Figure 2.6.12 Transition of MCR design principles

is incorporated in the basic design of the ABWR- type MCR panels.

  1. The functions of the MCR panels include those of the second generation MCR panels.

  2. One main control console and one wide display panel replace the one main and two auxiliary control benchboards of the second generation MCR as MCR control benchboards.

  3. The following functions are added to support operators.

-Automation of the standard operations immediately after a reactor scram

-Enhanced annunciation system (Layered

structure for easier identification)

-Automation of control rod operation

The ABWR-type MCR control benchboards are comprised of a main control console and a wide display panel, the conceptual configuration of which is illustrated in Figure 2.6.13. The extent of automation in each of the three generations of MCR panels is shown as a comparative chart in Table 2.6.3. Automation of control rod operation and automation of the standard operations immediately after a scram are employed in the third generation MCR design.

Wide Display Panel

Important alarms display

Fixed mimic display

Large screen display

System annunciators

ITV

First-hit event- display

3BbBia3b3jjsbj5ca;nS1ss!aacBa3caoanoDaj3j;|

Mode switches

(non-safety-related systems)

Mode switches (safety-related systems)

Colored liquid

crystal display (for scheduled inspection)

Colored liquid

CRT crystal display

(non-safety- related systems)

Colored liquid crystal display

(safety-related systems)

Main Control Console

Figure 2.6.13 Conceptual configuration of ABWR MCR control benchboards

NSRA, Japan

2-72

Chapter 2 Systems of BWR Nuclear Power Plants

Table 2.6.3 Comparison of automation extent in three MCR generations

Operation

Phase

Typical Operation

1st generation

2nd generation

3rd generation

(ABWR)

Startup

Mode switch changeover Reactor

Deaeration

systems

Control rod operation

M

M

M

OG + M

OG + M

M

OG + M

OG + M/S

A/F

Gland seal system

Turbine startup

systems Offgas system startup

Feedwater pump startup

M

M

M

OG + M

OG + M

OG + M

OG + M/S

OG + M/S

OG + M/S

Control valve warming Main turbine

Turbine runup

& generator

Synchronization

M

M

M

A/F

A/F

A/F

A/F

A/F

A/F

Surveillance test

ECCS

M

OG + M

OG + M

Immediately after scram

Mode switch changeover

Turbine shutdown

Turbine driven feedwater pump stop

Gland seal system changeover

M

M

M

M

M

M

M

M

M

A/L

A/L

M/S

Accident conditions

Scram and ECCS initiation

PCV cooling system startup

Residual heat removal

A/L

A/L

A/L

M

M

M

M

M/S

M/S

M : Manual

A/F

: Automation by Feedback Control