STANDARD TECHNICAL FEATURES |
OF |
BTG SYSTEM FOR SUPERCRITICAL |
660/ 800 MW THERMAL UNITS |
Government of India |
Ministry of Power |
Central Electricity Authority |
New Delhi – 110066 |
JULY, 2013 |

STANDARD TECHNICAL FEATURES
OF
BTG SYSTEM FOR SUPERCRITICAL 660/ 800 MW THERMAL UNITS
Government of India
Ministry of Power
Central Electricity Authority
New Delhi
JULY, 2013



Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Units
STANDARD TECHNICAL FEATURES OF BTG SYSTEM FOR SUPERCRITICAL 660/800 MW THERMAL UNITS
CONTENTS
Chapter/ |
Description |
Page No. |
|
Clause No. |
|
|
|
|
|
|
|
|
|
Section-1: General |
|
|
|
|
|
1. |
Introduction |
1 |
|
|
|
|
|
|
1.1 |
Supercritical technology |
1 |
|
|
|
|
|
1.2 |
Implications on design/ construction |
2 |
|
|
|
|
2. |
Operating Capability of Plant |
6 |
|
|
|
|
|
3. |
General Technical Requirements |
7 |
|
|
|
|
|
4. |
Layout Considerations |
9 |
|
|
|
|
|
5. |
Performance Guarantees |
12 |
|
|
|
|
|
|
5.1 |
General requirements |
12 |
|
|
|
|
|
5.2 |
Guarantees under Category-I |
13 |
|
|
|
|
|
5.3 |
Guarantees under Category-II |
14 |
|
|
|
|
|
5.4 |
Guarantees under Category-III |
14 |
|
|
|
|
|
5.5 |
Test codes, test conditions etc. |
20 |
|
|
|
|
|
|
Section 2: Steam Generator & Auxiliaries |
|
|
|
|
|
6. |
Steam Generator |
24 |
|
|
|
|
|
|
6.1 |
Type |
24 |
|
|
|
|
|
6.2 |
Rating of steam generator |
24 |
|
|
|
|
|
6.3 |
Fuels |
25 |
|
|
|
|
|
6.4 |
Salient design features and capabilities |
25 |
|
|
|
|
|
6.5 |
Specifications of equipment and systems |
29 |
|
|
|
|
7. |
Draft Fans, Duct Work and Dampers |
53 |
|
|
|
|
|
|
7.1 |
Forced draft and induced draft fans |
53 |
|
|
|
|
|
7.2 |
Duct work |
57 |
|
|
|
|
|
|
i |
|

Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Units
|
7.3 |
Dampers |
60 |
|
|
|
|
8. |
Coal Preparation and Firing System |
62 |
|
|
|
|
|
|
8.1 |
General |
62 |
|
|
|
|
|
8.2 |
Bunker shut off gates, RC feeder inlet & outlet gates |
62 |
|
|
|
|
|
8.3 |
Coal chutes |
62 |
|
|
|
|
|
8.4 |
Raw coal feeders |
63 |
|
|
|
|
|
8.5 |
Coal pulverizers |
64 |
|
|
|
|
|
8.6 |
Pulverised coal pipes |
68 |
|
|
|
|
|
8.7 |
Coal burners |
69 |
|
|
|
|
|
8.8 |
Primary air fans |
71 |
|
|
|
|
9. |
Fuel Oil Firing System |
73 |
|
|
|
|
|
|
9.1 |
General |
73 |
|
|
|
|
|
9.2 |
Fuel oil preparation and firing system |
74 |
|
|
|
|
10. |
Electrostatic Precipitator |
79 |
|
|
|
|
|
|
10.1 |
Design data |
79 |
|
|
|
|
|
10.2 |
System description |
81 |
|
|
|
|
|
10.3 |
Service conditions |
81 |
|
|
|
|
|
10.4 |
Location and layout requirements |
81 |
|
|
|
|
|
10.5 |
Maintenance requirements |
82 |
|
|
|
|
|
10.6 |
Model study |
82 |
|
|
|
|
|
10.7 |
Gas distribution system |
82 |
|
|
|
|
|
10.8 |
Collecting plates (electrodes) |
83 |
|
|
|
|
|
10.9 |
Discharge electrodes |
83 |
|
|
|
|
|
10.10 |
Rapping system |
83 |
|
|
|
|
|
10.11 |
Dust hoppers |
84 |
|
|
|
|
|
10.12 |
Casing |
85 |
|
|
|
|
|
10.13 |
Penthouse covering |
86 |
|
|
|
|
|
10.14 |
Thermal insulation |
86 |
|
|
|
|
11. |
VOID |
|
|
|
|
|
|
ii

Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Units
Section 3: Steam Turbine Generator & Auxiliaries
12. |
Steam Turbine |
87 |
|
|
|
|
|
|
12.1 |
General |
87 |
|
|
|
|
|
12.2 |
Turbine casing |
90 |
|
|
|
|
|
12.3 |
Turbine rotor |
91 |
|
|
|
|
|
12.4 |
Nozzles and blades |
91 |
|
|
|
|
|
12.5 |
Bearings |
92 |
|
|
|
|
|
12.6 |
Turning gear |
92 |
|
|
|
|
|
12.7 |
Gland sealing system (steam turbine and TD-BFP |
92 |
|
|
drive) |
|
|
|
|
|
|
12.8 |
Steam admission valves (emergency stop, reheat stop, |
93 |
|
|
interceptor stop valves and control valves) |
|
|
|
|
|
|
12.9 |
Nonreturn valves (NRVs) |
93 |
|
|
|
|
|
12.10 |
Insulation (steam turbine and BFP drive turbine) |
94 |
|
|
|
|
|
12.11 |
Turbine governing system |
94 |
|
|
|
|
|
12.12 |
Turbine protective devices |
95 |
|
|
|
|
|
12.13 |
Unloading devices |
95 |
|
|
|
|
|
12.14 |
Turbine lubricating oil system |
96 |
|
|
|
|
|
12.15 |
Turbine lubricating oil purification system |
96 |
|
|
|
|
|
12.16 |
Turbine control fluid system |
97 |
|
|
|
|
|
12.17 |
Central turbine lubricating oil storage oil and |
97 |
|
|
purification system |
|
|
|
|
|
13. |
Steam Condensing Plant |
98 |
|
|
|
|
|
|
13.1 |
General requirement |
98 |
|
|
|
|
|
13.2 |
Condenser |
99 |
|
|
|
|
|
13.3 |
Condenser air evacuation pumps |
102 |
|
|
|
|
|
13.4 |
Condenser on load tube cleaning system |
103 |
|
|
|
|
|
13.5 |
Condensate extraction pumps (CEP) |
103 |
|
|
|
|
|
13.6 |
Strainers at suction of condensate extraction pumps |
105 |
|
|
|
|
|
13.7 |
Drip pumps (if applicable) |
106 |
|
|
|
|
|
13.8 |
Debris filters (as applicable for sea water based system) |
106 |
|
|
|
|
|
|
iii |
|

Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Units
14. |
Feed Water Heating Plant and Flash Tanks |
|
107 |
||
|
|
|
|
|
|
|
14.1 |
General requirements |
|
107 |
|
|
|
|
|
|
|
|
14.2 |
Low pressure heaters and drain cooler |
|
108 |
|
|
|
|
|
|
|
|
14.3 |
Deaerator |
|
109 |
|
|
|
|
|
|
|
|
14.4 |
High pressure heaters |
|
110 |
|
|
|
|
|
|
|
|
14.5 |
Flash tanks |
|
111 |
|
|
|
|
|
|
|
15. |
Boiler Feed Pumps |
|
113 |
||
|
|
|
|
|
|
|
15.1 |
Number and type |
|
113 |
|
|
|
|
|
|
|
|
15.2 |
Pump sizing |
|
113 |
|
|
|
|
|
|
|
|
15.3 |
Design requirements |
|
114 |
|
|
|
|
|
|
|
|
15.4 |
Operational and maintenance requirements |
|
116 |
|
|
|
|
|
|
|
|
15.5 |
Mechanical seals |
|
117 |
|
|
|
|
|
|
|
|
15.6 |
Hydraulic coupling and gear boxes |
|
117 |
|
|
|
|
|
|
|
|
15.7 |
Drive turbine |
|
118 |
|
|
|
|
|
|
|
16. |
Generator and Auxiliary Systems |
|
122 |
||
|
|
|
|
|
|
|
16.1 |
Generator |
|
122 |
|
|
|
|
|
|
|
|
16.2 |
Generator auxiliary systems |
|
129 |
|
|
|
|
|
|
|
|
|
Section 4: Control & Instrumentation System |
|
||
|
|
|
|
||
17. |
Control & Instrumentation System |
|
135 |
||
|
|
|
|
|
|
|
17.1 |
General |
|
135 |
|
|
|
|
|
|
|
|
17.2 |
Distributed digital control, monitoring and information |
|
137 |
|
|
|
system (DDCMIS) |
|
|
|
|
|
|
|
|
|
|
17.3 |
SG & TG related other control & instrumentation |
|
161 |
|
|
|
systems/ equipments |
|
|
|
|
|
|
|
|
|
|
17.4 |
Plant performance, analysis, diagnosis & optimization |
|
168 |
|
|
|
(PADO) software |
|
|
|
|
|
|
|
|
|
|
17.5 |
PLC based miscellaneous control systems |
|
169 |
|
|
|
|
|
|
|
|
Section 5: Miscellaneous Systems, Piping, Valves, Insulation etc. |
|
|||
|
|
|
|
||
18. |
Power Cycle Piping, Valves and Thermal Insulation |
|
171 |
||
|
|
|
|
||
|
18.1 |
Power cycle piping |
|
|
171 |
|
|
|
|
|
|
|
18.2 |
Control valves |
|
|
180 |
|
|
|
|
|
|
|
|
iv |
|
|

Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Units
|
18.3 |
Thermal insulation |
181 |
|
|
|
|
|
18.4 |
Refractories |
184 |
|
|
|
|
19. |
Steam Turbine HP-LP Bypass System |
185 |
|
|
|
|
|
|
19.1 |
Purpose |
185 |
|
|
|
|
|
19.2 |
General requirements |
185 |
|
|
|
|
20. |
Auxiliary Steam Pressure Reducing & Desuperheating |
187 |
|
|
|
System |
|
|
|
|
|
21. |
Equipment Cooling Water (ECW) System |
189 |
|
|
|
|
|
|
21.1 |
General |
189 |
|
|
|
|
|
21.2 |
System requirements |
189 |
|
|
|
|
|
21.3 |
Design requirements |
190 |
|
|
|
|
|
21.4 |
Sizing criteria |
193 |
|
|
|
|
22. |
Condensate Polishing Plant |
194 |
|
|
|
|
|
|
22.1 |
General |
194 |
|
|
|
|
|
22.2 |
Salient design data |
194 |
|
|
|
|
|
22.3 |
System requirements for CPU |
195 |
|
|
|
|
|
22.4 |
System requirements for external regeneration facility |
197 |
|
|
|
|
|
22.5 |
Control and operation of condensate polishing plant |
199 |
|
|
|
|
23. |
Chemical Dosing System |
201 |
|
|
|
|
|
|
23.1 |
General |
201 |
|
|
|
|
|
23.2 |
Oxygen dosing system |
201 |
|
|
|
|
|
23.3 |
All volatile treatment (AVT) system |
202 |
|
|
|
|
24. |
EOT Crane |
203 |
|
|
|
|
|
Annexure- 1 : |
CEA letter dated 24th August, 2009 constituting the |
205: 207 |
|
|
|
Committee |
|
|
|
|
|
v

Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Units
SECTION -1
GENERAL