Maasvlakte"CCS"Project"C.V."

2.Introduction-to-FEED-study-report-

In"July"2009,"Maasvlakte"CCS"Project"C.V."(‘MCP’)"submitted"its"project"proposal"to"the"European" Commission," to" apply" for" funding" under" the" framework" of" the" European" Energy" Program" for" Recovery" (‘EEPR’)." This" marked" the" start" of" the" ‘ROAD" project’" (‘Rotterdam" Opslag" en" Afvang" Demonstratieproject’;"Rotterdam"Storage"and"Capture"Demonstration"project).""

2.1Developing-the-ROAD-project-

In" this" report," the" results" of" the" front:end" engineering" design" (‘FEED’)" study" for" the" capture" plant"as"performed"by"Fluor"will"be"summarized."This"FEED"study,"however,"was"only"part"of"the" work"performed"on"the"ROAD"project"during"its"development"phase."In"parallel,"various"other" activities" were" executed" to" develop" the" project" to" such" an" extent" that" the" final" investment" decision"could"be"taken"by"the"end"of"2011."This"section"aims"to"show"the"project"development" context" within" which" the" FEED" studies" were" performed" by" two" competing" suppliers" (see" also" [1])." It" will" briefly" introduce" the" reader" to" phased" project" development" approaches," with" the" framework" developed" by" the" Global" CCS" Institute" taking" a" central" role" [2]." Subsequently," a" rough"sketch"of"the"activities"performed"by"ROAD"in"parallel"with"the"FEED"study"is"provided.""

2.1.1Project-development-framework-

Using" a" structured" stage:gated" project" management" process" is" generally" identified" as" a" key" factor"in"successfully"delivering"capital"expenditure"projects."An"information:driven"stage:gated" process"facilitates"a"logical"sequence"of"project"development"activities,"ensuring"that"all"relevant" information"is"available"in"time"and"that"all"important"issues"are"resolved"before"further"steps" are"taken"[3]."Such"a"process"is"generally"applied"within"both"mother"companies"of"Maasvlakte" CCS"Project"C.V.""

"

The"Global"Carbon"Capture"and"Storage"Institute"is"currently"developing"a"project"development"

framework"that"is"tailored"for"the"development"of"CCS"projects."The"framework"comprises"three"

levels:"

•On"the"highest"level,"six"stages"in"the"development"of"a"CCS"project"are"defined,"fully" aligned"with"oil"and"gas"industry"standard"practice:"identify,"evaluate,"define,"execute," operate"and"closure."For"each"of"these"phases"the"generic"approach,"actions"to"be"taken" and" goals" to" be" achieved" are" set" out" on" one" A3" page." This" is" done" for" the" project" in" general" and" for" each" of" the" three" steps" in" the" CCS" value" chain" (capture," transport," storage).""

•On" the" second" level," an" overview" is" provided" of" around" 20" relevant" topics" specific" to" each"of"the"three"steps"in"the"CCS"value"chain,"setting"out"the"relevant"steps"to"be"taken" on"each"of"the"topics"in"each"of"the"six"development"phases.""

•On"the"third"level,"the"actions"proposed"to"be"taken"on"the"second"level"are"elaborated.""

"

The"current"draft"of"the"highest"level"framework"as"well"as"the"current"version"of"the"second" level"document"focusing"on"capture"can"be"found"in"the"annexes"to"this"report.""

2.1.2ROAD-–project-development-status-during-“define”-phase-

Phrased"in"terms"of"the"Global"CCS"Institute’s"CCS"project"development"framework,"ROAD"is"at" the" time" of" writing" this" report" in" its" “define”" stage;" the" last" phase" before" execution" of" the" project"starts."As"the"phase’s"name"suggests,"the"define"phase"is"focused"on"defining"the"project" to" such" an" extent" that" a" final" investment" decision" can" be" taken" based" on" the" available" information." In" this" phase" the" technical" and" economic" viability" of" a" project" needs" to" be" demonstrated." Basic" engineering" (FEED" study)," cost" estimating," contractor" selection" and" permitting"are"the"key"activities"in"this"phase"of"the"project.""

"

!Non%confidential!FEED!study!report!

!

11/79"

Maasvlakte"CCS"Project"C.V."

In" the" table" below," the" status" achieved" by" the" ROAD" project" during" the" ‘define’" phase" is" summarized,"using"the"second"level"of"the"Institute’s"framework"as"a"basis"[2]."In"the"remainder" of"the"report"only"the"FEED"study"for"the"capture"plant,"as"made"by"Fluor"and"mentioned"under" “power"plant"–"capture"facility”"in"the"table"below,"will"be"discussed.""

"

Table"2.1:"Status"ROAD"project"

Activity-

ROAD-status-during-‘define’-phase-

Project"Context"and"

Board"Paper"(incl."project"status,"strategic"fit,"organizational"

Opportunity"Definition"and"

setup,"costs"&"financial"metrics,"risks"&"risk"mitigation,"

Recommendation"

procurement,"permitting,"stakeholder"management,"execution"

 

planning)"available.""

Project"Development"

Project"execution"plans"in"place.""

Approach"

 

Site"Selection"

Site"selection"not"applicable"for"ROAD"(MPP3"already"under"

 

construction).""

 

Soil"investigation"performed."

Stakeholder"and"External"

Stakeholder"management"plan"&"team"in"place."

Relations"

Public"engagement"activities"ongoing."

Environment"

Environmental"studies"completed."

 

Environmental"Impact"Assessment"submitted"to"competent"

 

authorities.""

 

Permit"applications"submitted."

Health"and"Safety"

Several"risk"assessments"completed,"including"HAZID,"HAZOP,"

 

maximum"credible"accident"study"and"reliability"assessment.""

 

A"rough"outline"of"timing"of"finalizing"different"H&S"systems"

 

and"documents"has"been"prepared.""

 

A"safety"management"team"for"construction"and"commissioning"

 

is"still"to"be"established,"as"are"detailed"procedures"on"site"

 

surveys."However,"coordination"risks"on"site"are"being"

 

investigated."

Fuel"Supply"

Not"applicable"for"ROAD"(E.ON"MPP3"scope)."

Power"Plant"–"Capture"

Power"plant"engineering"not"applicable"(E.ON"MPP3"scope)."

Facility"

FEED"study"capture"plant"completed.""

 

Value"engineering"capture"plant"completed.""

 

Detailed"engineering"started."

 

Basic"design"interfaces"completed.""

CO2"Product"

CO2"specification"is"fixed,"including"impurities,"pressures"and"

 

temperatures."

 

Compressor"and"dehydration"process"and"design"has"been"

 

assessed"in"FEED."

 

CO2"transport"pipeline"has"been"specified"

Infrastructure"

Not"applicable"for"ROAD"(E.ON"MPP3"scope)."

Project"Delivery"

EPC"contract"capture"plant"supplier"ready"for"signature.""

 

Contract"with"storage"partner"ready"for"signature.""

Capital"/"Operating"Costs"

Cost"estimates"(+/:"10:15%)"available.""

Operations"

Investigation"performed"on"location"of"control"room,"combine"

 

with"MPP3"or"separate."Operation"will"be"possible"from"both"

 

locations"

Revenue"and"Trading"(CO2"

Utilities"agreement"(incl."power,"steam"and"utilities"supply,"ETS"

Product"Only)"

compensation,"operating/dispatch"principles)"with"E.ON."

!Non%confidential!FEED!study!report!

!

12/79"

 

Maasvlakte"CCS"Project"C.V."

 

 

Management"Systems"

Allocation"of"the"responsibilities"along"the"entire"CCS"chain"

 

agreed."

 

Partner"agreements"ready"for"signature.""

Ownership"and"Legal"

Project"ownership"and"governance"structure"in"place."

IP"Management"

IP"system"has"been"set"up"to"share"info"on"E.ON"power"plant"

 

with"ROAD"

 

IP"of"capture"supplier"covered"in"EPC"contract"and"license"

 

agreement."

Financial"Analysis"

Detailed"discounted"cash:flow"model"in"place."

Risk"

Risk"workshops"held"with"all"disciplines"in"project"team."

 

Risk"register"(incl."cost/schedule"impact,"mitigating"measures,"

 

residual"risk)"in"place."

Funding"

Funding"agreements"with"European"Commission,"Government"

 

of"the"Netherlands"and"Global"CCS"Institute"in"place."

Future"Work"Plan"

Project"execution"plans"in"place.""

Status"of"Studies"

Various"technical"studies"on"all"parts"of"the"CCS"value"chain"

 

completed."

 

Pre:FID"project"review"performed.""

2.2Overview-other-ROAD-related-Global-CCS-Institute-reports-

Besides"this"FEED"study"report,"ROAD"will"deliver"several"other"special"reports"to"the"Global"CCS"

Institute"in"2011."In"this"section,"the"content"of"these"special"reports"will"be"described."For"the"

actual"reports"themselves,"please"refer"to"the"Institute’s"website."

2.2.1Capture-technology-selection-methodology-

The" selection" process" for" a" capture" technology" supplier" is" described" in" ROAD’s" capture" technology" selection" methodology" report" [1]." In" that" report," the" selection" methodology" developed"by"the"ROAD"project"team"is"described"and"evaluated,"starting"with"the"request"for" proposal" for" preliminary" studies" and" ending" with" the" final" selection" of" the" capture" plant" supplier."In"Appendix"1"an"overview"of"the"selection"process"can"be"found.""

Two"parallel"FEED"studies"were"part"of"the"selection"process."The"FEED"study"described"in"this" report" is" the" one" conducted" by" the" winning" supplier." Not" all" details" of" the" design" can" be" disclosed"as"some"part"is"proprietary"information"of"the"supplier."Nevertheless"the"information" in"this"document"is"sufficient"to"get"a"good"understanding"of"the"design"of"the"future"capture" plant"of"the"ROAD"project.""

2.2.2Permitting-process-

The"ROAD"project"is"a"first"of"its"kind."Therefore"the"permitting"process"is"quite"interesting."First"

the"project"team"had"to"find"out"which"permits"were"to"be"applied"for."The"FEED"study"results"

have"been"used"as"input"for"the"permit"application,"as"the"required"emission"values"could"not"be" based" on" measurements" on" existing" installations." It" will" be" possible" to" find" information" on" permitting" in" ROAD’s" permitting" process" report" [4]" and" in" the" environmental" impact" assessment,"which"will"become"public"by"October"2011.""

2.2.3Mitigating-project-risk-&-handling-business-risk-

The"special"reports"on"mitigating"project"risk"[5]"and"handling"business"risks"[6]"will"explain"the"

risk"management"approach"taken"by"ROAD."In"[5]"a"summary"of"the"risk"register,"which"contains" the" major" risks," mitigating" actions" and" residual" risks," will" be" included." These" risks" include" financial"and"technical"risks."The"special"report"on"handling"and"allocation"of"business"risks"([6])," will"describe"on"a"high"level"the"consortium"structure,"commercial"risk"analysis,"overview"of"key" risks" to" be" addressed" for" the" final" investment" decision" and" key" commercial" considerations" in" general."

!Non%confidential!FEED!study!report!

!

13/79"

Maasvlakte"CCS"Project"C.V."

2.2.4Stakeholder-management-

In" the" report" on" stakeholder" management" [7]" ROAD’s" major" stakeholders" will" be" identified." These"include"permitting"authorities,"local,"national"and"EU"government"bodies"and"the"public." Stakeholder"management"will"be"described"in"general"and"public"outreach,"permitting"and"the" regulatory"process"will"receive"particular"attention."

2.2.5Execution-strategy-

ROAD’s"project"execution"strategy"will"be"described"in"the"special"report"on"execution"strategy"

[8]."This"report"will"contain"for"example"a"high"level"project"schedule,"organizational"structure"

and"discussions"on"execution"related"aspects"of"the"environmental"impact"assessment,"

contracting,"finance"and"stakeholder"management.""

2.3Structure-of-report-

The"structure"of"this"report"on"the"winning"FEED"study"for"ROAD’s"capture"plant"is"as"follows:""

•Chapter"3"describes"the"capture"FEED"scope"and"boundaries"

•Chapter"4"describes"the"process"of"the"capture"plant"and"the"compression"

•Chapter"5"describes"the"health,"safety"and"environmental"issues""

•Chapter"6"describes"the"CO2"stream"

•Chapter"7"describes"financial"and"scheduling"aspects"of"capture"plant"and"compressor."

"

This"report"is"part"of"the"knowledge"to"be"shared"under"the"Funding"Agreement"between"the"

Global"Carbon"Capture"and"Storage"Institute"(‘Global"CCS"Institute’)"and"Maasvlakte"CCS"Project"

C.V."

-

!Non%confidential!FEED!study!report!

!

14/79"

Maasvlakte"CCS"Project"C.V."

3.Capture-FEED-scope-and-boundaries-

The"ROAD"project"has"selected"a"final"supplier"for"the"capture"plant"based"on"multiple"rounds"of" studies."The"capture"FEED"study"phase"was"one"of"these"rounds."The"complete"description"of" the"selection"procedure"can"be"found"in"the"capture"technology"selection"report"[1]."

As"starting"point"of"each"round,"the"supplier"received"a"technical"specification"from"the"ROAD" project." In" this" description," the" project" was" explained" and" boundary" conditions" and" quality" standards"to"be"implemented"in"the"study"phase"were"submitted."

The" result" was" a" very" detailed" document," of" over" 150" pages," excluding" appendices." In" this" chapter"the"main"issues"are"highlighted."

3.1.1Power-plant-MPP3-

The" capture" suppliers" were" given" information" on" MPP3" with" more" details" on" the" general" installation:"

Base!installation:!E.ON!Maasvlakte!Power!Plant!3!(Rotterdam,!The!Netherlands)!

•

Output!

:!1.070!MWe!

•

Efficiency!

:!46%!(LHV)!

•

Operational!

:!End!2012!

•Capture!ready!

Besides" power" plant" data," also" information" on" general" aspects" like" weather" conditions," surroundings"and"soil"investigations"was"provided."

3.1.2Capture-plant-design-

In"the"specification"the"design"philosophy"was"described"with"this"statement"as"main"message:"

The!capture"plant!process!design!should!be!optimized!to!minimize!through!life!cycle!costs!of!the! project,!balancing!capital!costs!against!reduced!power,!steam!and!utilities!consumption!without! compromising!plant!design!performance,!availability!and!operability.!The!design!should!also!be! sufficiently!flexible!to!enable!stable!operation!at!reduced!flue!gas!flow!and!a!rapid!response!to! change!in!flue!gas!inlet!conditions.!

As"this"demonstration"project"is"expected"to"be"a"loss"making"project,"the"aim"is"not"to"have"the"

highest"possible"availability,"but"to"seek"a"balance"between"costs"and"plant"performance."

3.1.3Soil-situation-

An"example"of"the"specifications"given"to"the"supplier"is"the"soil"profile:"

The!general!soil!profile!at!the!site!is!as!follows:!

•Groundwater!level!at!ca.!+!2m!NAP!(Normaal!Amsterdams!Peil,!reference!of!height)!

•Loose! to! densely! compacted! sand! with! local! laminations! of! clay! from! surface! level! to! level!%20!m!NAP!

•1st!clay!layer!from!level!%20!m!to!%22!m!NAP!

•Densely! compacted! sand! from! below! ca.! %22! m! NAP! (used! as! bearing! level! for! MPP3! power!island!piles)!

•2nd!clay!layer!at!ca.!–!40!m!NAP!

•Densely!compacted!sand!below!2nd!clay!layer!

"

By"providing" such"detailed" information" the" capture" plant" supplier"was"in" the" best" position" to" design"a"capture"plant"according"to"ROAD´s"wishes.""

"

-

 

!Non%confidential!FEED!study!report!

!

15/79"

Maasvlakte"CCS"Project"C.V."

4.Capture-and-compression-process-

In"this"chapter"the"capture"and"compression"process"are"described."The"information"is"based"on"

the"FEED"study"carried"out"by"the"winning"FEED"supplier."The"information"given"in"this"report"is"

non:confidential,"but"can"still"be"valuable"to"assess"the"process.""

4.1Process-description-of-capture-and-compression-

This"section"provides"the"process"description"for"the"Econamine"FG"PlusSM"(EFG+)"CO2"capture" and" compression" plant" for" the" ROAD" project." The" purpose" of" the" proposed" EFG+" plant" is" to" recover" 90%" of" the" total" CO2" available" in" a" 250" MW:equivalent" slip" stream" of" flue" gas" from" Maasvlakte" Power" Plant" 3" (MPP3)," a" 1,070" MW" (net" electric)" advanced" supercritical" power" plant." The" EFG+" Plant" produces" approximately" 4,057" t/day" of" CO2" (dry" basis)" that" will" be" compressed"and"sent"to"the"EFG+"plant"battery"limit"to"be"transported"through"a"pipeline"to"off: shore"storage"in"the"North"Sea."

In" Appendix" 2" the" Process" Flow" Diagrams" can" be" found," please" refer" to" this" appendix" for" the" codes"in"the"description"below."

4.1.1Flue-gas-cooling-and-trim-SOX-removal-

The"Process"Flow"Diagram"of"this"section"can"be"found"in"Appendix"2"on"page"43.""

The" flue" gas" feed" to" the" EFG+" plant" comes" from" the" Flue" Gas" Desulfurization" (FGD)" unit" of" MPP3."Flue"gas"from"the"FGD"unit"is"first"routed"to"the"Direct"Contact"Cooler"(DCC)"(3"0HKB10" BB001)" for" both" cooling" and" trim" SOX" removal." The" flue" gas" cooling" is" done" in" the" quench" section"of"the"DCC"by"circulating"water."Circulating"water"is"drawn"from"the"bottom"of"the"DCC" to"the"DCC"Water"Cooler"(30HKB30"AC001/2)"by"DCC"Circulation"Pump"(3"0HKB20"AP001/2)"and" returned" to" the" top" of" the" column’s" quench" section." The" circulating" water" is" heated" by" the" cooling"and"condensing"of"water"vapor"in"the"flue"gas."

Excess" water" produced" in" the" DCC" from" the" condensing" of" water" vapor" in" the" flue" gas" is" neutralized"using"20"wt%"NaOH."The"neutralized"excess"water"stream"is"held"temporarily"in"the" DCC"Water"Neutralization"Tank"(3"0HKB50"BB001)"and"sent"to"the"plant"battery"limit"using"the" DCC"Excess"Water"Pump"(3"0HKB60"AP001)."Cooled"flue"gas"from"the"quench"section"of"the"DCC" contacts"a"circulating"scrubbing"solution."The"scrubbing"solution"is"circulated"to"the"top"of"the" column" by" DCC" Scrubbing" Solution" Pump" (3" 0HKE70" AP001/2)." A" 20" wt%" sodium" hydroxide" (NaOH)"solution"supplied"by"the"DCC"NaOH"Injection"Pump"(3"0HKE60"AP001/2),"along"with"a" slip" stream" of" cooled" DCC" water" taken" downstream" of" the" DCC" Water" Cooler," are" fed" to" the" suction" of" the" DCC" Scrubbing" Solution" Pump." A" blowdown" slip" stream" is" taken" from" the" circulating" scrubbing" solution" loop" which" could" be" used" as" make:up" to" the" power" plant" after" treatment."The" cooled," desulfurized" flue" gas" passes" through" a"mesh" mist" eliminator" and" exits" the"top"of"the"column"where"it"is"routed"to"the"Blower"(3"0HKC10"AN001)."The"20"wt%"sodium" hydroxide"solution"is"made"by"diluting"a"50"wt%"NaOH"stock"solution,"which"is"stored"in"50"wt%" NaOH"Storage"Tank"(3"0HKE20"BB001)"using"demineralized"water."

4.1.2Flue-gas-blower-and-CO2-absorption-

The"Process"Flow"Diagram"of"this"section"can"be"found"in"Appendix"2"on"page"43.""

The" Blower" (3" 0HKC10" AN001)," located" downstream" of" the" DCC," is" used" to" overcome" the" pressure"drop"through"the"EFG+"plant."From"the"Blower,"the"flue"gas"enters"the"bottom"of"the" Absorber"(3"0HKD10"BB001)"and"flows"upward"through"the"packed"column"beds,"where"it"reacts" with"the"EFG+"lean"solvent."A"total"draw"of"semi:rich"solution"is"extracted"from"the"column"and" sent"by"the"Absorber"Intercooler"Pump"(3"0HKD20"AP001/2)"through"the"Absorber"Intercooler" (3" 0HKD30" AC001:3)" where" the" solution" is" cooled" before" being" returned" to" the" Absorber." Treated" gas" from" the" absorption" section" enters" the" wash" section" at" the" top" of" the" Absorber"

!Non%confidential!FEED!study!report!

!

16/79"

Maasvlakte"CCS"Project"C.V."

where" EFG+" solvent" in" the" vapor" phase" is" captured" by" a" circulating" wash" water" loop." Wash" water"is"drawn"from"the"bottom"of"the"wash"section"and"sent"through"the"Wash"Water"Cooler" (3" 0HKD50" AC001/2)" by" Wash" Water" Pump" (30HKD40" AP001/2)." Demineralized" water" is" also" added" to" the" top" of" the" column"which" removes" any" entrained" solvent" and" reduces" the" vapor" phase"solvent"in"the"exiting"flue"gas."

The"treated"flue"gas"is"then"routed"through"a"mesh"mist"eliminator"and"is"returned"to"the"stack"

of"MPP3."Excess"water"from"the"wash"water"section"is"combined"with"lean"solvent"entering"the"

Absorber"above"the"amine"packed"bed."

4.1.3Solvent-regeneration-

The"Process"Flow"Diagram"of"this"section"can"be"found"in"Appendix"2"on"page"44.""

The"rich"solvent"leaves"the"bottom"of"the"Absorber"and"is"pumped"by"the"Rich"Solvent"Pump"(3"

0HKG10"AP001/2)"to"the"solvent"regeneration"section"of"the"EFG+"Plant."Rich"solvent"from"the"

Absorber"is"routed"to"the"Solvent"Cross"Exchanger"(30HKG20"AC001:12)"to"heat"the"rich"solution" against"the"lean"solution"from"the"Lean"Flash"Drum"(3"0HKH30"BB001)."The"hot"rich"solvent"then" enters"the"Stripper"(30HKH10"BB0010)."

Rich" solvent" flows" down" the" Stripper" through" the" packed" beds" counter:current" to" stripping"

steam,"which"removes"CO2"from"the"rich"solvent."Solvent"collects"on"the"bottom"chimney"tray" and" is" sent" to" the" Reboiler" (3" 0HKH20" AC001:6)." Heat" input" to" the" Reboiler" is" provided" by" condensing"low"pressure"(LP)"steam."In"the"wash"section"of"the"Stripper"above"the"feed"nozzle," water"from"the"Overhead"Accumulator"(3"0HGA20"BB001)"is"used"to"wash"entrained"solvent"out"

of" the" vapor"stream." The" resulting" vapor" from" the" top" of" the" Stripper" contains"CO2"saturated" with"water."The"vapor"is"cooled"and"condensed"by"the"Condenser"(3"0HGA10"AC001/2)"against" vacuum"condensate"from"MPP3."

The" two" phase" mixture" from" the" Condenser" enters" the" Overhead" Accumulator" where" the" carbon"dioxide"and"condensed"water"are"separated."The"condensed"water"is"pumped"from"the" Overhead"Accumulator"by"the"Reflux"Pump"(3"0HGA30"AP001/2)."A"portion"of"the"condensate"is" returned"to"the"Stripper"as"reflux"and"the"remaining"liquid"from"the"Overhead"Accumulator"is"

sent"to"the"Absorber."The"carbon"dioxide"rich"vapor"is"sent"to"the"CO2"Product"Compressor"(3" 0HGB10"AN001)."

The" lean" solvent" leaving" the" Stripper" is" sent" to" a" Lean" Flash" Drum" where" it" is" flashed"at" near" atmospheric"pressure."The"resulting"flashed"vapor"is"returned"to"the"Stripper"via"the"Lean"Vapor" Compressor"(3"0HKH40"AN001)."The"lean"solvent"from"the"Lean"Flash"Drum"is"pumped"by"the" Lean"Solvent"Pump"(30HKG30"AP001/2)"to"the"Solvent"Cross"Exchanger."After"passing"through" the"Solvent"Cross"Exchanger,"the"lean"solvent"stream"is"routed"back"to"the"Absorber."A"portion" of" the" lean" solvent" stream" is" sent" to" the" Carbon" Bed" (3" 0HKF20" AT001).The" filtered" solvent" returns"to"the"main"lean"solvent"line"where"it"is"returned"back"to"the"Absorber."

4.1.4Solvent-reclaiming-

The"Process"Flow"Diagram"of"this"section"can"be"found"in"Appendix"2"on"page"45.""

A"slip"stream"of"hot"lean"solvent"from"the"bottom"of"the"Stripper"is"taken"out"through"a"semi:

continuous"reclaiming"operation."Also"a"20"wt%"NaOH"solution"stream"is"taken"to"the"reclaimer" system" package." The" recovered" solvent" is" sent" back" to" the" Lean" Flash" Drum." The" reclaimer" waste"is"routed"to"the"Reclaimer"Waste"Sump"and"periodically"shipped"off:site"for"disposal."

4.1.5Solvent-make$up-and-holding-

The"Process"Flow"Diagram"of"this"section"can"be"found"in"Appendix"2"on"page"45.""

The"make:up"solvent"is"stored"in"the"Solvent"Storage"Tank"(3"0HKJ20"BB001).Solvent"make:up" (normally"no"flow)"can"be"injected"into"the"lean"solvent"line"when"required."The"solvent"is"sent"

!Non%confidential!FEED!study!report!

!

17/79"

Maasvlakte"CCS"Project"C.V."

from" storage" to" the" lean" solvent" line" by" Solvent" Makeup"Pump" (3" 0HKJ40" AP001)" via" Solvent" Make:up"Pump"Suction"Heater"(3"0HKJ30AC001)."

A"Solvent"Holding"Tank"(3"0HKJ50"BB001)"is"required"to"store"the"solvent"inventory"in"the"event"

of"a"scheduled"maintenance"or"shutdown."The"solvent"can"be"transferred"to"the"holding"tank"via" the"Lean"Solvent"Pump"(to"the"Absorber)"and"Rich"Solvent"Pump"(to"the"holding"tank)."After"the" maintenance"or"shut"down"is"complete,"the"solvent"in"the"holding"tank"can"be"transferred"back" to"the"Absorber"using"the"Solvent"Transfer"Pump"(3"0HKJ60"AP001)."

4.1.6CO2-compression,-oxygen-removal,-and-dehydration-

The"Process"Flow"Diagram"of"this"section"can"be"found"in"Appendix"2"on"page"46.""

Following"recovery,"the"CO2"product"must"be"compressed"and"purified"to"meet"pipeline"water" and" oxygen" specifications." The" CO2" Product" Compressor" (3" 0HGB10AN001)" compresses" the" product" carbon" dioxide" to" 129" bar(a)." The" product" gas" is" cooled" after" each" stage" of" compression."Any"condensed"water"is"separated"from"the"gas"in"knockout"drums"for"each"of"the" first"five"stages"of"compression."

A" CATOX" Unit" (3" 0HGC10" BB001)" is" used" to" reduce" the" oxygen" concentration." The" required" hydrogen" gas" will" be" procured" and" stored" in" gas" cylinders." The" CATOX" Unit" is" a" reactor" containing"a"highly"reactive"catalyst"that"allows"the"safe"and"controlled"combustion"of"hydrogen" with"oxygen,"producing"water"which"is"knocked"out"after"cooling."

The"gas"leaving"the"CATOX"Unit"is"cooled"and"partially"condensed"in"the"CATOX"Aftercooler"(3" 0HGC20"AC001)."Condensed"water"is"then"removed"in"the"Water"KO"Drum"(3"0HGC30"BB001)."

Overhead" gas" from" the" Water" KO" Drum" is" sent" to" the" CO2" Dehydration" Package" (3" 0HGC40" AT001)"to"reduce"the"water"content"in"the"stream"to"below"the"required"dew"point."After"the" final"stage"of"compression,"the"product"carbon"dioxide"stream"is"cooled"to"60°C"and"routed"to"

the"battery"limit"at"129"bar(a)"for"pipeline"transportation."All"water"from"the"CO2"Dehydration" Package,"Water"KO"Drum"and"compression"interstage"KO"drums"is"combined"and"routed"back"to" the"Lean"Flash"Drum."

4.2Simplified-process-flow-diagrams-of-capture-and-compression-

In" Appendix" 2" you" will" find" the" simplified" process" flow" diagrams" of" capture" plant" and" compressor.!

4.3Overall-heat-and-material-balances-

In"tables"4.1"and"4.2"the"heat"and"mass"balances"can"be"found"on"a"general"level."The"stream"

numbers"correspond"to"the"streams"in"the"process"flow"diagrams"in"Appendix"2."

Within"the"FEED"study"itself"more"detailed"confidential"streams"have"also"been"considered"and" those" streams" served" as" input" for" the" figures" in" the" environmental" impact" assessment." However,"the"streams"in"tables"4.1"and"4.2"give"a"good"indication"of"the"amount"and"content"of" the"streams."

!

!Non%confidential!FEED!study!report!

!

18/79"

 

 

 

 

 

 

 

 

 

Maasvlakte%CCS%Project%C.V.%

 

 

 

 

%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table%4.1:%Capture%plant%heat%and%mass%balance.%!

 

 

 

 

 

 

 

 

 

%

%

%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Stream Description

Flue Gas to DCC

 

Neutralized Excess DCC

Demin Water

50 wt% NaOH

Scrubbing Solution

 

 

 

 

Water

 

(Note 2)

(Note 2)

 

Blowdown from DCC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Stream Numbers

 

 

101

 

107

 

 

109

110

 

115

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temperature, °C

 

 

48.2

 

46.6

 

 

15.0

20.0

 

27.9

 

 

 

Pressure, bar(a)

 

 

1.00

 

4.00

 

 

1.35

1.35

 

4.00

 

 

 

 

Component Flows

MW

kgmol/hr

mol%

 

kgmol/hr

mol%

kgmol/hr

mol%

kgmol/hr

mol%

kgmol/hr

mol%

 

 

 

H2O

18.02

3,491

11.2%

 

2,436

100.0%

8.0

100.0%

2.75

69.0%

18

96.7%

 

 

 

CO2

44.01

4,268

13.7%

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

N2

28.02

22,086

70.9%

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

Ar

39.95

249

0.8%

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

O2

32.00

1,059

3.4%

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

SO3

80.06

0.07

2 ppmv

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

SO2

64.06

0.44

14 ppmv

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

NO2

46.01

0.05

2 ppmv

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

NO

30.01

1.46

47 ppmv

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

NH3

17.03

0.210

7 ppmv

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

HCl

36.46

0.06

2 ppmv

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

HF

20.01

0.02

1 ppmv

 

0

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

 

Sodium Salts

-

0

0.0%

 

0.11

0.0%

0

0.0%

1.25

31.0%

0.59

3.0%

 

 

 

Ammonium Salts

-

0

0.0%

 

0.20

0.0%

0

0.0%

0

0.0%

0

0.0%

 

 

Total Molar Flow, kgmol/hr

31,155

 

2,436

 

 

8.0

4.0

 

19

 

 

 

Total Mass Flow, kg/hr

 

913,340

 

43,910

 

 

140

100

 

410

 

 

 

Molecular Weight

 

 

29.3

 

18.0

 

 

18.0

23.8

 

21.0

 

 

 

Density, kg/m³

 

 

1.099

 

989.8

 

 

999.3

1,528.1

 

1,150.1

 

 

 

Liquid Flow,³/hrm

 

 

 

 

44.3

 

 

0.14

0.06

 

0.34

 

 

 

Vapor Flow, m3i.N./hr (dry)

 

620,061

 

 

 

 

 

 

 

 

 

 

 

Vapor Flow, m3i.N./hr (wet)

 

698,308

 

 

 

 

 

 

 

 

 

 

%

Vapor Flow,³/hrm(actual)

 

831,095

 

 

 

 

 

 

 

 

 

%

pH

 

 

 

 

7.0

 

 

7.2

13.7

 

8.2

 

%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.All%NO%present%in%the%FGD%flue%gas%is%assumed%to%be%inert%and%passes%through%the%EFG+%plant.%All%SO3%present%in%the%FGD%flue%gas%is%in%aerosol%form%and% passes%through%the%EFG+%plant.%%

2.Stream%flow%rates%shown%above%are%during%reclaiming%operation.%%When%reclaimer%is%not%in%operation,%Stream%109%flow%rate%decreases%by%20%kg/hr%and%

Stream%110%flow%rate%decreases%by%10%kg/hr.%

%

%

%

!Non%confidential!FEED!study!report!

!

19/79%

Maasvlakte%CCS%Project%C.V.%

%

Table%4.2:%Capture%plant%heat%and%mass%balance%(continued).%!

%

 

Stream Description

Treated Flue Gas to Power

Make-up Wash Water to

Low Pressure CO2

Compressed CO2 Product

Reclaimer Effluent

 

 

Plant Stack

Absorber

to Compression

(Note 3)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Stream Number

 

 

202

 

203

 

303

 

310

404

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temperature, °C

 

 

34.9

 

15.0

 

40.0

 

60.0

139.7

 

 

 

Pressure, bar(a)

 

 

1.00

 

1.00

 

1.65

129.00

1.00

 

 

 

Component Flows

MW

kgmol/hr

mol%

kgmol/hr

mol%

kgmol/hr

mol%

kgmol/hr

mol%

kgmol/hr

mol%

 

 

H2O

18.02

1,456

5.7%

409

100.0%

183

4.6%

0

< 30 ppmv

-

-

 

 

CO2

44.01

427

1.7%

0

0.0%

3,841

95.4%

3,841

99.9%

-

-

 

 

EFG+ Solvent

61.08

0

1 ppmv

0

0.0%

0

0.0%

0

0.0%

-

-

 

 

N2

28.02

22,085

87.4%

0

0.0%

1

261 ppmv

1

0.0%

-

-

 

 

Ar

39.95

249

1.0%

0

0.0%

0

6 ppmv

0

0.0%

-

-

 

 

O2

32.00

1,059

4.2%

0

0.0%

0

24 ppmv

0

0.0%

-

-

 

 

SO3

80.06

0.07

3 ppmv

0

0.0%

0

0.0%

0

0.0%

-

-

 

 

SO2

64.06

0

0.0 ppmv

0

0.0%

0

0.0%

0

0.0%

-

-

 

 

NO2

46.01

0

0.1 ppmv

0

0.0%

0

0.0%

0

0.0%

-

-

 

 

NO

30.01

1.46

58 ppmv

0

0.0%

0

0.0%

0

0.0%

-

-

 

 

HSS

-

0

0.0%

0

0.0%

0

0.0%

0

0.0%

-

-

 

 

Total Molar Flow, kgmol/hr

25,276

 

409

 

4,025

 

3,842

1.2

 

 

 

Total Mass Flow, kg/hr

 

707,560

 

7,370

172,370

169,040

50

 

 

 

Molecular Weight

 

 

28.0

 

18.0

 

42.8

 

44.0

39.0

 

 

 

Density, kg/m³

 

 

1.097

 

999.3

 

2.732

 

433.8

1,200.0

 

 

 

Liquid Flow,³/hrm

 

 

 

 

7.4

 

 

 

389.6

0.04

 

 

 

Vapor Flow, m3i.N./hr (dry)

 

533,903

 

 

86,115

 

 

 

 

 

 

Vapor Flow, m3i.N./hr (wet)

 

566,538

 

 

90,216

 

 

 

 

 

 

Vapor Flow,³/hrm(actual)

 

644,760

 

 

63,099

 

 

 

 

 

%

pH

 

 

 

 

7.2

 

 

 

 

8.4

 

%

 

 

 

 

 

 

 

 

 

 

 

%

3.Reclaimer%effluent%operates%intermittently.%Stream%flow%rate%shown%above%is%during%reclaimer%effluent%operation.%%

4.Total%Cooling%load%of%the%capture%plant%and%compressor%is%161.1%MW.%

5.Overall%Power%of%the%capture%plant%and%compressor%(including%the%required%steam%power)%is%45.6%MW.%

!

!Non%confidential!FEED!study!report!

!

20/79%