The duration of the high flux flow will be about an hour a day during daily maintenance CIP; and two days a month during recovery CIP for each UF train.

The UF CIP system consists of a tank, electric heater, filter vessel, and recirculating pumps. A UF CIP event typically uses a weak acid and hypochlorite. After a CIP event, the CIP chemicals will be neutralized, and hypochlorite will be reduced to chloride before being sent to the makeup water treatment system equalization tank for recovery.

One key point to confirm is the mercury limit assumption noted above in Wastewater Permitting. The Illinois Water Quality Standard for Mercury (total) is 0.012 ug/L per 35 IAC 302.208(f). While the current PSGC NDPES permit does not include a mercury discharge limit for cooling tower blowdown in Outfall 001, it is anticipated this requirement will be applied to the power plant in the future.

According to the Illinois 2002 Section 303(d) List, the proposed discharge location is located on segment O 97 of the Kaskaskia River which is not impaired for mercury. The closest high-priority stream segment is downstream, segment O 91. It is also not impaired for mercury. Therefore, the risk of IEPA applying a stringent discharge limitation for mercury is low.

BASIC CONTRACTING AND PURCHASING STRATEGY

Procurement Strategy

The project team will use competitive bidding to compare multiple suppliers’ pricing offers, availability and commercial terms, identifying the supplier whose offering presents the lowest cost while supporting Prairie State CCS’s needs. Project aspects considered during evaluation include technical specifications, delivery date requirements and project specific or companywide standards. Purchase contracts are reviewed to verify that safety, quality, and delivery requirements are met before contracts are signed.

Engineering Interface

The procurement team looks to the project engineers to understand the technical factors that need to be considered when purchasing equipment. As part of their review, engineering provides technical review of bids received, providing a recommendation based on the requirements suppliers meet. The project team has