GD Testing |
0.00 |
0.00 |
0 |
|
ID Training/Operation |
0.00 |
0.00 |
0 |
|
WT UPS Dedicated |
0.00 |
0.00 |
0 |
|
LK Magnetic |
0.00 |
0.00 |
0 |
|
BR Lighting |
0.00 |
0.00 |
0 |
|
SC Security Manual |
0.00 |
0.00 |
0 |
|
SC Security Policy |
0.00 |
0.00 |
0 |
|
EC Man-Trap |
0.00 |
0.00 |
0 |
|
CC Command Control Center |
0.00 |
0.00 |
0 |
|
PR Personnel Termination |
0.00 |
0.00 |
0 |
|
OV Lighting |
0.00 |
0.00 |
0 |
|
EC Biometrics Access |
0.00 |
0.00 |
0 |
|
SC Organization/Security |
0.00 |
0.00 |
0 |
|
EC Turnstiles |
0.00 |
0.00 |
0 |
|
ID Proximity Detectors |
0.00 |
0.00 |
0 |
|
ID Vibration Detectors |
0.00 |
0.00 |
0 |
|
BR Gate |
0.00 |
0.00 |
0 |
|
ID Photo Electric Detectors 0.00 |
0.00 |
0 |
|
|
IS Training |
0.00 |
0.00 |
0 |
|
SF Safety Inspection/Test |
0.00 |
0.00 |
0 |
|
VS Combination Control |
0.00 |
0.00 |
0 |
|
KY Key Card |
0.00 |
0.00 |
0 |
|
PW Surge Protectors & Filters |
0.00 |
0.00 |
0 |
|
PK Identification - Marking |
0.00 |
0.00 |
0 |
|
CN Bullet Proof Glass |
0.00 |
0.00 |
0 |
|
PM Policy/Procedure |
0.00 |
0.00 |
0 |
|
PW Battery/Backup |
0.00 |
0.00 |
0 |
|
CM Panic Alarm/Call Stations |
|
0.00 |
0.00 |
0 |
LK Locking Hardware |
0.00 |
0.00 |
0 |
|
ID Audible Detectors |
0.00 |
0.00 |
0 |
|
ID Infrared Motion Detectors |
|
0.00 |
0.00 |
0 |
ID Electric Field Detectors |
0.00 |
0.00 |
0 |
|
ID Fiber-Optic Cable |
0.00 |
0.00 |
0 |
|
ID Microwave Beam |
0.00 |
0.00 |
0 |
|
ID Magnetic/Contact Switches |
|
0.00 |
0.00 |
0 |
WT Pumps |
0.00 |
0.00 |
0 |
|
ID Microwave Motion Detectors |
0.00 |
0.00 |
0 |
|
EC UPS Dedicated |
0.00 |
0.00 |
0 |
|
ID Ultrasonic Motion Detectors |
0.00 |
0.00 |
0 |
|
EC Revolving Doors |
0.00 |
0.00 |
0 |
|
EN Water Supply |
0.00 |
0.00 |
0 |
|
OV CCTV Cameras |
0.00 |
0.00 |
0 |
|
GD Patrol Vehicles |
0.00 |
0.00 |
0 |
|
CP Disaster Recovery |
0.00 |
0.00 |
0 |
|
ID Radar |
0.00 |
0.00 |
0 |
|
ID Seismic |
0.00 |
0.00 |
0 |
|
IN Problem Resolution Process |
0.00 |
0.00 |
0 |
|
GD Patrol/Tour Reporting |
0.00 |
0.00 |
0 |
|
IN Inquiry/Investigation |
0.00 |
0.00 |
0 |
|
GD Training |
0.00 |
0.00 |
0 |
|
BR Tank Trap |
0.00 |
0.00 |
0 |
|
WT Drains |
0.00 |
0.00 |
0 |
|
PR Insurance/Bonding |
0.00 |
0.00 |
0 |
|
PK Screening |
0.00 |
0.00 |
0 |
|
VS Vaults/Safes |
0.00 |
0.00 |
0 |
|
PK Package Entry & Control |
0.00 |
0.00 |
0 |
|
IN Simulation Exercises |
0.00 |
0.00 |
0 |
|
VC Screening |
0.00 |
0.00 |
0 |
|
CN Guard Shack/Tower |
0.00 |
0.00 |
0 |
|
ID CCTV Motion Detection |
0.00 |
0.00 |
0 |
|
ID Taut-Wire |
0.00 |
0.00 |
0 |
|
ID Infrared Beam |
0.00 |
0.00 |
0 |
|
ID Microphonic Cable |
0.00 |
0.00 |
0 |
|
PR Personnel Control |
0.00 |
0.00 |
0 |
|
CN Steel Mesh Walls |
0.00 |
0.00 |
0 |
|
ID Magnetic |
0.00 |
0.00 |
0 |
|
ID Vibration Sensor |
0.00 |
0.00 |
0 |
|
ID Differential Pressure |
0.00 |
0.00 |
0 |
|
BR Concertina Wire |
0.00 |
0.00 |
0 |
|
IS Integrated System |
0.00 |
0.00 |
0 |
|
VC Vehicle Barriers |
0.00 |
0.00 |
0 |
|
PR Personnel Screening |
0.00 |
0.00 |
0 |
|
BR Berm |
0.00 |
0.00 |
0 |
|
BR Water |
0.00 |
0.00 |
0 |
|
SR Shipping and Receiving |
0.00 |
0.00 |
0 |
|
CP Contingency Planning |
0.00 |
0.00 |
0 |
|
EC Electromagnotometer |
0.00 |
0.00 |
0 |
|
VC Entry Control |
0.00 |
0.00 |
0 |
|
PW Emergency Generator |
0.00 |
0.00 |
0 |
|
PW UPS |
0.00 |
0.00 |
0 |
|
EC X-Ray |
0.00 |
0.00 |
0 |
|
BR Chain Link Fence |
0.00 |
0.00 |
0 |
|
CN Construction/Design |
0.00 |
0.00 |
0 |
BR Brick Wall |
0.00 |
0.00 |
0 |
PW Alternate Feeds |
0.00 |
0.00 |
0 |
BR Post/Pillars |
0.00 |
0.00 |
0 |
SC Security Staff |
0.00 |
0.00 |
0 |
BR Buffer/Control Zone |
0.00 |
0.00 |
0 |
GD Escorts |
0.00 |
0.00 |
0 |
Safeguards |
B/C-10% |
ROI-10% |
PP-10% |
|
FR Exit Signs & Evac. Routes |
|
0.01 |
0.00 |
0 |
FR Flammable Storage Container |
0.01 |
0.00 |
0 |
|
FR Marshal/Brigade |
0.00 |
0.00 |
0 |
|
IN Medical Incident Response |
|
0.00 |
0.00 |
0 |
FR Alarm Beacon/Audible |
0.00 |
0.00 |
0 |
|
FR Testing/Inspection |
0.00 |
0.00 |
1 |
|
FR Policy/Procedure |
0.00 |
0.00 |
0 |
|
CM Public Announcement System |
0.00 |
0.00 |
0 |
|
IH Document Destruction Equipment |
0.00 |
0.00 |
0 |
|
BR Warning Signs |
0.00 |
0.00 |
0 |
|
BR Jersey Wall |
0.00 |
0.00 |
0 |
|
OV Night Vision Instruments |
0.00 |
0.00 |
0 |
|
SF Emergency Lighting |
0.00 |
0.00 |
0 |
|
FR Water Supply |
0.00 |
0.00 |
0 |
|
CN Solid Core Doors |
0.00 |
0.00 |
0 |
|
BM Explosives Identification |
|
0.00 |
0.00 |
0 |
BM Explosives Detection |
0.00 |
0.00 |
0 |
|
FR Detection |
0.00 |
0.00 |
0 |
|
PW Policy/Procedure |
0.00 |
0.00 |
0 |
|
IS UPS Dedicated |
0.00 |
0.00 |
0 |
|
VC Removal |
0.00 |
0.00 |
1 |
|
CM Policy/Procedure |
0.00 |
0.00 |
0 |
|
IN Incident Notification |
0.00 |
0.00 |
0 |
|
SF Gas/Radioactive Detectors |
|
0.00 |
0.00 |
0 |
KY Policy |
0.00 |
0.00 |
0 |
|
LK Policy/Procedure |
0.00 |
0.00 |
0 |
|
BM Bomb Threat Procedures |
0.00 |
0.00 |
0 |
|
OV UPS Dedicated |
0.00 |
0.00 |
0 |
|
CM Testing |
0.00 |
0.00 |
0 |
|
FR UPS Dedicated |
0.00 |
0.00 |
0 |
|
CM UPS Dedicated |
0.00 |
0.00 |
0 |
|
SF UPS Dedicated |
0.00 |
0.00 |
0 |
|
KY Key Control/Inventory |
0.00 |
0.00 |
0 |
|
VC Vehicle Control |
0.00 |
0.00 |
0 |
|
BR Policy/Procedure |
0.00 |
0.00 |
0 |
|
KY Keys |
0.00 |
0.00 |
0 |
|
EC Testing |
0.00 |
0.00 |
0 |
|
IN Incident Response |
0.00 |
0.00 |
0 |
|
FR Portable Extinguishers |
0.00 |
0.00 |
0 |
|
GD Policy/Procedure |
0.00 |
0.00 |
0 |
|
CS Contract Specifications |
0.00 |
0.00 |
0 |
|
SF Shatter Protection of Windows |
0.00 |
0.00 |
0 |
|
FR Automatic Suppression |
0.00 |
0.00 |
0 |
|
WT Testing Pumps/Drains/Detection |
0.00 |
0.00 |
1 |
|
ID Testing/Inspection |
0.00 |
0.00 |
0 |
|
IH Information Handling |
0.00 |
0.00 |
0 |
|
BM Bomb Disposal Equipment |
0.00 |
0.00 |
0 |
|
ID UPS Dedicated |
0.00 |
0.00 |
0 |
|
CE Counter-surveillance Equipment |
0.00 |
0.00 |
0 |
|
GD Guard Accessories |
0.00 |
0.00 |
0 |
|
VC Identification - Marking 0.00 |
0.00 |
0 |
|
|
PR Personnel Identification - Badges |
0.00 |
0.00 |
0 |
|
CM Linguist/Sign Language |
0.00 |
0.00 |
0 |
|
CM Radio/Phone/Pager |
0.00 |
0.00 |
0 |
|
PW Testing |
0.00 |
0.00 |
0 |
|
SR Logs |
0.00 |
0.00 |
0 |
|
VS Policy/Procedure |
0.00 |
0.00 |
0 |
|
WT Moisture Detection |
0.00 |
0.00 |
0 |
|
IS Testing |
0.00 |
0.00 |
0 |
|
CN Steel Bars/Grills |
0.00 |
0.00 |
0 |
|
GD Weapons |
0.00 |
0.00 |
0 |
|
SR Policy/Procedure |
0.00 |
0.00 |
0 |
|
ID Pressure Mats |
0.00 |
0.00 |
0 |
|
IS Policy/Procedure |
0.00 |
0.00 |
0 |
|
ID Policy Procedure |
0.00 |
0.00 |
0 |
|
SF Safety Manual |
0.00 |
0.00 |
0 |
|
GD Testing |
0.00 |
0.00 |
0 |
|
ID Training/Operation |
0.00 |
0.00 |
0 |
|
WT UPS Dedicated |
0.00 |
0.00 |
0 |
|
LK Magnetic |
0.00 |
0.00 |
0 |
|
BR Lighting |
0.00 |
0.00 |
0 |
|
SC Security Manual |
0.00 |
0.00 |
0 |
|
SC Security Policy |
0.00 |
0.00 |
0 |
|
EC Man-Trap |
0.00 |
0.00 |
0 |
|
CC Command Control Center |
0.00 |
0.00 |
0 |
|
PR Personnel Termination |
0.00 |
0.00 |
0 |
|
OV Lighting |
0.00 |
0.00 |
0 |
|
EC Biometrics Access |
0.00 |
0.00 |
0 |
|
SC Organization/Security |
0.00 |
0.00 |
0 |
|
EC Turnstiles |
0.00 |
0.00 |
0 |
|
ID Proximity Detectors |
0.00 |
0.00 |
0 |
|
ID Vibration Detectors |
0.00 |
0.00 |
0 |
|
BR Gate |
0.00 |
0.00 |
0 |
|
ID Photo Electric Detectors 0.00 |
0.00 |
0 |
|
|
IS Training |
0.00 |
0.00 |
0 |
|
SF Safety Inspection/Test |
0.00 |
0.00 |
0 |
|
VS Combination Control |
0.00 |
0.00 |
0 |
|
KY Key Card |
0.00 |
0.00 |
0 |
|
PW Surge Protectors & Filters |
0.00 |
0.00 |
0 |
|
PK Identification - Marking |
0.00 |
0.00 |
0 |
|
CN Bullet Proof Glass |
0.00 |
0.00 |
0 |
|
PM Policy/Procedure |
0.00 |
0.00 |
0 |
|
PW Battery/Backup |
0.00 |
0.00 |
0 |
|
CM Panic Alarm/Call Stations |
|
0.00 |
0.00 |
0 |
LK Locking Hardware |
0.00 |
0.00 |
0 |
|
ID Audible Detectors |
0.00 |
0.00 |
0 |
|
ID Infrared Motion Detectors |
|
0.00 |
0.00 |
0 |
ID Electric Field Detectors |
0.00 |
0.00 |
0 |
|
ID Fiber-Optic Cable |
0.00 |
0.00 |
0 |
|
ID Microwave Beam |
0.00 |
0.00 |
0 |
|
ID Magnetic/Contact Switches |
|
0.00 |
0.00 |
0 |
WT Pumps |
0.00 |
0.00 |
0 |
|
ID Microwave Motion Detectors |
0.00 |
0.00 |
0 |
|
EC UPS Dedicated |
0.00 |
0.00 |
0 |
|
ID Ultrasonic Motion Detectors |
0.00 |
0.00 |
0 |
|
EC Revolving Doors |
0.00 |
0.00 |
0 |
|
EN Water Supply |
0.00 |
0.00 |
0 |
|
OV CCTV Cameras |
0.00 |
0.00 |
0 |
|
GD Patrol Vehicles |
0.00 |
0.00 |
0 |
|
CP Disaster Recovery |
0.00 |
0.00 |
0 |
|
ID Radar |
0.00 |
0.00 |
0 |
|
ID Seismic |
0.00 |
0.00 |
0 |
|
IN Problem Resolution Process |
0.00 |
0.00 |
0 |
|
GD Patrol/Tour Reporting |
0.00 |
0.00 |
0 |
IN Inquiry/Investigation |
0.00 |
0.00 |
0 |
GD Training |
0.00 |
0.00 |
0 |
BR Tank Trap |
0.00 |
0.00 |
0 |
WT Drains |
0.00 |
0.00 |
0 |
PR Insurance/Bonding |
0.00 |
0.00 |
0 |
PK Screening |
0.00 |
0.00 |
0 |
VS Vaults/Safes |
0.00 |
0.00 |
0 |
PK Package Entry & Control |
0.00 |
0.00 |
0 |
IN Simulation Exercises |
0.00 |
0.00 |
0 |
VC Screening |
0.00 |
0.00 |
0 |
CN Guard Shack/Tower |
0.00 |
0.00 |
0 |
ID CCTV Motion Detection |
0.00 |
0.00 |
0 |
ID Taut-Wire |
0.00 |
0.00 |
0 |
ID Infrared Beam |
0.00 |
0.00 |
0 |
ID Microphonic Cable |
0.00 |
0.00 |
0 |
PR Personnel Control |
0.00 |
0.00 |
0 |
CN Steel Mesh Walls |
0.00 |
0.00 |
0 |
ID Magnetic |
0.00 |
0.00 |
0 |
ID Vibration Sensor |
0.00 |
0.00 |
0 |
ID Differential Pressure |
0.00 |
0.00 |
0 |
BR Concertina Wire |
0.00 |
0.00 |
0 |
IS Integrated System |
0.00 |
0.00 |
0 |
VC Vehicle Barriers |
0.00 |
0.00 |
0 |
PR Personnel Screening |
0.00 |
0.00 |
0 |
BR Berm |
0.00 |
0.00 |
0 |
BR Water |
0.00 |
0.00 |
0 |
SR Shipping and Receiving |
0.00 |
0.00 |
0 |
CP Contingency Planning |
0.00 |
0.00 |
0 |
EC Electromagnotometer |
0.00 |
0.00 |
0 |
VC Entry Control |
0.00 |
0.00 |
0 |
PW Emergency Generator |
0.00 |
0.00 |
0 |
PW UPS |
0.00 |
0.00 |
0 |
EC X-Ray |
0.00 |
0.00 |
0 |
BR Chain Link Fence |
0.00 |
0.00 |
0 |
CN Construction/Design |
0.00 |
0.00 |
0 |
BR Brick Wall |
0.00 |
0.00 |
0 |
PW Alternate Feeds |
0.00 |
0.00 |
0 |
BR Post/Pillars |
0.00 |
0.00 |
0 |
SC Security Staff |
0.00 |
0.00 |
0 |
BR Buffer/Control Zone |
0.00 |
0.00 |
0 |
GD Escorts |
0.00 |
0.00 |
0 |
Safeguards |
B/C-15% |
ROI-15% |
PP-15% |
|
FR Exit Signs & Evac. Routes |
|
0.01 |
0.00 |
0 |
FR Flammable Storage Container |
0.01 |
0.00 |
0 |
|
FR Marshal/Brigade |
0.00 |
0.00 |
0 |
|
IN Medical Incident Response |
|
0.00 |
0.00 |
0 |
FR Alarm Beacon/Audible |
0.00 |
0.00 |
0 |
|
FR Testing/Inspection |
0.00 |
0.00 |
1 |
|
FR Policy/Procedure |
0.00 |
0.00 |
0 |
|
CM Public Announcement System |
0.00 |
0.00 |
0 |
|
IH Document Destruction Equipment |
0.00 |
0.00 |
0 |
|
BR Warning Signs |
0.00 |
0.00 |
0 |
|
BR Jersey Wall |
0.00 |
0.00 |
0 |
|
OV Night Vision Instruments |
0.00 |
0.00 |
0 |
|
SF Emergency Lighting |
0.00 |
0.00 |
0 |
|
FR Water Supply |
0.00 |
0.00 |
0 |
|
CN Solid Core Doors |
0.00 |
0.00 |
0 |
|
BM Explosives Identification |
|
0.00 |
0.00 |
0 |
BM Explosives Detection |
0.00 |
0.00 |
0 |
|
FR Detection |
0.00 |
0.00 |
0 |
|
PW Policy/Procedure |
0.00 |
0.00 |
0 |
|
IS UPS Dedicated |
0.00 |
0.00 |
0 |
|
VC Removal |
0.00 |
0.00 |
1 |
|
CM Policy/Procedure |
0.00 |
0.00 |
0 |
|
IN Incident Notification |
0.00 |
0.00 |
0 |
|
SF Gas/Radioactive Detectors |
|
0.00 |
0.00 |
0 |
KY Policy |
0.00 |
0.00 |
0 |
|
LK Policy/Procedure |
0.00 |
0.00 |
0 |
|
BM Bomb Threat Procedures |
0.00 |
0.00 |
0 |
|
OV UPS Dedicated |
0.00 |
0.00 |
0 |
|
CM Testing |
0.00 |
0.00 |
0 |
|
FR UPS Dedicated |
0.00 |
0.00 |
0 |
|
CM UPS Dedicated |
0.00 |
0.00 |
0 |
|
SF UPS Dedicated |
0.00 |
0.00 |
0 |
|
KY Key Control/Inventory |
0.00 |
0.00 |
0 |
|
VC Vehicle Control |
0.00 |
0.00 |
0 |
|
BR Policy/Procedure |
0.00 |
0.00 |
0 |
|
KY Keys |
0.00 |
0.00 |
0 |
|
EC Testing |
0.00 |
0.00 |
0 |
|
IN Incident Response |
0.00 |
0.00 |
0 |
|
FR Portable Extinguishers |
0.00 |
0.00 |
0 |
|
GD Policy/Procedure |
0.00 |
0.00 |
0 |
|
CS Contract Specifications |
0.00 |
0.00 |
0 |
|
SF Shatter Protection of Windows |
0.00 |
0.00 |
0 |
|
FR Automatic Suppression |
0.00 |
0.00 |
0 |
|
WT Testing Pumps/Drains/Detection |
0.00 |
0.00 |
1 |
|
ID Testing/Inspection |
0.00 |
0.00 |
0 |
|
IH Information Handling |
0.00 |
0.00 |
0 |
|
BM Bomb Disposal Equipment |
0.00 |
0.00 |
0 |
|
ID UPS Dedicated |
0.00 |
0.00 |
0 |
|
CE Counter-surveillance Equipment |
0.00 |
0.00 |
0 |
|
GD Guard Accessories |
0.00 |
0.00 |
0 |
|
VC Identification - Marking 0.00 |
0.00 |
0 |
|
|
PR Personnel Identification - Badges |
0.00 |
0.00 |
0 |
|
CM Linguist/Sign Language |
0.00 |
0.00 |
0 |
|
CM Radio/Phone/Pager |
0.00 |
0.00 |
0 |
|
PW Testing |
0.00 |
0.00 |
0 |
|
SR Logs |
0.00 |
0.00 |
0 |
|
VS Policy/Procedure |
0.00 |
0.00 |
0 |
|
WT Moisture Detection |
0.00 |
0.00 |
0 |
|
IS Testing |
0.00 |
0.00 |
0 |
|
CN Steel Bars/Grills |
0.00 |
0.00 |
0 |
|
GD Weapons |
0.00 |
0.00 |
0 |
|
SR Policy/Procedure |
0.00 |
0.00 |
0 |
|
ID Pressure Mats |
0.00 |
0.00 |
0 |
|
IS Policy/Procedure |
0.00 |
0.00 |
0 |
|
ID Policy Procedure |
0.00 |
0.00 |
0 |
|
SF Safety Manual |
0.00 |
0.00 |
0 |
|
GD Testing |
0.00 |
0.00 |
0 |
|
ID Training/Operation |
0.00 |
0.00 |
0 |
|
WT UPS Dedicated |
0.00 |
0.00 |
0 |
|
LK Magnetic |
0.00 |
0.00 |
0 |
|
BR Lighting |
0.00 |
0.00 |
0 |
|
SC Security Manual |
0.00 |
0.00 |
0 |
|
SC Security Policy |
0.00 |
0.00 |
0 |
|
EC Man-Trap |
0.00 |
0.00 |
0 |
|
CC Command Control Center |
0.00 |
0.00 |
0 |
|
PR Personnel Termination |
0.00 |
0.00 |
0 |
|
OV Lighting |
0.00 |
0.00 |
0 |
|
EC Biometrics Access |
0.00 |
0.00 |
0 |
|
SC Organization/Security |
0.00 |
0.00 |
0 |
|
EC Turnstiles |
0.00 |
0.00 |
0 |
|
ID Proximity Detectors |
0.00 |
0.00 |
0 |
|
ID Vibration Detectors |
0.00 |
0.00 |
0 |
|
BR Gate |
0.00 |
0.00 |
0 |
|
ID Photo Electric Detectors 0.00 |
0.00 |
0 |
|
|
IS Training |
0.00 |
0.00 |
0 |
|
SF Safety Inspection/Test |
0.00 |
0.00 |
0 |
|
VS Combination Control |
0.00 |
0.00 |
0 |
|
KY Key Card |
0.00 |
0.00 |
0 |
|
PW Surge Protectors & Filters |
0.00 |
0.00 |
0 |
|
PK Identification - Marking |
0.00 |
0.00 |
0 |
|
CN Bullet Proof Glass |
0.00 |
0.00 |
0 |
|
PM Policy/Procedure |
0.00 |
0.00 |
0 |
|
PW Battery/Backup |
0.00 |
0.00 |
0 |
|
CM Panic Alarm/Call Stations |
|
0.00 |
0.00 |
0 |
LK Locking Hardware |
0.00 |
0.00 |
0 |
|
ID Audible Detectors |
0.00 |
0.00 |
0 |
|
ID Infrared Motion Detectors |
|
0.00 |
0.00 |
0 |
ID Electric Field Detectors |
0.00 |
0.00 |
0 |
|
ID Fiber-Optic Cable |
0.00 |
0.00 |
0 |
|
ID Microwave Beam |
0.00 |
0.00 |
0 |
|
ID Magnetic/Contact Switches |
|
0.00 |
0.00 |
0 |
WT Pumps |
0.00 |
0.00 |
0 |
|
ID Microwave Motion Detectors |
0.00 |
0.00 |
0 |
|
EC UPS Dedicated |
0.00 |
0.00 |
0 |
|
ID Ultrasonic Motion Detectors |
0.00 |
0.00 |
0 |
|
EC Revolving Doors |
0.00 |
0.00 |
0 |
|
EN Water Supply |
0.00 |
0.00 |
0 |
|
OV CCTV Cameras |
0.00 |
0.00 |
0 |
|
GD Patrol Vehicles |
0.00 |
0.00 |
0 |
|
CP Disaster Recovery |
0.00 |
0.00 |
0 |
|
ID Radar |
0.00 |
0.00 |
0 |
|
ID Seismic |
0.00 |
0.00 |
0 |
|
IN Problem Resolution Process |
0.00 |
0.00 |
0 |
|
GD Patrol/Tour Reporting |
0.00 |
0.00 |
0 |
|
IN Inquiry/Investigation |
0.00 |
0.00 |
0 |
|
GD Training |
0.00 |
0.00 |
0 |
|
BR Tank Trap |
0.00 |
0.00 |
0 |
|
WT Drains |
0.00 |
0.00 |
0 |
|
PR Insurance/Bonding |
0.00 |
0.00 |
0 |
|
PK Screening |
0.00 |
0.00 |
0 |
VS Vaults/Safes |
0.00 |
0.00 |
0 |
PK Package Entry & Control |
0.00 |
0.00 |
0 |
IN Simulation Exercises |
0.00 |
0.00 |
0 |
VC Screening |
0.00 |
0.00 |
0 |
CN Guard Shack/Tower |
0.00 |
0.00 |
0 |
ID CCTV Motion Detection |
0.00 |
0.00 |
0 |
ID Taut-Wire |
0.00 |
0.00 |
0 |
ID Infrared Beam |
0.00 |
0.00 |
0 |
ID Microphonic Cable |
0.00 |
0.00 |
0 |
PR Personnel Control |
0.00 |
0.00 |
0 |
CN Steel Mesh Walls |
0.00 |
0.00 |
0 |
ID Magnetic |
0.00 |
0.00 |
0 |
ID Vibration Sensor |
0.00 |
0.00 |
0 |
ID Differential Pressure |
0.00 |
0.00 |
0 |
BR Concertina Wire |
0.00 |
0.00 |
0 |
IS Integrated System |
0.00 |
0.00 |
0 |
VC Vehicle Barriers |
0.00 |
0.00 |
0 |
PR Personnel Screening |
0.00 |
0.00 |
0 |
BR Berm |
0.00 |
0.00 |
0 |
BR Water |
0.00 |
0.00 |
0 |
SR Shipping and Receiving |
0.00 |
0.00 |
0 |
CP Contingency Planning |
0.00 |
0.00 |
0 |
EC Electromagnotometer |
0.00 |
0.00 |
0 |
VC Entry Control |
0.00 |
0.00 |
0 |
PW Emergency Generator |
0.00 |
0.00 |
0 |
PW UPS |
0.00 |
0.00 |
0 |
EC X-Ray |
0.00 |
0.00 |
0 |
BR Chain Link Fence |
0.00 |
0.00 |
0 |
CN Construction/Design |
0.00 |
0.00 |
0 |
BR Brick Wall |
0.00 |
0.00 |
0 |
PW Alternate Feeds |
0.00 |
0.00 |
0 |
BR Post/Pillars |
0.00 |
0.00 |
0 |
SC Security Staff |
0.00 |
0.00 |
0 |
BR Buffer/Control Zone |
0.00 |
0.00 |
0 |
GD Escorts |
0.00 |
0.00 |
0 |
The following table shows the safeguards with the 10 greatest Return on Investment (ROI-10%). Also shown are the Initial and Maintenance Costs of those safeguards. Following the table are barcharts and piecharts of the costs.
