indicator Mission Phase Code Characteristics Narrative |
BK |
Reliability, Availability, and Maintainability Criticality |
BL |
Mission Phase Operational Mode |
C-28

|
|
|
|
|
|
|
End Item Acronym |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
End Item Acronym Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
XA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LCN Indentured Item |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LSA Control Number (LCN) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Alternate LCN Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LCN - Type |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
XB |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Reliability, Availability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
and Maintainability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Characteristics |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Reliability, Availability and |
|
|
Reliability, Availability and |
|
|
|
|
Failure Mode and |
|
|
Reliability, Availability and |
|
Mission Phase |
|
|||||||||
|
|
|
Maintainability Logistics |
|
|
Maintainability Indicator |
|
|
|
|
Reliability-Centred |
|
|
Maintainability Criticality |
|
Operational Mode |
|
|||||||||
|
|
|
Considerations |
|
|
Characteristics |
|
|
|
|
Maintenance Analysis |
|
|
RAM Safety Hazard |
|
Mission Phase Code |
|
|||||||||
|
|
|
Logistics Considerations |
|
|
RAM Indicator Code |
|
|
|
|
Failure Mode Indicator |
|
|
Severity Code |
|
|
|
|
||||||||
|
|
|
Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BD |
|
|
|
|
|
|
|
BF |
|
|
|
|
|
BK |
|
|
BL |
|
|
|
|
RAM Logistics |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Considerations Text |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sequencing Code |
|
|
War/Peace Reliability, |
|
Failure Mode and |
|
|
|
|
|
|
Failure Mode Indicator |
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
Reliability, Availability and |
|
BC |
|
Availability and |
|
Reliability-Centred |
|
|
|
|
|
Mission Phase Code |
|
|
|
|
|
||||||||
|
Maintainability |
|
|
|
Maintainability Indicator |
|
Maintenance Narrative |
|
|
|
|
|
Characteristics |
|
|
|
|
|
||||||||
|
Characteristics Narrative |
|
|
|
Characteristics |
|
Failure Mode and RCM |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
RAM Characteristics |
|
|
|
Operational Requirement |
|
Narrative Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
Narrative Code |
|
|
|
Indicator |
|
|
|
|
|
|
|
|
|
|
|
|
BI |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
Failure Mode Narrative |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
RAM Characteristics |
|
|
|
|
BE |
|
Text Sequencing Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
Narrative Text |
|
|
|
|
|
|
|
BG |
|
|
|
|
|
Failure Mode Indicator |
|
|
|
|
|
||||||
|
Sequencing Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mission Phase Code |
|
|
|
|
|
|||||
|
|
|
BB |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Characteristics Narrative |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Failure Mode Indicator |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
Task Requirements |
|
|
|
Mission Phase |
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
End Item Acronym Code |
|
|
|
Characteristics Narrative |
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
LSA Control Number (LCN) |
|
|
|
Code |
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
Alternate LCN Code |
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
LCN - Type |
|
|
|
Failure Mode Indicator |
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
Task Code |
|
|
|
Mission Phase |
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CA |
|
|
|
Characteristics Narrative |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Text Sequencing Code |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BJ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Failure Mode Task |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BH |
|
|
|
|
|
|
|
|
|
|
Figure 8 B Table Relationships
DEF STAN 00-60 (PART 0)/4
ANNEX C
C.6.1 Table BA, Reliability, Availability, and Maintainability Characteristics. This Table contains logistics considerations, maintenance, and reliability characteristics of the CI under analysis. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), and LCN Type (LCNTYPXB). For a given row of information, the following cross-element edits apply to Table BA:
(a)The RAM area can only be used if a ‘Y’ is entered in the RAM Indicator (RAMINDXB) Table XB.
(b)Fault Isolation Percent Failure Group 1 (FIPFGABA) is not allowed without Fault Isolation Ambiguity Group 1 (FIAMBABA).
(c)The combination in (b) is not allowed without Built in Test (BIT) Detection Level Percent group 1 (BDLPGABA).
(d)That which applies for the combinations in Group 1 (b, c) also applies to the combination in group 2.
(e)Wearout Life (WEOULIBA) and Wearout Life MB (WOLIMBBA) shall either both be blank, or both have entries.
(f)Authorized Life (AUTLIFBA) and Authorized Life MB (AUTLMBBA) shall either both be blank, or both have entries.
(g)Maintenance Concept Option 2 (MNTOP2BA) shall not be entered without a corresponding Maintenance Concept Option 1 (MNTOP1BA).
(h)Maintenance Concept Option 3 (MNTOP3BA) shall not be entered without corresponding Maintenance Concept Options 1 and 2 (MNTOP1BA and MNTOP2BA).
(i)Maintenance Concept Cost 1 (MNTCC1BA) shall not be entered without a corresponding Maintenance Concept Option 1 (MNTOP1BA).
(j)Maintenance Concept Cost 2 (MNTCC2BA) shall not be entered without a corresponding Maintenance Concept Option 2 (MNTOP2BA).
(k)Maintenance Concept Cost 3 (MNTCC3BA) shall not be entered without a corresponding Maintenance Concept Option 3 (MNTOP3BA).
(l)Maintenance Concept Costs 1, 2 or 3 (MNTCC1BA, MNTCC2BA or MNTCC3BA) if entered shall have a corresponding entry in Maintenance Concept Cost Currency Code (MCCCCDBA).
NOTE: If Authorized Life (AUTLIFBA) is entered, in Table HK, Reason for Selection (DED 668) should not be ‘0’.
C-30