- •Preface
- •Section One. General
- •0 Introduction
- •1 Scope
- •2 Related Documents
- •3 Definitions
- •4 Abbreviations
- •5 LSA and LSAR
- •Section Two. Management
- •6 LSA and LSAR Management
- •Section Three. Application of LSA and LSAR to Projects
- •7 LSA Process
- •8 Tailoring
- •9 Data Transfer
- •Table 1 LSA Task Responsibilities
- •Table 2 LSA Subtasks Related to LSAR Data Production
- •Table 3 LSA Tasks/LSAR Table relationships - Feasibility (DI/NDI Only)
- •Table 4 LSA Tasks/LSAR Table relationships - Feasibility (COTS Only)
- •Table 5 LSA Tasks/LSAR Table relationships - Feasibility (GFE Only)
- •Table 6 LSA Tasks/LSAR Table relationships - Project Definition
- •Table 7 LSA Tasks/LSAR Table relationships - Full Scale Development
- •Table 8 LSA Tasks/LSAR Table relationships - Production (DI/NDI Only)
- •Table 9 LSA Tasks/LSAR Table relationships - Production (COTS Only)
- •Table 10 Example of Cross-Mapping Records Held in Data Table XG
- •Table 11 Examples of LCN Group Elements Allocated in Data Table XB
- •Table 12 Examples of UOC/ALC Allocation in Data Table XC
- •Table 13 Examples of LCN to System End Item UOC in Data Table XF
- •Table 14 Examples of Implied UOC
- •Figure 1 The complete feedback loop of Logistic Support Analysis
- •Figure 2 LSA Process during equipment design
- •Figure 3 Task breakdown for full development project
- •Figure 4 Task breakdown for first-of-class warship project
- •Figure 5 Task breakdown for commercial off-the-shelf project
- •Figure 6 Task breakdown for non-developmental project
- •Figure 7 Tailoring logic diagram
- •Figure 8 LSA programme planning, control and verification sub-task dependencies
- •Figure 9 LSA assessment and technical sub-task dependencies
- •Figure 10 Comparison of Functional and Physical Breakdowns
- •Figure 11 Functional LCN breakdown
- •Figure 12 Physical LCN breakdown
- •Figure 13 Functional LCN assignment - classical
- •Figure 14 Physical LCN assignment - classical
- •Figure 15 Physical LCN assignment - modified classical
- •Figure 16 Functional LCN - cross-mapping
- •Figure 17 Physical LCN - cross-mapping
- •Figure 18 ALC Assignment for single configuration equipment
- •Figure 19 ALC & UOC Allocation
- •Figure 20 System level Logistic Support Analysis interfaces
- •Figure 21 LSAR Data Table utilization by equipment breakdown
- •Figure 22 Feasibility study phase LSAR

Ministry of Defence
Defence Standard
00-60(Part 2)/Issue 3 |
31 January 1999 |
|
|
INTEGRATED LOGISTIC SUPPORT
PART 2: GUIDE TO THE APPLICATION OF LSA AND LSAR
This Defence Standard supersedes Def Stan 00-60 (Part 2)/Issue 2 dated 31 March 1998
DEF STAN 00-60 (PART 2)/3
AMENDMENTS ISSUED SINCE PUBLICATION
AMENDMENT NUMBER |
DATE OF ISSUE |
TEXT AFFECTED |
SIGNATURE & DATE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revision Note
This revision of Def Stan 00-60 is primarily intended to rectify functional difficulties and make the Standard more suitable for UK use.
Details of the changes in all Parts can be obtained by contacting the 00-60 Help Desk on (44) (0)1489-571491 or 0060@bmtrcl.demon.co.uk or via the D Stan Help desk or web site http://www.dstan.mod.uk.
Historical Record
May 96 - Initial Issue of Parts 0 to 3, 10, 11 and 20.
Sep 96 - Up-Issue of Part 20 with amendments to Part 0; Issue 1 of Parts 21 to 25.
Mar 98 - Up-Issue of all Parts.
Jan 99 - Up-Issue of Parts 0, 2, 10, 11, 20, 21 and 24.
Arrangements of Def Stan 00-60
The proposed arrangement of the complete series of Defence Standards comprising Def Stan 00-60 is shown below.
Part 0 - |
Application of Integrated Logistic |
- |
Defines Requirements for the |
|
Support (ILS) |
|
implementation of ILS |
Part 1 - |
Logistic Support Analysis (LSA) and |
- |
Defines the MOD |
|
Logistic Support Analysis Record |
|
requirements for |
|
(LSAR) |
|
implementing Logistic |
|
|
|
Support Analysis (LSA) and |
|
|
|
the LSA Record (LSAR) |
DEF STAN 00-60 (PART 2)/3
Part 2 - |
Guide to the Application of LSA and - |
Provides supplementary |
|
LSAR |
guidance on the MOD |
|
|
application of Logistic |
|
|
Support Analysis (LSA) and |
|
|
the LSA Record (LSAR) |
Part 3 - |
Guidance for Application of Software |
|
Support |
Part 10 - |
Electronic Documentation |
Part 11 - |
Guidance on the Application of |
|
Electronic Documentation in an ILS |
|
Environment |
-Defines the MOD LSA for Software requirements
-Defines the MOD Electronic Documentation requirements.
-Provides supplementary guidance on the MOD application of Electronic Documentation
Part 20 - |
Application of Integrated Supply |
- |
Defines the MOD |
|
Support Procedures |
|
requirements for |
|
|
|
implementing Supply Support |
|
|
|
within ILS. |
Part 21 - |
Procedures for Initial Provisioning |
- |
Defines the MOD |
|
|
|
requirements for |
|
|
|
implementing Initial |
|
|
|
Provisioning |
Part 22 - |
Procedures for Codification |
- |
Defines the MOD |
|
|
|
requirements for |
|
|
|
implementing Codification |
Part 23 - |
Procedures for Procurement Planning |
- |
Defines the MOD |
|
|
|
requirements for |
|
|
|
implementing Procurement |
|
|
|
Planning |
Part 24 - |
Procedures for Order Administration |
- |
Defines the MOD |
|
|
|
requirements for |
|
|
|
implementing Order |
|
|
|
Administration |
Part 25 - |
Procedures for Invoicing |
- |
Defines the MOD |
|
|
|
requirements for |
|
|
|
implementing Invoicing |
DEF STAN 00-60 (PART 2)/3
Collation page

DEF STAN 00-60 (PART 2)/3
INTEGRATED LOGISTIC SUPPORT
PART 2: GUIDE TO THE APPLICATION OF LSA AND LSAR
PREFACE
This Defence Standard supersedes Def Stan 00-60 (Part 2)/Issue 2 dated 31 March 1998
iThis Part of the Defence Standard provides information and guidance on the application of Part 1 of this Defence Standard to Ministry of Defence (MOD) procurement and through life management of defence materiel.
iiThis Standard has been agreed by the authorities concerned with its use and is intended to be used in all future designs, contracts, orders etc and by amendment to those already in existence. If any difficulty arises which prevents application of the Defence Standard, the Defence Standard 00-60 Help Desk shall be informed so that a remedy may be sought.
iiiAny enquiries regarding this Standard in relation to an Invitation To Tender (ITT) or a contract in which it is incorporated are to be addressed to the responsible technical or supervising authority named in the ITT or contract.
ivThis Standard has been devised for use of the Crown and its contractors in the execution of contracts for the Crown. The Crown hereby excludes all liability (other than liability for death or personal injury) whatsoever and howsoever arising (including, but without limitation, negligence on the part of the Crown, its servants or agents) for any loss or damage however caused where this Defence Standard is used for any other purpose.
vThis part of the Defence Standard is based on the discontinued United States (US) Military Standard MIL-STD 1388-1A & 2B. Historically the MIL STDs have been the source documents used for the application of LSA and LSAR in relation to the procurement of materiel.
1
DEF STAN 00-60 (PART 2)/3 |
|
||
CONTENTS |
PAGE |
||
Preface |
|
1 |
|
Section One. General |
|
||
0 |
Introduction |
5 |
|
1 |
Scope |
5 |
|
2 |
Related Documents |
5 |
|
3 |
Definitions |
5 |
|
4 |
Abbreviations |
5 |
|
5 |
LSA and LSAR |
5 |
|
Section Two. Management |
|
||
6 |
LSA and LSAR Management |
8 |
|
Section Three Application of LSA and LSAR to Projects |
|
||
7 |
LSA Process |
10 |
|
8 |
Tailoring |
18 |
|
9 |
Data Transfer |
24 |
|
Table 1 |
LSA Task Responsibilities |
12 |
|
Table 2 |
LSA Subtasks Related to LSAR Data Production |
23 |
|
Table 3 |
LSA Tasks/LSAR Table relationships - Feasibility (DI/NDI Only) |
25 |
|
Table 4 |
LSA Tasks/LSAR Table relationships - Feasibility (COTS Only) |
25 |
|
Table 5 |
LSA Tasks/LSAR Table relationships - Feasibility (GFE Only) |
25 |
|
Table 6 |
LSA Tasks/LSAR Table relationships - Project Definition |
25 |
|
Table 7 |
LSA Tasks/LSAR Table relationships - Full Scale Development |
26 |
|
Table 8 |
LSA Tasks/LSAR Table relationships - Production (DI/NDI Only) |
26 |
|
Table 9 |
LSA Tasks/LSAR Table relationships - Production (DI/NDI Only) |
27 |
|
Table 10 |
Example of Cross-Mapping Records Held in Data Table XG |
A-15 |
|
Table 11 |
Examples of LCN Group Elements Allocated in Data Table XB |
A-22 |
|
Table 12 |
Examples of UOC/ALC Allocation in Data Table XC |
A-22 |
|
Table 13 |
Examples of LCN to System End Item |
A-23 |
|
Table 14 |
Example of Implied UOC |
A-23 |
|
Figure 1 |
The complete feedback loop of Logistic Support Analysis |
7 |
|
Figure 2 |
LSA Process during equipment redesign |
11 |
|
Figure 3 |
Task breakdown for full scale development project |
13 |
|
Figure 4 |
Task breakdown for first-of-class warship project |
14 |
|
Figure 5 |
Task breakdown for commercial-off-the-shelf project |
15 |
|
Figure 6 |
Task breakdown for non-developmental project |
16 |
|
Figure 7 |
Tailoring logic diagram |
20 |
2
|
DEF STAN 00-60 (PART 2)/3 |
|
|
|
PAGE |
Figure 8 |
LSA programme planning, control and verification sub-task |
|
|
dependencies |
21 |
Figure 9 |
LSA assessment and technical sub-task dependencies |
22 |
Figure 10 |
Comparison of functional and physical breakdowns |
A-2 |
Figure 11 |
Functional LCN breakdown |
A-5 |
Figure 12 |
Physical LCN breakdown |
A-6 |
Figure 13 |
Functional LCN assignment - classical |
A-9 |
Figure 14 |
Physical LCN assignment - classical |
A-11 |
Figure 15 |
Physical LCN assignment - modified classical |
A-12 |
Figure 16 |
Functional LCN cross-mapping |
A-13 |
Figure 17 |
Physical LCN cross-mapping |
A-14 |
Figure 18 |
ALC Assignment for single configuration equipment |
A-18 |
Figure 19 |
ALC and UOC Allocation |
A-21 |
Figure 20 |
System level Logistics Support Analysis interfaces |
B-3 |
Figure 21 |
LSAR Data table utilization by equipment breakdown |
C-2 |
Figure 22 |
Feasibility study phase LSAR |
C-5 |
Annex A |
Guidance for the Assignment of Logistic Control Number |
A-1 |
|
(LCN), Alternate LCN Code (ALC), LCN Type and |
|
|
Usable On Code (UOC). |
|
Annex B |
Application Guidance for Implementation of LSA Programme |
B-1 |
|
Requirements. |
|
Annex C |
Application and Tailoring Guidance for the LSAR. |
C-1 |
3
DEF STAN 00-60 (PART 2)/3
Collation Page
4