X
- •Table of contents
- •Executive Summary
- •Recommendations
- •Operational Environment and System Configuration
- •The Risk Assessment Team
- •Organization Details of SpecOrg
- •Physical Plant and Physical Security
- •System Configuration
- •Terms and Definitions
- •Risk Analysis Methodology
- •RiskWatch Parameters and Data Analysis
- •Executive Summary Scope
- •Risk Analysis Steps
- •Key Risk Analysis Report Findings
- •Summary of asset categories
- •Assets within category
- •Direct, Personnel
- •Dollars
- •Safeguard: Physical Access Control
- •Safeguard: Classification Markings
- •Safeguard: Data Encryption
- •Safeguard: Life Cycle Management
- •Safeguard: Personnel Clearances
- •Safeguard: Quality Assurance
- •Safeguard: Security Policy
- •Recommendations
- •Physical Access Control
- •Application Controls
- •Classification Markings
- •Contract Specifications
- •Data Encryption
- •Detection System
- •Life Cycle Management
- •Passwords/Authenticaion
- •Personnel Clearances
- •Personnel Control
- •Quality Assurance
- •Risk Analysis
- •Security Policy
- •Return On Invest ment(roi). Calculated in order of the 10 highest roIs.
- •5.1 Summary of safeguards
- •Initial costs
- •Access Control (26.0%)
- •Evaluation (6.0%)
- •Policy (26.0%) Reliability (16.0%)
Соседние файлы в папке лаба_10
