Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
Скачиваний:
50
Добавлен:
29.03.2015
Размер:
451.85 Кб
Скачать

Ministry of Defence

Defence Standard

00-60(Part 2)/Issue 3

31 January 1999

 

 

INTEGRATED LOGISTIC SUPPORT

PART 2: GUIDE TO THE APPLICATION OF LSA AND LSAR

This Defence Standard supersedes Def Stan 00-60 (Part 2)/Issue 2 dated 31 March 1998

DEF STAN 00-60 (PART 2)/3

AMENDMENTS ISSUED SINCE PUBLICATION

AMENDMENT NUMBER

DATE OF ISSUE

TEXT AFFECTED

SIGNATURE & DATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revision Note

This revision of Def Stan 00-60 is primarily intended to rectify functional difficulties and make the Standard more suitable for UK use.

Details of the changes in all Parts can be obtained by contacting the 00-60 Help Desk on (44) (0)1489-571491 or 0060@bmtrcl.demon.co.uk or via the D Stan Help desk or web site http://www.dstan.mod.uk.

Historical Record

May 96 - Initial Issue of Parts 0 to 3, 10, 11 and 20.

Sep 96 - Up-Issue of Part 20 with amendments to Part 0; Issue 1 of Parts 21 to 25.

Mar 98 - Up-Issue of all Parts.

Jan 99 - Up-Issue of Parts 0, 2, 10, 11, 20, 21 and 24.

Arrangements of Def Stan 00-60

The proposed arrangement of the complete series of Defence Standards comprising Def Stan 00-60 is shown below.

Part 0 -

Application of Integrated Logistic

-

Defines Requirements for the

 

Support (ILS)

 

implementation of ILS

Part 1 -

Logistic Support Analysis (LSA) and

-

Defines the MOD

 

Logistic Support Analysis Record

 

requirements for

 

(LSAR)

 

implementing Logistic

 

 

 

Support Analysis (LSA) and

 

 

 

the LSA Record (LSAR)

DEF STAN 00-60 (PART 2)/3

Part 2 -

Guide to the Application of LSA and -

Provides supplementary

 

LSAR

guidance on the MOD

 

 

application of Logistic

 

 

Support Analysis (LSA) and

 

 

the LSA Record (LSAR)

Part 3 -

Guidance for Application of Software

 

Support

Part 10 -

Electronic Documentation

Part 11 -

Guidance on the Application of

 

Electronic Documentation in an ILS

 

Environment

-Defines the MOD LSA for Software requirements

-Defines the MOD Electronic Documentation requirements.

-Provides supplementary guidance on the MOD application of Electronic Documentation

Part 20 -

Application of Integrated Supply

-

Defines the MOD

 

Support Procedures

 

requirements for

 

 

 

implementing Supply Support

 

 

 

within ILS.

Part 21 -

Procedures for Initial Provisioning

-

Defines the MOD

 

 

 

requirements for

 

 

 

implementing Initial

 

 

 

Provisioning

Part 22 -

Procedures for Codification

-

Defines the MOD

 

 

 

requirements for

 

 

 

implementing Codification

Part 23 -

Procedures for Procurement Planning

-

Defines the MOD

 

 

 

requirements for

 

 

 

implementing Procurement

 

 

 

Planning

Part 24 -

Procedures for Order Administration

-

Defines the MOD

 

 

 

requirements for

 

 

 

implementing Order

 

 

 

Administration

Part 25 -

Procedures for Invoicing

-

Defines the MOD

 

 

 

requirements for

 

 

 

implementing Invoicing

DEF STAN 00-60 (PART 2)/3

Collation page

DEF STAN 00-60 (PART 2)/3

INTEGRATED LOGISTIC SUPPORT

PART 2: GUIDE TO THE APPLICATION OF LSA AND LSAR

PREFACE

This Defence Standard supersedes Def Stan 00-60 (Part 2)/Issue 2 dated 31 March 1998

iThis Part of the Defence Standard provides information and guidance on the application of Part 1 of this Defence Standard to Ministry of Defence (MOD) procurement and through life management of defence materiel.

iiThis Standard has been agreed by the authorities concerned with its use and is intended to be used in all future designs, contracts, orders etc and by amendment to those already in existence. If any difficulty arises which prevents application of the Defence Standard, the Defence Standard 00-60 Help Desk shall be informed so that a remedy may be sought.

iiiAny enquiries regarding this Standard in relation to an Invitation To Tender (ITT) or a contract in which it is incorporated are to be addressed to the responsible technical or supervising authority named in the ITT or contract.

ivThis Standard has been devised for use of the Crown and its contractors in the execution of contracts for the Crown. The Crown hereby excludes all liability (other than liability for death or personal injury) whatsoever and howsoever arising (including, but without limitation, negligence on the part of the Crown, its servants or agents) for any loss or damage however caused where this Defence Standard is used for any other purpose.

vThis part of the Defence Standard is based on the discontinued United States (US) Military Standard MIL-STD 1388-1A & 2B. Historically the MIL STDs have been the source documents used for the application of LSA and LSAR in relation to the procurement of materiel.

1

DEF STAN 00-60 (PART 2)/3

 

CONTENTS

PAGE

Preface

 

1

Section One. General

 

0

Introduction

5

1

Scope

5

2

Related Documents

5

3

Definitions

5

4

Abbreviations

5

5

LSA and LSAR

5

Section Two. Management

 

6

LSA and LSAR Management

8

Section Three Application of LSA and LSAR to Projects

 

7

LSA Process

10

8

Tailoring

18

9

Data Transfer

24

Table 1

LSA Task Responsibilities

12

Table 2

LSA Subtasks Related to LSAR Data Production

23

Table 3

LSA Tasks/LSAR Table relationships - Feasibility (DI/NDI Only)

25

Table 4

LSA Tasks/LSAR Table relationships - Feasibility (COTS Only)

25

Table 5

LSA Tasks/LSAR Table relationships - Feasibility (GFE Only)

25

Table 6

LSA Tasks/LSAR Table relationships - Project Definition

25

Table 7

LSA Tasks/LSAR Table relationships - Full Scale Development

26

Table 8

LSA Tasks/LSAR Table relationships - Production (DI/NDI Only)

26

Table 9

LSA Tasks/LSAR Table relationships - Production (DI/NDI Only)

27

Table 10

Example of Cross-Mapping Records Held in Data Table XG

A-15

Table 11

Examples of LCN Group Elements Allocated in Data Table XB

A-22

Table 12

Examples of UOC/ALC Allocation in Data Table XC

A-22

Table 13

Examples of LCN to System End Item

A-23

Table 14

Example of Implied UOC

A-23

Figure 1

The complete feedback loop of Logistic Support Analysis

7

Figure 2

LSA Process during equipment redesign

11

Figure 3

Task breakdown for full scale development project

13

Figure 4

Task breakdown for first-of-class warship project

14

Figure 5

Task breakdown for commercial-off-the-shelf project

15

Figure 6

Task breakdown for non-developmental project

16

Figure 7

Tailoring logic diagram

20

2

 

DEF STAN 00-60 (PART 2)/3

 

 

PAGE

Figure 8

LSA programme planning, control and verification sub-task

 

 

dependencies

21

Figure 9

LSA assessment and technical sub-task dependencies

22

Figure 10

Comparison of functional and physical breakdowns

A-2

Figure 11

Functional LCN breakdown

A-5

Figure 12

Physical LCN breakdown

A-6

Figure 13

Functional LCN assignment - classical

A-9

Figure 14

Physical LCN assignment - classical

A-11

Figure 15

Physical LCN assignment - modified classical

A-12

Figure 16

Functional LCN cross-mapping

A-13

Figure 17

Physical LCN cross-mapping

A-14

Figure 18

ALC Assignment for single configuration equipment

A-18

Figure 19

ALC and UOC Allocation

A-21

Figure 20

System level Logistics Support Analysis interfaces

B-3

Figure 21

LSAR Data table utilization by equipment breakdown

C-2

Figure 22

Feasibility study phase LSAR

C-5

Annex A

Guidance for the Assignment of Logistic Control Number

A-1

 

(LCN), Alternate LCN Code (ALC), LCN Type and

 

 

Usable On Code (UOC).

 

Annex B

Application Guidance for Implementation of LSA Programme

B-1

 

Requirements.

 

Annex C

Application and Tailoring Guidance for the LSAR.

C-1

3

DEF STAN 00-60 (PART 2)/3

Collation Page

4

Соседние файлы в папке DEF STAN 00-60