Добавил:
Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
01 POWER ISLAND / Overview of Light Water.docx
Скачиваний:
1
Добавлен:
01.04.2025
Размер:
8.88 Mб
Скачать

Table of Contents

Introduction

Foreword

Members

Chapter 1 General

  1. History of Nuclear Power Plant Development 1-1

  2. Experiences in Nuclear Power Generation and Safety Research 1-4

  3. Comparison of Schemes of Nuclear and Thermal Power Generation 1-7

  1. Effective Reactor Fuel Loading 1-7

  2. Reactor Self-Regulation Characteristics 1-7

  3. Reactor Decay Heat 1-8

  4. Confinement of FPs 1-8

  5. Reactor Steam Conditions 1-8

  1. Safety Design Principles for NPPs 1-9

  1. Prevention of Occurrence of Abnormal Conditions (Level 1) 1-9

  2. Prevention of Expansion of an Abnormal Event (Level 2) 1-10

  3. Prevention of Abnormal Release of Radioactive Materials and Mitigation of Consequence (Level 3) 1-10

  1. 0 utline of Laws, Regulations and the Regulatory Framework 1-11

  1. Domestic Framework 1-11

  2. IAEA Safety Standards 1-13

Chapter 2 Systems of BWR Nuclear Power Plants

    1. General Design Philosophy 2-1

      1. Fuel Rods - 2-1

      2. Reactor Core 2-1

      3. Reactor Coolant Pressure Boundary 2-2

      4. Engineered Safety Features 2-3

      5. Instrumentation and Control System 2-3

      6. Other Systems 2-4

    2. Plant Layout 2-5

      1. Plot Plan 2-5

      2. Main Buildings and Auxiliary Buildings 2-6

    3. Nuclear Reactor and Core 2-17

      1. Fuel Rod and Fuel Assembly 2-17

      2. Reactor and Reactor Core 2-22

    4. Primary Coolant System 2-37

      1. System Summary 2-37

      2. Key Components 2-40

    5. Turbine System 2-47

      1. System Summary 2-47

      2. Main Turbine System and Auxiliary Equipment 2-48

      3. Main Steam System and Condensate Feed Water System 2-51

    6. Instrumentation and Control System 2-57

      1. Reactor Instrumentation and Control System 2-57

      2. Main Control Room 2-67

      3. Process Instrumentation System 2-74

    7. Engineered Safety Features 2-79

NSRA, Japan

viii

      1. Design Policy of Engineered Safety Features 2-79

      2. Emergency Core Cooling System (ECCS) 2-81

      3. Reactor Containment Facility 2-87

    1. Reactor Auxiliary Systems 2-92

      1. Residual Heat Removal (RHE) System 2-92

      2. Reactor Core Isolation Cooling (RCIC) System 2-94

      3. Reactor Water Cleanup (CUW) System 2-96

      4. Fuel Pool Cooling and Cleanup (FPC) System 2-97

      5. Reactor Building Cooling Water (RCW) System and Reactor Building Cooling Seawater (RCWS) System 2-100

      6. Fuel Handling and Storage System 2-101

    2. Radioactive Waste Treatment Systems 2-102

      1. Gaseous Waste Treatment System 2-102

      2. liquid Waste Treatment System 2-103

      3. Solid Waste Treatment System 2-105

    3. Electrical System 2-107

      1. Main Generator and Auxiliaries 2-107

      2. Major Transformers and Switchyard System 2-108

      3. Plant Auxiliary Power System 2-108

    4. Plant Auxiliary Systems 2-111

      1. Plant Water System 2-111

      2. Auxiliary Steam System (House Boiler System) 2-111

      3. Compressed Air Supply System 2-112

      4. Heating, Ventilating and Air Conditioning (HVAC) System 2-113

      5. Fire Protection System 2-117

    5. Advanced BWR (ABWR) 2-118

      1. Design Principles 2-118

      2. Plant Configuration 2-119

      3. Enhanced Safety 2-123

      4. Enhanced Operability and Maneuverability 2-127

Chapter 3 Systems of PWR Nuclear Power Plants

  1. General Design Philosophy 3-1

  1. Fuel Rods 3-1

  2. Reactor Core 3-1

  3. Reactor Coolant Pressure Boundary 3-2

  4. Engineered Safeguard Systems 3-2

  5. Instrumentation and Control System 3-3

  6. Other Systems 34

  1. Plant Layout 3-5

  1. Plot Plan 3-5

  2. Equipment Arrangement 3-7

  3. Plant Layout Considerations 3-10

    1. Hie Nuclear Reactor and Reactor Core 3-16

      1. Fuel Rods and Fuel Assemblies 3-16

      2. Reactor and Reactor Core 3-20

    2. Reactor Coolant System 3-34

      1. Outline 3-34

      2. Main Components 3-35

    3. Turbine System 348

      1. Outline 348

      2. Main Turbine and Its Appurtenances 348

lx

NSRA, Japan

      1. Main Steam System 3-53

      2. Condensate, Feed water System and Other Related Systems 3-54

    1. Instrumentation and Control System 3-59

      1. Reactor Instru mentation and Control System 3-59

      2. Main Control Room 3-75

      3. Process Instrumentation System 3-79

      4. Radiation Monitoring System 3-79

    2. Engineered Safeguard Systems 3-82

      1. Systems and Tlieir Functions 3-82

      2. Emergency Core Cooling System (ECCS) 3-83

      3. Reactor Containment Facility 3-87

      4. Containment Spray System 3-90

      5. Annulus Air Clean-up System 3-92

      6. Safety Component Room Air Clean-up System 3-93

    3. Reactor Auxiliary Systems 3-95

      1. Chemical and Volume Control System (CVCS) 3-95

      2. Residual Heat Removal System (RHRS) 3-98

      3. Component Cooling Water System (CCWS) 3-100

      4. Sea Water System (SWS) 3-102

      5. Spent Fuel Pit Cooling and Clean-up System 3-102

      6. Fuel Handling System 3-103

    4. Radioactive Waste Disposal System 3-105

      1. Gaseous Waste Disposal System 3-105

      2. liquid Waste Disposal System 3-107

      3. Solid Waste Disposal System 3-110

    5. Electrical Systems 3-114

      1. Main Generators and Appurtenances 3-114

      2. Major Transformers and Transmission System 3-115

      3. Plant Auxiliary Power Supply Systems 3-116

    6. Plant Auxiliary Systems 3-120

      1. Water Supply and Treatment System 3-120

      2. Auxiliary Steam System 3-120

      3. Compressed Air Systems 3-121

      4. Heating, Ventilating and Air Conditioning Systems 3-123

      5. Fire Protection System 3-126

    7. Advanced Pressurized Water Reactor (APWR) 3-128

      1. Objectives of Design and Distinctive Features 3-128

      2. Plant Design 3-129

      3. Conclusion 3-137

Chapter 4 Operation and Maintenance of BWR Plants

  1. Plant Operation 4-2

  1. Plant Startup 4-2

  2. Normal Plant Operation 4-7

  3. Plant Shutdown 4-10

  1. Plant Maintenance 4-12

  1. Concept of Maintenance Management 4-12

  2. Periodic Inspections and Licensee’s Periodic Inspections 4-13

  3. Procedure and Work Schedule of Periodic Inspections 4-15

  4. In-service Inspections (TSIs) 4-23

  5. Checks and Maintenance during Plant Operation 4-24

NSRA, Japan

x