- •Preface
- •Section One. General
- •0 Introduction
- •1 Scope
- •2 Related Documents
- •3 Definitions
- •4 Abbreviations
- •Section Two. Electronic Documentation Process
- •5 Introduction
- •6 In-Process Review
- •7 Quality Audit
- •Section Three. Application of S1000D
- •8 Introduction
- •9 Detailed Application
- •Section Four. Electronic Documentation Data Base, Data Transfer & Data Control.
- •10 Introduction
- •11 Data Base Structure
- •12 DM Interchange
- •13 Output Deliverable Control
- •Section Five. Non-Textual Information
- •14 Introduction
- •15 Detailed Requirements
- •16 Attaching Parts
- •Section Six. Parts Information
- •17 Introduction
- •18 Preparation of Parts Information (General)
- •19 Provision of Parts Information
- •Section Seven. Operator Information
- •20 Introduction
- •21 Scope of Information
- •22 Information Requirements
- •23 Checklists
- •24 Identification of DM
- •Section Eight. Maintenance Information
- •25 Introduction
- •26 General
- •27 Preventive Maintenance
- •28 Maintenance Resource
- •Section Nine. Publications Output
- •29 Introduction
- •30 Publication Production Mechanism
- •Table 1 Revised Tag Set Definitions
- •Table 2 Spares Lists DM Information Requirements
- •Table 3 Material Item Category Code (MICC)
- •Table 4 Material Item Sub-Category Code (MISCC)
- •Table 5 Major Zone Identification Numbers
- •Table 6 Sub Zone Identification Numbers
- •Table 7 Zone Identification Numbers
- •Table 8 Major Zone Identification Number.
- •Table 9 Sub Zone Identification Number
- •Table 10 Zone Identification Numbers
- •Table 11 Equipment Zone Identification Numbers
- •Table 12 Equipment Sub Zone Identification Numbers
- •Table 13 LRU Zone Identification Numbers
- •Figure 1 Data Module Code
- •Figure 2 DMC for S1000D application
- •Figure 3 Major Zones
- •Figure 4 Major Zones
- •Figure 5 Sub Zones
- •Figure 6 Zones
- •Figure 7 Access Codes
- •Figure 8 Major Zones
- •Figure 9 Sub Zones
- •Figure 10 Zones
- •Figure 11 Equipment Zones
- •Figure 12 Equipment Sub Zones
- •Figure 13 LRU Zones
- •Figure 14 Data Module Codes for Military Systems and Associated Equipments
DEF STAN 00-60 (PART 10)/3
Section Eight. Maintenance Information
25 Introduction
25.1 This Section of this Defence Standard details the requirements for the supply of DM that describe maintenance actions and the resource requirements in support of those maintenance activities.
26 General
26.1Maintenance shall be detailed as either preventive or corrective maintenance. All maintenance procedures shall be detailed, in accordance with S1000D using data derived from the relevant LSAR tables for specific projects. These procedures shall be identified as either preventive or corrective, by the appropriate IC.
26.2The flow of maintenance activity shall be as defined by the LSA process.
26.3DM containing maintenance schedules and maintenance resource information shall be identified by the appropriate IC.
26.4Preventive and corrective maintenance procedures together with maintenance resource summaries shall be produced as DM in accordance with Chapter 3 of S1000D.
27 Preventive Maintenance
27.1 To provide for operational commitments and in accordance with the project, preventive maintenance procedures shall be produced so that they can be completed at any time during their periodicities. These procedures shall be individual, stand-alone and shall be independent of the completion of any other procedure. It shall be permissible, however, to link procedures to avoid duplication of work.
28 Maintenance Resource
28.1Preventive Maintenance Schedules. For maintenance management purposes DM shall be provided in the form of preventive maintenance schedules detailing preventive maintenance activities planned for stated periodicities.
28.2Maintenance Resource Summaries. For maintenance management purposes maintenance resource DM shall be provided detailing the resource requirements for individual preventive and corrective maintenance procedures. DM, derived from generated data, shall also be provided in the form of preventive maintenance resource summaries. These shall show, in various formats, the complete preventive maintenance resource requirements.
26