- •Preface
- •Section One. General
- •0 Introduction
- •1 Scope
- •2 Related Documents
- •3 Definitions
- •4 Abbreviations
- •5 LSA and LSAR
- •Section Two. Management
- •6 LSA and LSAR Management
- •Section Three. Application of LSA and LSAR to Projects
- •7 LSA Process
- •8 Tailoring
- •9 Data Transfer
- •Table 1 LSA Task Responsibilities
- •Table 2 LSA Subtasks Related to LSAR Data Production
- •Table 3 LSA Tasks/LSAR Table relationships - Feasibility (DI/NDI Only)
- •Table 4 LSA Tasks/LSAR Table relationships - Feasibility (COTS Only)
- •Table 5 LSA Tasks/LSAR Table relationships - Feasibility (GFE Only)
- •Table 6 LSA Tasks/LSAR Table relationships - Project Definition
- •Table 7 LSA Tasks/LSAR Table relationships - Full Scale Development
- •Table 8 LSA Tasks/LSAR Table relationships - Production (DI/NDI Only)
- •Table 9 LSA Tasks/LSAR Table relationships - Production (COTS Only)
- •Table 10 Example of Cross-Mapping Records Held in Data Table XG
- •Table 11 Examples of LCN Group Elements Allocated in Data Table XB
- •Table 12 Examples of UOC/ALC Allocation in Data Table XC
- •Table 13 Examples of LCN to System End Item UOC in Data Table XF
- •Table 14 Examples of Implied UOC
- •Figure 1 The complete feedback loop of Logistic Support Analysis
- •Figure 2 LSA Process during equipment design
- •Figure 3 Task breakdown for full development project
- •Figure 4 Task breakdown for first-of-class warship project
- •Figure 5 Task breakdown for commercial off-the-shelf project
- •Figure 6 Task breakdown for non-developmental project
- •Figure 7 Tailoring logic diagram
- •Figure 8 LSA programme planning, control and verification sub-task dependencies
- •Figure 9 LSA assessment and technical sub-task dependencies
- •Figure 10 Comparison of Functional and Physical Breakdowns
- •Figure 11 Functional LCN breakdown
- •Figure 12 Physical LCN breakdown
- •Figure 13 Functional LCN assignment - classical
- •Figure 14 Physical LCN assignment - classical
- •Figure 15 Physical LCN assignment - modified classical
- •Figure 16 Functional LCN - cross-mapping
- •Figure 17 Physical LCN - cross-mapping
- •Figure 18 ALC Assignment for single configuration equipment
- •Figure 19 ALC & UOC Allocation
- •Figure 20 System level Logistic Support Analysis interfaces
- •Figure 21 LSAR Data Table utilization by equipment breakdown
- •Figure 22 Feasibility study phase LSAR

DEF STAN 00-60 (PART 2)/3
PART 2: GUIDE TO THE APPLICATION OF LSA AND LSAR
Section One. General
0 Introduction
0.1 This Part of this Defence Standard provides guidance on the application of LSA and LSAR within Parts 0 & 1 of this Defence Standard and should be read in conjunction with them.
1 Scope
1.1This Part of this Defence Standard provides information and guidance for interpretation of LSA and LSAR requirements, to meet the overall objectives of the procurement and through life management of Defence equipment. It can apply equally to a contractor's or a customer's LSA and LSAR requirements.
1.2This Part of this Defence Standard is not intended for use as a contractual document. It does not supersede or cancel any of the requirements within Parts 0 and 1 of this Defence Standard.
2 Related Documents
2.1A list of related documents that are applicable to implementing LSA within the MOD are detailed in Part 0 of this Defence Standard.
2.2The documents and publications referred to in this Part of this Defence Standard are detailed in Part 0 of this Defence Standard.
2.3A list of sources to obtain copies of related documents is shown in Part 0 of this Defence Standard.
3 Definitions
3.1 A glossary of terms used is included at annex A to Part 0 of this Defence Standard.
4 Abbreviations
4.1 A list of abbreviations used is included at annex A to Part 0 of this Defence Standard.
5 LSA and LSAR
5.1 During the design stage, the LSA process assists the design engineer to incorporate supportability requirements into equipment design. As the project progresses and designs become fixed, the LSA process generates data documented within the LSAR, which defines
5
DEF STAN 00-60 (PART 2)/3
the specific resources required to support an equipment throughout its In-Service phase. This data is used to plan, procure, deliver and manage support resources to ensure deployed systems meet the readiness and supportability objectives at optimum Life Cycle Cost (LCC).
5.2During the Production and In-Service phases of the project, LSA continues. In-service performance data is compared with data in the LSAR to identify high cost and readiness drivers. Corrective action will be taken, possibly under the terms of the contract. The LSA feedback loop is depicted at Figure 1.
5.3The LSA process is not limited to full design and development projects but is applicable to a Non-Development Item (NDI) or a Commercial Off The Shelf (COTS) procurement, as described in the LSA Strategy.
6

|
LOGISTIC SUPPORT |
|
TASK |
|
LOGISTIC SUPPORT |
|
TASK |
|
LOGISTIC SUPPORT |
|
TASK |
|
FUNCTIONAL |
|
|
|
USE STUDY |
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
ANALYSIS STRATEGY |
|
|
|
ANALYSIS PLAN |
|
|
|
ANALYSIS REVIEWS |
|
|
|
BLOCK DIAGRAM |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
101 |
|
|
|
102 |
|
|
|
103 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TASK |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
201 |
|
TASK
CONTINUE 201
EVALUATION
VERIFICATION
TASKS 402, 403
POST PRODUCTION
SUPPORT ANALYSIS
|
|
|
|
|
TASKS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COMPLETE DESIGN |
|
|
|
FAILUR MODE |
|
|
|
CONFIGURATION |
|||
|
|
|
|
|
|
|
||||||
|
|
301 |
|
|
|
|
||||||
|
|
|
EFFECTS & TASK |
|
|
|
HARDWARE |
|||||
|
LSAR DATABASE |
|
|
|
|
|
|
|
||||
|
|
|
|
|
ANALYSIS |
|
|
|
BLOCK DIAGRAM |
|||
|
|
|
|
401, 501 |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BASELINE |
|
|
COMPARATIVE |
|
|
SYSTEM |
|
|
DESIGN AIMS |
|
|
TASKS |
|
|
203, 205 |
|
|
EVALUATE DESIGN |
|
|
STANDARDIZATION |
|
|
TECHNOLOGY |
|
|
TASKS |
|
|
202, 204 |
|
TASKS |
ANALYZE DESIGN |
|
TRADEOFFS |
||
|
||
302, 303 |
SENSITIVITY |
|
COMPARATIVE |
||
|