- •Preface
- •0 Introduction
- •1 Scope
- •2 Related Documents
- •3 Definitions
- •4 Policy
- •Section Two. The Purpose and Scope of Def Stan 00-60
- •5 Purpose
- •6 Scope of Def Stan 00-60
- •Section Three. Defence Equipment Acquisition and Materiel Support (DEAMS)
- •7 Business Overview
- •8 Contracting Environment
- •9 Programme and Timing
- •10 Process Integration and Data Management
- •11 Introduction
- •12 ILS Principal Elements
- •13 Additional ILS Elements
- •Section Five. Data Management
- •14 Introduction
- •15 Data Dictionary
- •16 LSAR Relational Tables Business Rules and Reports
- •17 SGML
- •Section 6. Management of Defence Standard 00-60 Maintenance
- •19 Introduction
- •20 Change Procedure
- •21 Defence Standard 00-60 Help Desk
- •Figure 3 Defence Standard 00-60 Change Procedure
- •Figure 6 X Table Relationships
- •Figure 7 A Table Relationships
- •Figure 8 B Table Relationships
- •Figure 9 C Table Relationships
- •Figure 10 E Table Relationships
- •Figure 11 U Table Relationships
- •Figure 12 F Table Relationships
- •Figure 13 G Table Relationships
- •Figure 14 H Table Relationships
- •Figure 15 J Table Relationships
- •Figure 16 Z Table Relationships
- •Figure 17 LSAR Data Tables to Report Matrix
- •Figure 18 LSA-001 summary
- •Figure 19 LSA-003 summary
- •Figure 20 LSA-004 summary
- •Figure 21 LSA-005 summary
- •Figure 22 LSA-006 summary
- •Figure 23 LSA-007 summary
- •Figure 24 LSA-008 summary
- •Figure 25 LSA-009 summary
- •Figure 26 LSA-010 summary
- •Figure 27 LSA-011 summary
- •Figure 28 LSA-012 summary
- •Figure 29 LSA-013 summary
- •Figure 30 LSA-014 summary
- •Figure 31 LSA-016 summary
- •Figure 32 LSA-018 summary
- •Figure 33 LSA-019 summary
- •Figure 34 LSA-023 summary
- •Figure 35 LSA-024 summary
- •Figure 37 LSA-026 summary
- •Figure 38 LSA-027 summary
- •Figure 39 LSA-030 (Option 1) summary
- •Figure 40 LSA-033 summary
- •Figure 41 LSA-036 summary
- •Figure 42 LSA-037 summary
- •Figure 43 LSA-039 summary
- •Figure 44 LSA-040 summary
- •Figure 45 LSA-046 summary
- •Figure 46 LSA-050 summary
- •Figure 47 LSA-056 summary
- •Figure 48 LSA-058 summary
- •Figure 49 LSA-065 summary
- •Figure 50 LSA-070 summary
- •Figure 51 LSA-071 summary
- •Figure 52 LSA-072 summary
- •Figure 53 LSA-074 summary
- •Figure 54 LSA-075 summary
- •Figure 55 LSA-076 summary
- •Figure 56 LSA-077 summary
- •Figure 57 LSA-078 summary
- •Figure 58 LSA-080 summary
- •Figure 59 LSA-085 summary
- •Figure 60 LSA-126 summary
- •Figure 61 LSA-151 summary
- •Figure 62 LSA-152 summary
- •Figure 63 LSA-154 summary
- •Figure 64 LSA-155 summary
- •Figure 65 LSA-602 summary
- •Figure 66 LSA-604 summary
- •Figure 67 LSA-606 summary
- •Figure 68 LSA-608 summary
- •Figure 69 LSA-610 summary
- •Figure 70 LSA-612 summary
- •Figure 71 LSA-614 summary
- •Figure 72 LSA-624 summary
- •Figure 73 LSA-626 summary
- •Figure 74 LSA-628 summary
- •Figure 77 LSA-634 summary
- •Figure 78 LSA-636 summary
- •Figure 79 LSA-648 summary
- •Figure 80 LSA-650 summary
- •Figure 81 LSA-652 summary
- •Figure 82 LSA-654 summary
- •Figure 85 LSA-660 summary
- •Figure 86 LSA-662 summary
- •Figure 87 LSA-664 summary
- •Figure 88 LSA-668 summary
- •Figure 89 LSA-672 summary
- •Figure 90 LSA-674 summary
- •Figure 91 LSA-676 summary
- •Introduction
- •Logistic Support Analysis Record Relational Tables

DEF STAN 00-60 (PART 0)/3 ANNEX C (CONTINUED)
End Item Acronym
End Item Acronym Code
XA
LCN Indentured Item
LSA Control Number LCN
Alternate LCN Code
LCN - Type
Modelling Data
Modelling Service
Designator Code
Modelling Operations and
Maintenance Level Code
AI
|
|
|
|
|
|
|
|
|
|
XB |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
System End Item |
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
Interoperability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Requirement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interoperable Item Name |
|
|
|
|
|
||
|
|
XC |
|
|
|
|
|
Interoperable item |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Number Type |
|
|
|
|
|
|
|
|
|
System End Item |
|
|
|
|
|
|
|
|
Operations and |
|
|
||
|
|
Narrative |
|
|
Reliability Requirement |
|
AH |
|
Maintenance Requirement |
|
|
||||
|
|
System End Item |
|
|
Annual Operating |
|
|
|
Service Designator Code |
|
|
||||
|
|
Narrative Code |
|
|
Requirement |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
Measurement Base |
|
|
|
|
|
|
|
||
|
|
System /End Item Text |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sequencing Code |
|
|
|
|
AG |
|
|
|
|
AA |
|
|
|
Operations/Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Level Transportation |
|
AK |
|
|
|
|
|
|
|
||||||
Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operations Maintenance |
|
|
|
|
|
|
|
|
|
War/Peace Operations |
|
|
|||
Level From |
|
|
|
|
|
|
|
|
|
|
and Maintenance Reqmt |
|
Skill Speciality |
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operational Requirement |
|
Skill Speciality Code |
|
Operations Maintenance |
|
|
|
|
|
|
|
|
|
Indicator |
|
|
|||
Level To |
AJ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AB |
|
GA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
War/Peace Additional
Requirement Narrative
Additional Requirements
Text Sequencing Code
Operations/Maintenance
Level Requirement
Operations and
Maintenance Level Code
AF |
|
|
AC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Organization Level |
|
Skill Operations and |
||
|
|
Requirements |
|
Maintenance Requirement |
||
|
|
|
AD |
|
|
AE |
Figure 7 A Table Relationships
C-17
DEF STAN 00-60 (PART 0)/3
ANNEX C (CONTINUED)
C.5.1 Table AA, Operations and Maintenance Requirement. This Table identifies operations, maintenance, and reliability requirements for the new system/equipment by the service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), and Service Designator Code (SERDESAA). For a given row of information, Percentile (PERCENAA) is not allowed without a Maximum Time To Repair (MAXTTRAA).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X |
L |
- |
096 |
F |
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
K |
MAXTTRAA |
REQUIRED MAXIMUM TIME TO REPAIR |
5 |
N |
R |
2 |
222 |
|
PERCENAA |
REQUIRED PERCENTILE |
2 |
N |
F |
- |
286 |
|
ACHAVAAA |
REQUIRED ACHIEVED AVAILABILITY |
8 |
N |
R |
6 |
001 |
|
INHAVAAA |
REQUIRED INHERENT AVAILABILITY |
8 |
N |
R |
6 |
164 |
|
OMAMDTAA |
OPERATIONAL MAMDT |
6 |
N |
R |
1 |
223 |
|
TMAMDTAA |
TECHNICAL MAMDT |
6 |
N |
R |
1 |
223 |
|
OPMTTRAA |
REQUIRED OPERATIONAL MTTR |
5 |
N |
R |
2 |
236 |
|
TEMTTRAA |
REQUIRED TECHNICAL MTTR |
5 |
N |
R |
2 |
236 |
|
NUOPLOAA |
NUMBER OF OPERATING LOCATIONS |
4 |
N |
R |
- |
262 |
|
CREWSZAA |
CREW SIZE |
4 |
N |
R |
- |
064 |
|
TOSYSUAA |
TOTAL SYSTEMS SUPPORTED |
6 |
N |
R |
- |
454 |
|
RCMLOGAA |
RCM LOGIC UTILIZED |
32 |
X |
- |
- |
345 |
|
C.5.2 Table AB, War/Peace Operations and Maintenance Requirement. This Table identifies operations/maintenance (O/M) requirements for the new system/equipment based on its projected wartime and peacetime missions for a given service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), and Operational Requirement Indicator (OPRQINAB). For a given row, Mean Mission Duration (MMISDUAB) and Mean Mission Duration Measurement Base (MMISDMAB) shall either both be blank, or both have entries.
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
K |
ANNOMIAB |
ANNUAL NUMBER OF MISSIONS |
6 |
N R |
- |
021 |
|
|
ANOPDAAB |
ANNUAL OPERATING DAYS |
3 |
N R |
- |
022 |
|
|
ANOPTIAB |
ANNUAL OPERATING TIME |
4 |
N |
R |
- |
024 |
|
MMISDUAB |
MEAN MISSION DURATION |
6 |
N R |
1 |
228 |
|
|
MMISDMAB |
MEAN MISSION DURATION MEASUREMENT BASE |
1 |
A F |
- |
238 |
|
|
OPAVAIAB |
REQUIRED OPERATIONAL AVAILABILITY |
8 |
N |
R |
6 |
273 |
|
C-18
DEF STAN 00-60 (PART 0)/3
ANNEX C (CONTINUED)
OPALDTAB |
REQUIRED ADMINISTRATIVE AND LOGISTIC DELAY |
3 |
N |
R |
- |
013 |
|
TIME |
|
|
|
|
|
OSTBTIAB |
REQUIRED STANDBY TIME |
4 |
N |
R |
- |
403 |
C.5.3 Table AC, Operations/Maintenance Level Requirement. This Table identifies O/M requirements for the new system/equipment by O/M level, wartime/peacetime scenario, and service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), Operational Requirement Indicator (OPRQINAB), and O/M Level Code (OMLVLCAC). For a given row, Maintenance Level Percentile (MLPERCAC) is not allowed without a Maintenance Level Maximum Time to Repair (MLMTTRAC).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
F |
OMLVLCAC |
OPERATIONS/MAINTENANCE LEVEL CODE |
1 |
A |
F |
- |
277 |
K |
MLMTTRAC |
MAINTENANCE LEVEL MAXIMUM TIME TO REPAIR |
5 |
N R |
2 |
222 |
|
|
MLPERCAC |
MAINTENANCE LEVEL PERCENTILE |
2 |
N |
F |
- |
286 |
|
MLNSSUAC |
NUMBER OF SYSTEMS SUPPORTED |
6 |
N R |
- |
265 |
|
|
MLSAMHAC |
MAINTENANCE LEVEL SCHEDULED ANNUAL MAN- |
6 |
N R |
1 |
020 |
|
|
|
HOURS |
|
|
|
|
|
|
MLUAMHAC |
MAINTENANCE LEVEL UNSCHEDULED ANNUAL MAN- |
6 |
N R |
1 |
020 |
|
|
|
HOURS |
|
|
|
|
|
|
MLSMHOAC |
SCHEDULED MAN-HOUR PER OPERATING HOUR |
8 |
N R |
5 |
215 |
|
|
MLUMHOAC |
UNSCHEDULED MAN-HOUR PER OPERATING HOUR |
8 |
N R |
5 |
215 |
|
|
MLUMETAC |
UNSCHEDULED MAINTENANCE MEAN ELAPSED TIME |
5 |
N R |
2 |
499 |
|
|
MLUMMHAC |
UNSCHEDULED MAINTENANCE MEAN MAN-HOURS |
5 |
N R |
2 |
499 |
|
C.5.4 Table AD, Organizational Level Requirement. This Table identifies organizational O/M level requirements for the new system/equipment by wartime/peacetime scenario, O/M level, and service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), Operational Requirement Indicator (OPRQINAB), and O/M Level Code (OMLVLCAC). For a given row, only ‘C’ and ‘O’ for the O/M Level Code (OMLVLCAC) are allowed for this Table.
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
F |
OMLVLCAC |
OPERATIONS/MAINTENANCE LEVEL CODE |
1 |
A |
F |
- |
277 |
F |
DINMETAD |
DAILY INSPECTION MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
|
C-19
DEF STAN 00-60 (PART 0)/3
ANNEX C (CONTINUED)
DINMMHAD |
DAILY INSPECTION MEAN MAN-HOURS |
5 |
N R |
2 |
280 |
|
PREMETAD |
PRE-OPERATIVE INSPECTION MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
PREMMHAD |
PRE-OPERATIVE INSPECTION MEAN MAN-HOURS |
5 |
N |
R |
2 |
280 |
POIMETAD |
POSTOPERATIVE INSPECTION MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
POIMMHAD |
POSTOPERATIVE INSPECTION MEAN MAN-HOURS |
5 |
N |
R |
2 |
280 |
PINMETAD |
PERIODIC INSPECTION MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
PINMMHAD |
PERIODIC INSPECTION MEAN MAN-HOURS |
5 |
N |
R |
2 |
280 |
MPCMETAD |
MISSION PROFILE CHANGE MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
MPCMMHAD |
MISSION PROFILE CHANGE MEAN MAN-HOURS |
5 |
N R |
2 |
280 |
|
TINMETAD |
TURNROUND INSPECTION MEAN ELAPSED TIME |
5 |
N |
R |
2 |
280 |
TINMMHAD |
TURNROUND INSPECTION MEAN MAN-HOURS |
5 |
N R |
2 |
280 |
C.5.5 Table AE, Skill Operations and Maintenance Requirement. This Table identifies operational maintenance manpower constraints by SSC at specific O/M levels given a wartime/peacetime scenario and service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), Operational Requirement Indicator (OPRQINAB), O/M Level Code (OMLVLCAC), and SSC (SKSPCDGA).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
F |
OMLVLCAC |
OPERATIONS/MAINTENANCE LEVEL CODE |
1 |
A |
F |
- |
277 |
F |
SKSPCDGA |
SKILL SPECIALITY CODE (SSC) |
9 |
X |
L |
- |
387 |
F |
AVAIMHAE |
AVAILABLE ANNUAL MAN-HOURS |
6 |
N R |
- |
028 |
|
|
QTYAVAAE |
QUANTITY SKILL SPECIALITY CODE AVAILABLE |
5 |
N |
R |
- |
324 |
|
UTRATIAE |
UTILIZATION RATIO |
3 |
N |
R |
2 |
503 |
|
C.5.6 Table AF, War/Peace Additional Requirements Narrative. This is a narrative Table which identifies the additional O/M level requirements for the new system/equipment by wartime/peacetime and service designator code. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Service Designator Code (SERDESAA), Operational Requirement Indicator (OPRQINAB), and Additional Requirements Text Sequencing Code (TEXSEQAF).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X |
L |
- |
096 |
F |
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SERDESAA |
SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
F |
OPRQINAB |
OPERATIONAL REQUIREMENT INDICATOR |
1 |
A |
F |
- |
275 |
F |
TEXSEQAF |
ADDITIONAL REQUIREMENTS TSC |
5 |
N |
R |
- |
450 |
K |
WPADDRAF |
ADDITIONAL SPECIFICATIONS/REQUIREMENTS |
65 |
X |
- |
- |
009 |
|
C-20
DEF STAN 00-60 (PART 0)/3
ANNEX C (CONTINUED)
C.5.7 Table AG, Reliability Requirement. This Table identifies reliability requirement parameters for the new system/equipment that are dependent on measurement base (MB). There can be multiple tables depending upon the annual operating requirements (AOR) MB. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), and AOR MB (MEASBSAG). Reliability Operational Requirements Indicator (OPRQINAG) shall match Operational Requirements Indicator (OPRQINAB) in Table AB for the given keys.
NOTE: If Required Operational Mean Time Between Failures (OPMTBFAG) and Required Technical Mean Time Between Failures (TEMTBFAG) are entered, in Table HK, Reason for Selection (DED 668) should not be ‘0’ and in Table HA, Spare Parts Classification (DED 684) should be ‘2’ or ‘6’.
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X |
L |
- |
096 |
F |
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
MEASBSAG |
ANNUAL OPERATING REQUIREMENT MEASUREMENT |
1 |
A |
F |
- |
238 |
K |
|
BASE |
|
|
|
|
|
|
ANOPREAG |
ANNUAL OPERATING REQUIREMENT |
6 |
N |
R |
- |
023 |
M |
OPRQINAG |
RELIABILITY OPERATIONAL REQUIREMENTS |
1 |
A |
F |
- |
275 |
M |
|
INDICATOR |
|
|
|
|
|
|
OPMTBFAG |
REQUIRED OPERATIONAL MTBF |
10 |
D |
- |
- |
229 |
|
TEMTBFAG |
REQUIRED TECHNICAL MTBF |
10 |
D |
- |
- |
229 |
|
OPMRBMAG |
REQUIRED OPERATIONAL MTBMA |
10 |
D |
- |
- |
230 |
|
TMTBMAAG |
REQUIRED TECHNICAL MTBMA |
10 |
D |
- |
- |
230 |
|
MTBRXXAG |
REQUIRED MEAN TIME BETWEEN REMOVALS |
10 |
D |
- |
- |
235 |
|
C.5.8 Table AH, Interoperability Requirement. This Table identifies item name, NATO stock number (NSN), and the technical manual (TM) of the system/equipment with which the new system/equipment shall be able to be transported by/interoperate with. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), Interoperable Item Name (IONAMEAH), and Interoperable Item Number Type (IOINTYAH). For a given row of information, the following cross-element edits apply to Table AH :
(a)Interoperable CAGE code (IOCAGEAH) and Interoperable Reference Number (IOREFNAH) shall either both be blank, or both have entries.
(b)Interoperable Item National Item Identification Number (IONIINAH) and Interoperable Item NSN NATO Supply Classification (IONFSCAH) shall either both be blank, or both have entries.
NOTE: If Interoperable Item National Item Identification Number (IONIINAH) and Interoperable Item NSN NATO Supply Classification (IONFSCAH) are entered, Reason For Selection (DED 668) in Table HK should not be ‘0’.
C-21
DEF STAN 00-60 (PART 0)/3
ANNEX C (CONTINUED)
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
IONAMEAH |
INTEROPERABLE ITEM NAME |
19 |
X |
L |
- |
182 |
K |
IOINTYAH |
ITEM INTEROPERABILITY CODE |
1 |
A |
F |
- |
266 |
K |
IOCAGEAH |
INTEROPERABLE CAGE CODE |
5 |
X |
F |
- |
046 |
|
IOREFNAH |
INTEROPERABLE REFERENCE NUMBER |
32 |
X |
L |
- |
337 |
|
IONIINAH |
INTEROPERABLE ITEM NATIONAL ITEM |
9 |
N |
F |
- |
253 |
|
|
IDENTIFICATION NUMBER |
|
|
|
|
|
|
IONFSCAH |
INTEROPERABLE ITEM NSN NATO SUPPLY |
4 |
N |
F |
- |
253 |
|
|
CLASSIFICATION |
|
|
|
|
|
|
IOITNMAH |
INTEROPERABLE ITEM TECHNICAL MANUAL NUMBER |
30 |
X |
L |
- |
440 |
|
C.5.9 Table AI, Modelling Data. This Table documents maintenance level specific information, for a given service designator code, to be used for LSA modelling. Table keys consist of EIAC (EIACODXA), Modelling Service Designator Code (SERDESAI), and Modelling O/M Level Code (OMLVLCAI). For a given row of information, the following cross-element edits apply to Table AI :
(a)Labour Rate (LABRATAI) and Labour Rate Currency Code (LRTCCDAI) shall either both be blank, or both have entries.
(b)Repair Work Space Cost (RPWSCSAI) and Repair Work Space Cost Currency Code (RWCCCDAI) shall either both be blank, or both have entries.
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X |
L |
- |
096 |
F |
SERDESAI |
MODELLING SERVICE DESIGNATOR CODE |
1 |
A |
F |
- |
376 |
K |
OMLVLCAI |
MODELLING OPERATIONS/MAINTENANCE LEVEL CODE |
1 |
A |
F |
- |
277 |
K |
LABRATAI |
LABOUR RATE |
4 |
N |
R |
2 |
189 |
|
LRTCCDAI |
LABOUR RATE CURRENCY CODE |
3 |
X |
- |
- |
629 |
|
NOSHPSAI |
NUMBER OF SHOPS |
2 |
N |
R |
- |
263 |
|
RPWSCSAI |
REPAIR WORKSPACE COST |
4 |
N |
R |
2 |
352 |
|
RWCCCDAI |
REPAIR WORK SPACE COST CURRENCY CODE |
3 |
X |
- |
- |
629 |
|
RQDSTKAI |
REQUIRED DAYS OF STOCK |
3 |
N |
R |
- |
357 |
|
C.5.10 Table AJ, Operations/Maintenance Level Transportation Requirement. This Table identifies the O/M level from which a spare/repair part is shipped and the O/M level which receives the part. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), O/M level from (OMLVLFAJ), O/M level to (OMLVLTAJ).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X L |
- |
096 |
F |
|
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
C-22
|
|
DEF STAN 00-60 (PART 0)/3 |
|||||
|
|
ANNEX C (CONTINUED) |
|||||
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
OMLVLFAJ |
OPERATIONS/MAINTENANCE LEVEL FROM |
1 |
A |
F |
- |
277 |
K |
OMLVLTAJ |
OPERATIONS/MAINTENANCE LEVEL TO |
1 |
A |
F |
- |
277 |
K |
SHPDISAJ |
TRANSPORTATION DISTANCE |
4 |
N |
R |
- |
085 |
|
TIMESHAJ |
TRANSPORTATION TIME |
3 |
N |
R |
- |
379 |
|
C.5.11 Table AK, System/End Item Narrative. This Table may be used to identify additional supportability considerations, additional supportability parameters, and operational mission failure definition. Table keys consist of EIAC (EIACODXA), LCN (LSACONXB), ALC (ALTLCNXB), LCN Type (LCNTYPXB), System/EI Narrative Code (SEINCDAK), and System/EI Narrative Text Sequencing Code (TEXSEQAK). For a given row of information, the following cross-element edits apply to Table AK :
(a)If the System/EI Narrative Code (SEINCDAK) is ‘B’, then this Table provides a narrative description of additional supportability considerations for the item under analysis (Additional Supportability Considerations, DED 010).
(b)If the System/EI Narrative Code (SEINCDAK) is ‘A’, then this Table describes additional supportability parameters which will specify data elements and associated data when discrete fields are not provided (Additional Supportability Parameters, DED 011).
(c)If the System/EI Narrative Code (SEINCDAK) is ‘C’, then this Table provides a narrative of the guidelines to be followed when defining operational mission failures (Operational Mission Failure Definition, DED 274).
CODE |
DATA ELEMENT TITLE/ROLE NAME |
FORMAT |
|
DED |
KEY |
||
EIACODXA |
END ITEM ACRONYM CODE |
10 |
X |
L |
- |
096 |
F |
LSACONXB |
LOGISTIC SUPPORT ANALYSIS CONTROL NUMBER |
18 |
X |
L |
- |
199 |
F |
|
(LCN) |
|
|
|
|
|
|
ALTLCNXB |
ALTERNATE LCN CODE |
2 |
N |
F |
- |
019 |
F |
LCNTYPXB |
LCN TYPE |
1 |
A |
F |
- |
203 |
F |
SEINCDAK |
SYSTEM/END ITEM NARRATIVE CODE |
1 |
A |
F |
- |
424 |
K |
TEXSEQAK |
SYSTEM END ITEM NARRATIVE TSC |
5 |
N |
R |
- |
450 |
K |
SEINARAK |
SYSTEM END ITEM NARRATIVE |
65 |
X |
- |
- |
--- |
|
C-23
DEF STAN 00-60 (PART 0)/3
ANNEX C (CONTINUED)
C.6 Item Reliability, Availability, and Maintainability Characteristics; Failure Modes Effects and Criticality Analysis; and, Maintainability Analysis
Data Tables beginning with ‘B’ in the first position of the Table Code are structured to provide a description of the function of each LSA candidate item (CI) of the system/end item; outline the maintenance concept to be utilized for design and support planning purposes; and, identify any design conditions such as fail safe requirements/environmental or nuclear hardness considerations imposed upon the system/end item. The Tables summarize the CI reliability, maintainability, and related availability characteristics, resulting from the failure modes and effects, criticality, and maintainability analyses, and accommodate a narrative description of any analysis related to the potential redesign of an item. Figure 8 depicts the relational hierarchy of these Tables/entities.
TABLE CODE |
TABLE TITLE |
BA |
Reliability, Availability, and Maintainability Characteristics |
BB |
Reliability, Availability, and Maintainability Characteristics Narrative |
BC |
Reliability, Availability, and Maintainability Logistics Considerations |
BD |
Reliability, Availability, and Maintainability Indicator Characteristics |
BE |
War/Peace Reliability, Availability, and Maintainability Indicator |
|
Characteristics |
BF |
Failure Mode and Reliability-Centred Maintenance Analysis |
BG |
Failure Mode and Reliability-Centred Maintenance Narrative |
BH |
Failure Mode Task |
BI |
Failure Mode Indicator Mission Phase Code Characteristics |
BJ |
Failure Mode Indicator Mission Phase Code Characteristics Narrative |
BK |
Reliability, Availability, and Maintainability Criticality |
BL |
Mission Phase Operational Mode |
C-24