Chapter-7. Comparison table of regislation related to pipeline.
Table23: Comparison table of legislations related to pipeline
Act |
Gas Business Act (JP) |
|
|
|
Mining Act (JP) |
|
|
High Press. Gas Safety Act (JP) |
|
Electric Business Act (JP) |
|
Oil pipeline Business Act (JP) |
|
|
Act of each countries |
|
|
|
|
|
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
Technical |
Technical |
regulation |
for |
|
Technical |
regulation |
for |
facilities |
Schedule |
|
of |
high |
press. |
|
|
Technical |
regulation |
for pow |
|
Technical |
|
regulation |
for |
49 CFR 192 “Transportation of natural and other gas by pipeline” |
|
|||||||||||||||||||
Regulation |
facility |
|
|
|
|
|
used for mining activity |
|
|
ordinance |
|
|
|
|
|
|
|
generation facility |
|
|
pipeline facility |
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
|
Interpretation |
for |
|
tech |
|
Guideline for technical regulation |
KHK standard, JIS standard, etc. |
|
|
Interpretation |
for |
tec |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
Standard |
regulation for gas facility |
|
|
for |
facilities |
used |
for |
mi |
|
|
|
|
|
|
|
|
regulation |
for |
power |
generatio |
|
|
|
|
― |
|
|
|
ASME B31.8-1999 |
|
|
ISO 13623-2000 |
|
|
||||||||||
|
|
|
|
|
|
|
activity |
|
|
|
|
|
|
|
|
|
|
|
|
|
facility |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||
Material |
Main material |
for |
gas |
facility |
The |
steel |
pipe |
for |
Same as the item of structure. |
|
|
Main material for pressure part |
|
Material |
for pipe, fitting |
an |
Specification |
names |
of mai |
Materials |
used |
for |
pipeli |
|
||||||||||||||||||||
|
must have the safety mechanical |
|
transportation must withstand the |
|
|
|
|
|
|
|
|
must have the safety mechanical |
|
valve |
|
|
(hereinafter |
|
|
materials are listed in main body, |
system |
must |
have |
nece |
|
|||||||||||||||||||
|
property under the maximum and |
|
maximum |
operating |
pressure |
and |
|
|
|
|
|
|
|
|
property under the maximum and |
|
“pipeline, etc.”) must conform to |
available |
standard |
name |
mechanical |
properties |
to |
satisf |
|
|||||||||||||||||||
|
minimum operating temperature. |
|
load applied at the installed point. |
|
|
|
|
|
|
|
|
minimum operating temperature. |
|
the standards prescribed by notice |
listed in annex. |
|
|
the design requirements such as |
||||||||||||||||||||||||||
|
|
|
|
|
|
|
Gas is included in the oil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
or |
must |
have |
|
me |
|
|
|
|
strength and toughness. |
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
properties equivalent them. |
|
|
|
|
|
|
To be suitable for assembly and |
||||||||||
|
JIS, API, etc are quoted. |
|
|
No |
specific |
quotation from |
JIS is quoted. |
|
|
|
|
JIS, API are quoted. |
|
|
JIS |
is |
quoted according |
to |
ASTM, API are quoted. |
construction methods. |
|
|
|
|||||||||||||||||||||
|
|
|
|
|
|
|
standard. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
notice. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||
Structure |
The structure must be prope |
|
The |
steel |
pipe |
for |
The |
|
structure |
must |
|
|
The structure must be prope |
|
The structure of pipeline, |
etc. |
Design |
must |
be performed i |
Load that may cause destruction |
||||||||||||||||||||||||
|
under |
the |
|
working |
|
transportation must |
withstand |
the |
sufficient |
strength |
for |
maximum |
|
under |
the |
working |
|
must be safe against stress caused |
consideration |
with |
follow |
of pipeline |
or |
loss |
offunction |
|||||||||||||||||||
|
maximum |
pressure |
at maximum |
maximum |
operating |
pressure |
and |
stress generated in the nor |
|
maximum |
pressure at |
maximum |
by the |
|
weight |
of |
oil |
t |
fracture mode properly; |
|
must be identify are design |
stage |
||||||||||||||||||||||
|
working |
|
temperature |
|
load applied at the installed point. |
operation pressure or temperature |
|
working |
|
temperature |
|
transported, |
inner |
pressure |
an |
(1) yield |
|
|
|
and be considered. |
|
|
|
|||||||||||||||||||||
|
minimum temperature. |
|
|
Gas is included in the oil. |
|
depending |
|
on |
|
the |
|
|
minimum temperature. |
|
|
the like. |
|
|
|
|
|
(2) Buckling |
|
|
Functional, |
environmenta |
||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
dimension, |
allowable |
stress |
|
|
|
|
|
|
|
The |
|
minimum |
thickness |
(3) Fatigue, etc. |
|
|
construction, |
accidental load and |
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
material |
|
at |
normal |
opera |
|
|
|
|
|
|
stipulated |
|
for |
every |
|
|
|
|
their |
combination |
|
must |
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
temperature |
|
|
and |
|
|
|
|
|
|
|
|
diameter. |
|
|
|
|
|
|
|
|
|
considered. |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
efficiency, |
etc. |
of |
such |
pipeline, |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
or must have sufficient strengt |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
corresponding |
to |
the |
no |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
operating |
|
|
pressure |
and |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
produced by the producer who is |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
allowed |
as |
appropriate |
produce |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
who |
|
has |
|
the |
|
production |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
technical |
|
|
|
or |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
technology of pipe |
by METI . |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
114

Act |
Gas Business Act (JP) |
|
Mining Act (JP) |
High Press. Gas Safety Act (JP) |
Electric Business Act (JP) |
Oil pipeline Business Act (JP) |
|
|
Act of each countries |
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
Calculation |
The equation for minimum wall |
No provision. |
The |
calculation formula |
for The |
calculation formula |
for Expected |
load |
such |
as inner The |
minimum |
wall thickness Formula of |
the |
minimum wall |
|
|||||||
of piping |
thickness |
against |
inner pressure |
|
minimum |
wall thickness against |
minimum |
wall thickness against pressure, soil pressure, |
hydraulic |
against |
inner |
pressure |
(walthickness |
in |
the |
circumferential |
|
|||||
thickness |
and the calculation formula f |
|
inner pressure is set forth. |
inner pressure, earth pressure and |
pressure, |
train |
and |
vehicle |
thicknessis varies with coefficients direction |
against |
innerpressure |
|
||||||||||
|
minimum |
wall thickness |
agains |
|
|
|
road load is set forth. |
prescribed by the ordinance. |
designed by Location Class). |
(wall |
thickness |
varies |
wi |
|||||||||
|
earth pressure and road load is set |
|
|
|
|
|
|
|
|
|
To be |
thicken, |
if a large |
force coefficients designed by Location |
|
|||||||
|
forth and the |
greater |
on |
|
|
|
|
|
Generated stress by the load is; |
such |
as |
scour, |
landslidClass) and composite stress. |
|
||||||||
|
adopted. |
|
|
|
|
|
|
|
|
Primary load, etc. 0.5σy |
earthquake and |
liquefactionis |
|
|
|
|
|
|||||
|
Outer pressure |
|
|
|
|
|
|
|
Pressure load 0.4σy |
|
possible to apply. |
|
|
|
|
|
|
|
t 2.5(K f Wσf KtWt )Do C
|
Inner pressure |
|
|
|
No provision. |
Inner pressure |
|
|
|
Inner pressure |
|
|
|
Inner pressure |
Inner pressure |
Inner pressure |
|
|
|
|
|||||||||||||||||||||||
|
(1) When the ratio between outer |
(1) When the ratio between outer |
(1) When the ratio between outer |
The formula is provided. |
|
2S |
σhp (pid − pod ) |
(D0 |
−tmin ) |
|
|||||||||||||||||||||||||||||||||
|
|
|
|
|
P |
t |
FET |
|
|
||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 ×tmin |
|
|
||||||
|
diameters to inner diameter is 1.5 |
diameters to inner diameter is 1.5 |
diameters to inner diameter is 1.5 |
|
D |
|
|||||||||||||||||||||||||||||||||||||
|
or less. |
|
|
|
|
|
|
|
|
|
or less. |
|
|
|
|
|
|
|
|
|
or less. |
|
|
|
|
|
|
|
|
|
F 0.4 0.8 |
|
|
|
|
|
|
||||||
|
t |
|
|
PDo |
|
C |
|
|
t |
|
|
|
PDo |
|
C |
|
t |
|
|
|
PDo |
C |
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
2σ η 0.8P |
|
|
2σ η 0.8P |
|
2σ η 0.8P |
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||
|
|
|
|
|
a |
|
|
|
|
|
|
|
|
|
|
|
|
a |
|
|
|
|
|
|
|
|
|
|
a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2) When the ratio between outer |
(2) When the ratio between outer |
(2) When the ratio between outer |
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||
|
diameters |
to |
|
inner |
diameter |
is |
diameters |
|
to |
inner |
diameter is diameters |
|
to |
inner |
diameter |
is |
|
|
|
|
|
|
|
|
|
||||||||||||||||||
|
more than 1.5. |
|
|
|
|
|
|
more than 1.5. |
|
|
|
|
|
more than 1.5. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
D |
|
|
|
|
|
|
|
|
D |
|
|
|
|
|
|
|
D |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
t |
|
|
a η P |
|
t |
|
|
a η P |
|
t |
|
|
a η P |
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||
|
|
|
o |
1 |
|
|
|
|
C |
|
|
|
o |
1 |
|
|
|
C |
|
|
o |
1 |
|
|
C |
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
2 |
|
|
aaη P |
|
|
|
2 |
|
|
aaη P |
|
|
2 |
|
|
aaη P |
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Earthquake |
Quoted |
seismic |
design of |
gas No provision. |
No |
|
stipulation |
in |
the |
gener |
Refer |
to |
safety rule |
related |
the |
Provision by notice. |
No specific provision. |
The |
formula |
has |
not |
b |
|||||||||||||||||||||
resistant |
facility. |
|
|
|
|
|
|
|
|
|
rule. |
|
|
|
|
|
|
|
|
|
complex |
|
rule ( No.717/1987/ Consideration based on stress. |
|
|
|
shown, |
though |
earthquake |
h |
|||||||||||||
|
Middle |
|
|
and |
|
low |
pr |
(Complex rule: The construction |
Environmental |
Protection |
a |
|
|
|
|
been to consider as environmental |
|
||||||||||||||||||||||||||
|
Guideline |
for |
|
seismicdesign of |
of |
pipeline must |
be |
safe |
agains |
Industrial Location Bureau |
|
|
|
|
|
load. |
|
|
|
|
|
||||||||||||||||||||||
|
middle |
|
|
and |
|
low |
pressure |
|
the |
stress |
caused |
by earthquake |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
|
pipeline. |
|
|
|
|
|
|
|
*** and other secondary load.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
High |
|
|
pressure: |
Guideline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
seismic design of high pressur |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
pipeline |
|
|
and |
|
guideline |
Allowable stress design method |
Allowable stress design method |
Allowable stress design method |
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||
|
liquefaction |
seismic |
|
design |
Level-1 |
Level-1 |
|
|
|
|
|
|
Level-1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
high gas pipeline. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
Level-2 |
|
|
earthquake |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
115

Act |
Gas Business Act (JP) |
|
|
|
Mining Act (JP) |
|
|
High Press. Gas Safety Act (JP) |
|
Electric Business Act (JP) |
Oil pipeline Business Act (JP) |
|
|
|
Act of each countries |
|
|
|
|
||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
considered |
in |
|
case |
of |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
pressure pipeline. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||
Pressure test |
Pressure |
test |
for |
pressure |
part |
To pass the pressure test under |
To withstand pressure test under |
|
Pressure test for pressure part |
Hydro pressure test for pipeline, |
Different |
with |
each |
c |
More than 1.25 times, at leas |
||||||||||||||||||||||||||||||
|
must be performed by appropriate |
at least 1.5 times of |
maximumat least |
1.5 |
times |
of |
n |
must be performed by appropriate |
etc. must be performed 1.5 times |
locations. |
(design |
|
one hour by water, or air wh |
||||||||||||||||||||||||||||||||
|
method. |
(excluding |
those |
t |
operating pressure. |
|
|
|
operation pressure. |
|
|
|
|
method. |
|
|
|
|
|
of |
operating |
pressure |
by |
location) |
|
|
|
water is unavailable. (1.20 times |
|||||||||||||||||
|
have passed RT |
|
|
|
|
|
Pressure test or air tightness test |
At least 1.25 times in |
case |
of 1.5 times of maximum operating |
method specified in the notice. |
Class1, |
Dev.1 more |
than |
1.25 |
is possible |
for |
C, |
D |
fluid |
|||||||||||||||||||||||||
|
1.5 times of maximum operating |
must be performed. |
|
|
|
gas. |
|
|
|
|
|
pressure. |
|
|
|
|
|
|
|
|
|
|
|
|
times by water |
|
does not exceed 1.05 times.) |
||||||||||||||||||
|
pressure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Class1, |
Dev.2 more |
than |
1.1 |
More than 1.1 times, at least 8 |
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
times by water or air |
|
hours as |
leak |
test |
after |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Class2 |
more than 1.25 times by |
strength test. |
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
water or air |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Class3&4 more than 1.4 times by |
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
water |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||
Air tightness |
No |
|
leakage |
when |
performin |
To pass the air-tight examination |
To pass the air-tight examination |
|
No |
leakage |
when |
performin |
No provision. |
|
|
|
No provision. |
|
|
|
No provision. |
|
|
|
|||||||||||||||||||||
test |
air-tight |
|
examination |
|
more than 1.1 times of maximum |
more |
than |
normal |
oper |
air-tight test. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
appropriate method. |
|
|
|
|
operation pressure. |
|
|
|
pressure. |
|
|
|
|
|
1.1 |
times |
of |
the |
maxim |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
Air-tight examination |
und |
Air-tight |
examination |
|
|
|
|
|
|
|
operating pressure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
maximum |
operating |
pressure |
o |
pressure test must be performed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
normal |
operating |
pressure |
mus |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
be performed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||
Welding part |
Welding part of the gas facility |
Pipe |
joint |
must |
be |
made |
|
Non-destructive |
testing |
|
Welding |
part |
|
of |
the |
elect |
The welding of pipeline, et |
Welding procedure |
and welder |
Welding |
procedure |
and welder |
|||||||||||||||||||||||
|
where |
gas |
passing |
|
through |
an |
welding |
|
|
method |
|
that |
|
required |
when |
|
testing |
by |
|
facilities |
where |
|
gas |
pa |
must be performed by the welding |
must be pursuant to API 1104. |
|
must be pursuant to ISO 13847. |
|||||||||||||||||
|
bear 0MPa and more must hav |
equivalent effect of other than arc |
pressure only. |
|
|
|
|
through and bear 0.98MPa a |
method |
such |
as |
arc |
we |
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||
|
good melting, no harmful defects |
welding. |
|
However, |
it |
may |
|
|
|
|
|
|
|
more must have safety sha |
stipulated in notice. |
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||
|
due to crack by welding and have |
other |
safety |
method |
that |
|
|
|
|
|
|
|
(liquefied gas pipeline) |
|
|
The welding equipment, welding |
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
strength at least as required |
asnecessary |
strength |
|
for |
sa |
|
|
|
|
|
|
Welding |
part |
|
must |
not ha |
consumables used for welding of |
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||
|
design strength. |
|
|
|
|
|
when welding is not proper. |
|
|
|
|
|
|
|
cracking and could arise cracks. |
pipeline |
must |
have |
performance |
|
|
|
|
|
|
|
|
|
|
||||||||||||||||
|
Confirmation of WPS, welder |
|
|
|
|
|
|
|
|
|
|
|
|
|
Confirmation of WPS,welder |
equivalent or more than standard |
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
test, |
appropriate nondestructive- |
|
|
|
|
|
|
|
|
|
|
|
|
|
test, |
appropriate |
nondestructive- |
stipulated in notice. |
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
testing and criteria for RT in case |
|
|
|
|
|
|
|
|
|
|
|
|
|
testing and |
criteria for |
RT |
must |
The welding method andother |
|
|
|
|
|
|
|
|
|
|
||||||||||||||||
|
of |
high |
pressure |
and |
|
m |
|
|
|
|
|
|
|
|
|
|
|
|
|
be pursuant to JIS Z3104. |
|
necessary |
matter |
for |
weldi |
|
|
|
|
|
|
|
|
|
|
||||||||||
|
pressure |
pipeline |
with |
150m |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
must be stipulated in notice. |
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
diameter |
and |
|
more |
must |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
pursuant to JIS Z3104. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
116

Act |
Gas Business Act (JP) |
|
|
Mining Act (JP) |
|
|
High Press. Gas Safety Act (JP) |
Electric Business Act (JP) |
|
Oil pipeline Business Act (JP) |
|
|
|
|
Act of each countries |
|
|
|
|
||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||
Gas drip box |
Gas drip box must be provided |
Measure |
to |
remove |
moistur |
Measure to remove water must |
No provision. |
|
|
|
No provision. |
|
|
|
No provision. |
|
|
|
No provision. |
|
|
|
|||||||||||||||||||||||
|
on |
pipeline |
which |
between natural gas pipeline and |
be taken. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
accumulate water. |
|
its connected compressor must be |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
|
|
|
taken. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||
Corrosion |
Measure to |
prevent |
corrosio |
Appropriate |
|
measures |
|
Measure to prevent corrosio |
The appropriate measures must |
|
The |
|
painting, |
|
coating |
Must |
be |
painted |
or |
cover |
Corrosion |
control |
must |
||||||||||||||||||||||
protection |
must be taken, if there is risk o |
corrosion |
protection |
must |
must |
|
be |
taken |
when |
bu |
be taken if there is a ris |
electrical |
corrosion |
|
protection |
inconsideration |
with |
installation |
performed to prevent the risk o |
||||||||||||||||||||||||||
|
corrosion. |
|
|
|
taken for pipeline that installed in |
underground. |
|
|
|
|
|
corrosion. |
|
|
|
|
must |
be |
applied |
the |
pip |
conditions, |
|
operation |
non-operation due to destruction |
||||||||||||||||||||
|
|
|
|
|
the place where the much risk of |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
installed |
underground |
or |
o |
environment |
and |
|
c |
by corrosion during design life. |
|||||||||||||||||
|
|
|
|
|
corrosion is. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
seabed. |
|
|
|
|
|
|
protection condition. |
|
|
|
The |
outer |
electricity |
supp |
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
method is stipulated. |
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||
Protection |
Measure to prevent damage due |
Protective equipment and sign |
Signs must be installed when |
Appropriate protective measures |
|
The protection equipment must |
Pipeline must be protected from |
No provision. |
|
|
|
||||||||||||||||||||||||||||||||||
measures |
to contact exposed pipeline on the |
must be provided if there is a risk |
installing pipeline on the ground, |
must be taken if there is a risk of |
be installed according to notice if |
damage |
or accidents |
by |
vehicles |
|
|
|
|
|
|||||||||||||||||||||||||||||||
|
road with vehicles must be taken. |
of damage due to collision |
pipeline |
must |
be |
buried |
un |
damage. |
|
|
|
|
|
there |
is |
a |
risk |
of damage |
in |
exposed |
places |
|
such |
|
|
|
|
|
|||||||||||||||||
|
|
|
|
|
vehicle |
when |
|
installing |
on |
more |
than |
0.6m |
and |
provi |
|
|
|
|
|
|
pipeline or support due to |
intersection |
with pipe-rack |
or |
|
|
|
|
|
||||||||||||||||
|
|
|
|
|
ground. |
|
|
|
|
|
|
signs |
|
when |
installing |
pipel |
|
|
|
|
|
|
collision |
of |
vehicle, |
vessel an |
bridge |
by means of separation |
or |
|
|
|
|
|
|||||||||||
|
|
|
|
|
Protective measure to prevent |
buried under the ground surface. |
|
|
|
|
|
|
the like. |
|
|
|
|
|
barrier. |
|
|
|
|
|
|
|
|
|
|
||||||||||||||||
|
|
|
|
|
damage of the riser pipe by vessel |
When installing in the wate |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
must |
|
be |
taken |
and |
must |
appropriate |
depth that |
no |
affec |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
provided sign when installing on |
by vessel and wave. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
|
|
|
|
|
the seabed, etc. |
|
|
|
|
Complex |
rule |
stipulates |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
install pipeline in the protectiv |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
structure when burying |
it |
rai |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
across the road, railroad, river or |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
waterway. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||
Interrupting |
Emergency shutoff |
devicefor |
Gas |
shutoff |
device |
must |
No |
|
stipulation |
|
in |
gen |
Shutoff equipment to block the |
Every 4km for an specified area |
The |
|
interval between |
sectio |
Section shutoff valves must be |
||||||||||||||||||||||||||
device |
pipeline |
that |
are |
buried |
providedin in |
the junction point |
of |
rule.( |
Complex |
rule: |
Emergency |
inflow and outflow of gas must be |
|
in an ordinance. |
|
|
|
shutoff valves must be less tha |
provided at start, end and t |
||||||||||||||||||||||||||
|
alongside the roadsuch as gas |
pipeline. Pipeline must be placed |
shutoff |
device |
must |
be |
provided |
provided at the main entrance of |
Specified in notice; |
|
|
following; |
|
|
|
|
points |
for following |
items |
on |
|||||||||||||||||||||||||
|
shutoff device. |
|
|
in |
a |
suitable |
position |
|
in |
every |
|
4km |
|
for |
p |
gas equipment. |
|
|
|
Every 4km for back and forth of |
(1) Class1 20mile |
|
|
|
pipeline; |
|
|
|
|||||||||||||||||
|
|
|
|
|
pipeline across the city, etc. |
|
|
crossing |
urban |
area, |
etc. At the The |
|
last place |
entering |
|
theriver |
|
and |
channel |
cro |
(2) Class2 15mile |
|
|
|
(1) Operation and maintenance |
||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
same |
|
time, |
measure at th can |
common |
|
culvert |
andjunction |
|
necessary |
|
place |
|
for |
(3) Class3 10mile |
|
|
|
(2) Emergency control |
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
transport gas to every section and |
point |
and |
other |
point |
w |
management |
of mountai |
slope |
(4) Class4 5mile |
|
|
|
(3) Limit of runoff |
|
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
be replaced by an inert gas must |
necessary |
for |
maintenance |
|
and city area, every 10km f |
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
be taken. ) |
|
|
|
|
|
pipeline. |
|
|
|
outside town. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||
Leak |
No provision. |
|
|
Leak |
detection |
equipment |
o |
No provision in general rule |
Appropriate measures to prevent |
|
Leak detection equipment and |
No provision. |
|
|
|
Testing and recording mustbe |
|||||||||||||||||||||||||||||
detection |
|
|
|
|
leak |
|
detection |
|
hole |
must |
(Complex rule: gas leak detection |
harm must be taken in case of gas |
|
leak |
detection |
hole |
must |
|
|
|
|
|
|
|
performed periodically to confirm |
||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
117

Act |
Gas Business Act (JP) |
|
Mining Act (JP) |
|
|
High Press. Gas Safety Act (JP) |
|
Electric Business Act (JP) |
|
|
Oil pipeline Business Act (JP) |
|
|
|
|
Act of each countries |
|
|
|
||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||
device |
|
provided where necessary. |
|
|
alarm equipment or leak detection |
|
leak. |
|
|
|
|
|
provided on pipeline system. |
|
|
|
|
|
|
|
|
the |
suitability |
of |
ope |
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
mouth must be provided on th |
|
Ventilation |
equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
requirements. |
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
flammable gas pipeline.) |
|
|
common |
duct, |
leak |
detec |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
alarm |
equipment |
must |
|
b |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
provided where gas may leak. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||
Protection |
No provision. |
To provide operation condition |
No provision in general rule |
|
No provision. |
|
|
|
|
Monitoring device to monito |
No |
specific |
provision. The( |
Emergency |
shutdown |
ystem, |
|||||||||||||||||||||||||
device |
|
monitoring equipment. |
|
|
(Complex rule: alarm device must |
|
|
|
|
|
|
|
the operating status of equipment |
provision of |
emergency |
shuto |
pressure |
|
regulating |
sy |
|||||||||||||||||||||
|
|
To provide alarm system in the |
be |
provided |
|
forabnormal |
|
|
|
|
|
|
|
such |
as |
compressor |
and |
|
valv |
device |
that |
|
can |
isolate |
monitoring |
system |
|||||||||||||||
|
|
event |
of abnormal fluctuation |
of |
pressure and flow on pipeline.) |
|
|
|
|
|
|
|
must be provided on pipeline. |
|
dissipate gas is stipulated in th |
communication |
system |
must b |
|||||||||||||||||||||||
|
|
pressure and flow rate. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Warning |
device |
to |
indicate i |
item of compressor station.) |
|
provided in station. |
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
the event of an abnormal situation |
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
such |
as |
unusualchanges |
in |
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
pressure or flow ratemust be |
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
provided according to notice. |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
Installation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Protection measure for buried |
|
To be buried underground. |
|
|
Stipulated |
|
according |
With little human activity 0.8m |
|||||||||||||||
condition |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
under road must be taken. |
|
|
To keep clearance at least 0.3m. |
classification rules; |
|
|
Farmland 0.8m |
|
|
||||||||||||||
for pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0.15m |
when |
crossing |
w |
|
Distance with ground level. |
|
Piping cover item-841.142 |
Road, railroad 0.8m |
|
|
|||||||||||||
(except |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
underground object |
and |
at |
least |
(1) Forest wilderness at least |
(1) Class1 |
24inch |
|
|
|
|
|
|
|||||||||||
seabed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0.3m in parallel case. |
|
|
|
|
0.9m |
|
|
|
|
(2) Class2 |
30inch |
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2) Other area at least 1.2m |
(3) Calss3&4 30inch |
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
Safety |
No provision for pipeline. |
Safety |
valve |
and |
other |
safety |
Measure |
to |
|
avoid |
exceedin |
|
No provision for pipeline. |
|
|
|
Control |
device |
to |
|
con |
(The |
provision |
of |
press |
The |
equipment to |
|
prevent |
||||||||||||
device, etc. |
|
device |
|
to |
avoid |
exceeding e |
thnormal operation temperature and |
|
|
|
|
|
|
|
pressure due to normal operation |
safety device |
is |
stipulated |
in the |
overpressure such as relief valve, |
|||||||||||||||||||||
|
|
maximum working pressure. |
|
|
measure that can be returned |
to |
|
|
|
|
|
|
or |
oil |
hammering |
must |
item of compressor station.) |
|
isolation valve |
must be |
provided |
||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
reduce pressure to below normal |
|
|
|
|
|
|
|
provided so as not to exceed 1.1 |
|
|
|
|
|
|
in order to prevent the occurrence |
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
operation pressure, if the pressure |
|
|
|
|
|
|
|
times |
|
of |
normal |
|
op |
|
|
|
|
|
|
of incidental pressure. |
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
exceeds |
the |
|
normal |
operat |
|
|
|
|
|
|
|
pressure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
pressure. |
|
|
|
|
|
|
|
|
|
|
|
|
Pressure |
safety |
device |
mu |
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
have |
enough capacity |
to |
fu |
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
absorb |
pressure |
fluctuation |
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
pipeline. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
Items |
No provision. |
Pressure |
sensing |
devices |
an |
No provision in the general rule. |
|
No provision. |
|
|
|
|
Seismic |
sensor |
and |
|
str |
No provision. |
|
|
|
|
|
|
|
|
|||||||||||||||
provided |
|
backflow |
prevention |
devices |
fo |
(Complex |
rule: |
|
Seismicsensor |
|
|
|
|
|
|
|
motion |
seismograph |
must |
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
specifically |
|
the |
marine |
pipeline |
must |
must be provided in the necessary |
|
|
|
|
|
|
|
provided |
along |
|
the |
|
pip |
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
|
|
provided |
|
in |
the |
appro |
place |
along |
the |
pipeline |
|
|
|
|
|
|
|
pursuant to the notice. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
location. |
|
|
|
|
|
|
measures to prevent disaster must |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
118
Act |
Gas Business Act (JP) |
|
|
Mining Act (JP) |
|
High Press. Gas Safety Act (JP) |
|
Electric Business Act (JP) |
Oil pipeline Business Act (JP) |
|
Act of each countries |
|
|
|
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
be taken.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
Safety |
No |
provision |
for |
pipeline |
. |
Control |
|
function that |
No |
|
provision |
in |
generaluler. |
|
No provision for pipeline. |
Pipeline |
|
must |
|
be |
provi |
Stipulated |
in |
item |
a |
|
|
|
|
|
|||||||||||||
control |
(Stipulated |
in ordinance |
Articl |
compressor |
|
or |
pump |
does |
(Control function that compressor |
|
safety |
control device |
that |
compressor station. |
|
|
|
|
|
|
|
||||||||||||||||||||||
device |
23, |
26 |
and |
27 |
relat |
work without ensuring that t |
or pump does not work witho |
|
following |
|
|
function. |
|
(co |
|
|
|
|
|
|
|
|
|
||||||||||||||||||||
|
production) |
|
|
|
control |
circuit |
for |
the |
s |
ensuring |
that |
the |
control |
circu |
|
function |
|
that |
blower |
does |
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
equipment |
|
|
such as monitoring |
for the safety equipment suchas |
|
|
work without ensuring that t |
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||
|
|
|
|
|
|
equipment |
|
of |
operating |
condition |
monitoring |
|
equipment |
|
|
|
control |
|
circuit |
for |
|
the |
s |
|
|
|
|
|
|
|
|
|
|||||||||||
|
|
|
|
|
|
is normal for pipeline which |
operating condition is normal for |
|
equipment such as pressure safety |
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||
|
|
|
|
|
|
installed in the complex area. |
|
pipeline which is installed in the |
|
equipment, |
automatic |
|
oil |
lea |
|
|
|
|
|
|
|
|
|
||||||||||||||||||||
|
|
|
|
|
|
Control function to gracefully |
complex area. Control function to |
|
detection |
equipment, |
emergency |
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||
|
|
|
|
|
|
shut down compressor and pump |
gracefully |
shut |
down |
compressor |
|
shutoff |
valve, |
seismoscope, |
an |
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
or |
close |
emergency |
s |
and pump or close emergen |
|
other safety equipments is normal |
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||
|
|
|
|
|
|
equipment |
|
|
by |
automatic |
shutoff |
equipment |
by automati |
|
and control function to gracefully |
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
manual in the event of abnormal |
or |
manual |
|
in |
|
the |
even |
|
shut |
down |
|
blower |
or |
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
|
conditions. |
|
|
|
|
|
abnormal conditions.) |
|
|
|
|
emergency |
shutoff |
equipment |
by |
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
automatic or manual in the event |
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
of abnormal conditions.) |
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||
Protective |
No provision. |
|
|
Earthling must be provided,if |
No provision in the general rule. |
|
No provision. |
Earthling must be provided i |
No specific provision. |
|
|
No specific provision. |
|
|
|||||||||||||||||||||||||||||
grounding |
|
|
|
|
|
required for safety. |
|
|
|
(Complex rule: Earthing must be |
|
required for safety. |
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
provided for safety, if necessary.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||
Insulation |
No provision. |
|
|
Measure must be taken such as |
No |
stipulation |
in |
general rule. |
No provision. |
Pipeline |
|
system |
|
must |
No specific provision. |
|
|
The following items must b |
|||||||||||||||||||||||||
|
|
|
|
|
|
insulation from support or other |
(Complex rule: Measures must be |
|
insulated |
from |
other |
struct |
|
|
|
|
taken |
into account |
for |
|
|||||||||||||||||||||||
|
|
|
|
|
|
structure, |
|
|
|
application |
taken |
|
such |
as |
insulation |
fr |
|
such |
as |
|
support, |
|
if |
ther |
|
|
|
|
selection of the insulation; |
|
|
||||||||||||
|
|
|
|
|
|
insulating |
fittings |
and |
necessary |
support |
|
|
or |
|
|
other |
structures, |
|
|
necessity for safety. |
|
|
|
|
|
|
|
|
(1) |
Risk for fluid |
|
|
|
||||||||||
|
|
|
|
|
|
measure |
|
for |
insulation |
w |
application |
of |
insulating |
fitting |
|
The |
insulated |
intjo |
|
must |
b |
|
|
|
|
(2) |
Insulation |
systems |
a |
||||||||||||||
|
|
|
|
|
|
installing |
|
|
pipeline |
in |
|
and |
|
necessary |
|
measure |
|
|
applied |
to |
|
pipeline |
|
system, |
|
|
|
|
|
other safety requirements |
|
||||||||||||
|
|
|
|
|
|
proximity |
|
to |
location |
of |
insulation |
|
must |
|
be |
takenif |
|
there is necessity for safety. |
|
|
|
|
|
(requirement |
as |
|
op |
||||||||||||||||
|
|
|
|
|
|
arrester |
|
|
must |
be |
take |
necessary for safety.) |
|
|
|
|
Necessary |
|
insulation |
measure |
|
|
|
|
management |
|
|
|
|||||||||||||||
|
|
|
|
|
|
necessary for safety.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
must be taken when installi |
|
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
pipeline |
|
in |
|
close |
proximity |
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
location of the arrester. |
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||
Lightning |
No provision. |
|
|
To be provided, if required for |
No |
|
provision |
|
in |
thegeneral |
|
No provision. |
The lightning protection system |
No specific provision. |
|
|
No specific provision. |
|
|
||||||||||||||||||||||||
protection |
|
|
|
|
|
safety. |
|
|
|
|
|
|
rule.( Complex rule: measures to |
|
|
must be provided for the part that |
|
|
|
|
|
|
|
|
|
||||||||||||||||||
system |
|
|
|
|
|
|
|
|
|
|
|
|
|
avoid |
the |
effects |
of |
lightni |
|
are placed on the ground pursuant |
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
must be taken , if necessary.) |
|
|
to notice. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
119

Act |
Gas Business Act (JP) |
Mining Act (JP) |
High Press. Gas Safety Act (JP) |
|
Electric Business Act (JP) |
Oil pipeline Business Act (JP) |
Act of each countries |
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
Others |
No provision. |
|
|
No provision. |
Complex |
ule:r |
Power |
f |
No provision. |
|
|
Emergency reporting equipment |
No specific provision. |
No specific provision. |
||||||||
|
|
|
|
|
|
|
security, |
patrol |
vehicle |
|
|
|
|
|
|
and a |
facility |
to |
notify |
|
|
|
|
|
|
|
|
|
|
equipment |
storage |
must |
|
|
|
|
|
|
authority must be provided along |
|
|
||||
|
|
|
|
|
|
|
provided. |
|
|
|
|
|
|
|
|
the pipeline. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Chemical |
fire |
engine, patr |
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
vehicle |
and |
equipment |
stora |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
must be provided along pipeline |
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
pursuant to notice. |
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
Leak test |
HP once every 14 months |
No provision. (according to |
No provision. Airtight test is |
|
No |
provision. Inspection |
No provision. |
|
|
No specific provision. |
No specific provision. |
|||||||||||
|
Others once every 40 months |
safety manual) |
required as a security check |
|
frequency |
|
must |
be |
done |
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
accordance |
with |
Gas |
Busin |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Act. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
Pressure |
Prevention |
|
measures |
due to |
Pressure regulator at appropriate |
No provision. |
|
|
No provision. |
|
|
No provision. |
|
|
No specific provision. |
No specific provision. |
||||||
regulator |
fire caused |
by |
gas |
leak |
location, gas isolating equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(high pressure), shutoff device |
at the entrance of regulator and |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
and |
impurity |
|
safety device at the outlet must be |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
equipment |
|
at |
entrance, |
provided for pipeline if necessary. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
prevention |
|
apparatus |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
pressure rise, |
flood |
protection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
device, |
anti-icing |
|
system |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
support |
|
to |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
earthquake |
|
and |
|
ove |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
maintenance |
|
for |
if |
gas |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
supplied to one user. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
120