Chapter-7. Comparison table of regislation related to pipeline.

Table23: Comparison table of legislations related to pipeline

Act

Gas Business Act (JP)

 

 

 

Mining Act (JP)

 

 

High Press. Gas Safety Act (JP)

 

Electric Business Act (JP)

 

Oil pipeline Business Act (JP)

 

 

Act of each countries

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Technical

Technical

regulation

for

 

Technical

regulation

for

facilities

Schedule

 

of

high

press.

 

 

Technical

regulation

for pow

 

Technical

 

regulation

for

49 CFR 192 “Transportation of natural and other gas by pipeline”

 

Regulation

facility

 

 

 

 

 

used for mining activity

 

 

ordinance

 

 

 

 

 

 

 

generation facility

 

 

pipeline facility

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interpretation

for

 

tech

 

Guideline for technical regulation

KHK standard, JIS standard, etc.

 

 

Interpretation

for

tec

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Standard

regulation for gas facility

 

 

for

facilities

used

for

mi

 

 

 

 

 

 

 

 

regulation

for

power

generatio

 

 

 

 

 

 

 

ASME B31.8-1999

 

 

ISO 13623-2000

 

 

 

 

 

 

 

 

 

activity

 

 

 

 

 

 

 

 

 

 

 

 

 

facility

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Material

Main material

for

gas

facility

The

steel

pipe

for

Same as the item of structure.

 

 

Main material for pressure part

 

Material

for pipe, fitting

an

Specification

names

of mai

Materials

used

for

pipeli

 

 

must have the safety mechanical

 

transportation must withstand the

 

 

 

 

 

 

 

 

must have the safety mechanical

 

valve

 

 

(hereinafter

 

 

materials are listed in main body,

system

must

have

nece

 

 

property under the maximum and

 

maximum

operating

pressure

and

 

 

 

 

 

 

 

 

property under the maximum and

 

“pipeline, etc.”) must conform to

available

standard

name

mechanical

properties

to

satisf

 

 

minimum operating temperature.

 

load applied at the installed point.

 

 

 

 

 

 

 

 

minimum operating temperature.

 

the standards prescribed by notice

listed in annex.

 

 

the design requirements such as

 

 

 

 

 

 

 

Gas is included in the oil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

or

must

have

 

me

 

 

 

 

strength and toughness.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

properties equivalent them.

 

 

 

 

 

 

To be suitable for assembly and

 

JIS, API, etc are quoted.

 

 

No

specific

quotation from

JIS is quoted.

 

 

 

 

JIS, API are quoted.

 

 

JIS

is

quoted according

to

ASTM, API are quoted.

construction methods.

 

 

 

 

 

 

 

 

 

 

standard.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

notice.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Structure

The structure must be prope

 

The

steel

pipe

for

The

 

structure

must

 

 

The structure must be prope

 

The structure of pipeline,

etc.

Design

must

be performed i

Load that may cause destruction

 

under

the

 

working

 

transportation must

withstand

the

sufficient

strength

for

maximum

 

under

the

working

 

must be safe against stress caused

consideration

with

follow

of pipeline

or

loss

offunction

 

maximum

pressure

at maximum

maximum

operating

pressure

and

stress generated in the nor

 

maximum

pressure at

maximum

by the

 

weight

of

oil

t

fracture mode properly;

 

must be identify are design

stage

 

working

 

temperature

 

load applied at the installed point.

operation pressure or temperature

 

working

 

temperature

 

transported,

inner

pressure

an

(1) yield

 

 

 

and be considered.

 

 

 

 

minimum temperature.

 

 

Gas is included in the oil.

 

depending

 

on

 

the

 

 

minimum temperature.

 

 

the like.

 

 

 

 

 

(2) Buckling

 

 

Functional,

environmenta

 

 

 

 

 

 

 

 

 

 

 

 

 

 

dimension,

allowable

stress

 

 

 

 

 

 

 

The

 

minimum

thickness

(3) Fatigue, etc.

 

 

construction,

accidental load and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

material

 

at

normal

opera

 

 

 

 

 

 

stipulated

 

for

every

 

 

 

 

their

combination

 

must

 

 

 

 

 

 

 

 

 

 

 

 

 

 

temperature

 

 

and

 

 

 

 

 

 

 

 

diameter.

 

 

 

 

 

 

 

 

 

considered.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

efficiency,

etc.

of

such

pipeline,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

or must have sufficient strengt

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

corresponding

to

the

no

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

operating

 

 

pressure

and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

produced by the producer who is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

allowed

as

appropriate

produce

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

who

 

has

 

the

 

production

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

technical

 

 

 

or

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

technology of pipe

by METI .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

114

There is the regulation equation; Combination of primary load
and secondary load 0.9σy

Act

Gas Business Act (JP)

 

Mining Act (JP)

High Press. Gas Safety Act (JP)

Electric Business Act (JP)

Oil pipeline Business Act (JP)

 

 

Act of each countries

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Calculation

The equation for minimum wall

No provision.

The

calculation formula

for The

calculation formula

for Expected

load

such

as inner The

minimum

wall thickness Formula of

the

minimum wall

 

of piping

thickness

against

inner pressure

 

minimum

wall thickness against

minimum

wall thickness against pressure, soil pressure,

hydraulic

against

inner

pressure

(walthickness

in

the

circumferential

 

thickness

and the calculation formula f

 

inner pressure is set forth.

inner pressure, earth pressure and

pressure,

train

and

vehicle

thicknessis varies with coefficients direction

against

innerpressure

 

 

minimum

wall thickness

agains

 

 

 

road load is set forth.

prescribed by the ordinance.

designed by Location Class).

(wall

thickness

varies

wi

 

earth pressure and road load is set

 

 

 

 

 

 

 

 

 

To be

thicken,

if a large

force coefficients designed by Location

 

 

forth and the

greater

on

 

 

 

 

 

Generated stress by the load is;

such

as

scour,

landslidClass) and composite stress.

 

 

adopted.

 

 

 

 

 

 

 

 

Primary load, etc. 0.5σy

earthquake and

liquefactionis

 

 

 

 

 

 

Outer pressure

 

 

 

 

 

 

 

Pressure load 0.4σy

 

possible to apply.

 

 

 

 

 

 

 

t 2.5(K f Wσf KtWt )Do C

 

Inner pressure

 

 

 

No provision.

Inner pressure

 

 

 

Inner pressure

 

 

 

Inner pressure

Inner pressure

Inner pressure

 

 

 

 

 

(1) When the ratio between outer

(1) When the ratio between outer

(1) When the ratio between outer

The formula is provided.

 

2S

σhp (pid pod )

(D0

tmin )

 

 

 

 

 

 

P

t

FET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2 ×tmin

 

 

 

diameters to inner diameter is 1.5

diameters to inner diameter is 1.5

diameters to inner diameter is 1.5

 

D

 

 

or less.

 

 

 

 

 

 

 

 

 

or less.

 

 

 

 

 

 

 

 

 

or less.

 

 

 

 

 

 

 

 

 

F 0.4 0.8

 

 

 

 

 

 

 

t

 

 

PDo

 

C

 

 

t

 

 

 

PDo

 

C

 

t

 

 

 

PDo

C

 

 

 

 

 

 

 

 

 

 

 

 

2σ η 0.8P

 

 

2σ η 0.8P

 

2σ η 0.8P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a

 

 

 

 

 

 

 

 

 

 

 

 

a

 

 

 

 

 

 

 

 

 

 

a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2) When the ratio between outer

(2) When the ratio between outer

(2) When the ratio between outer

 

 

 

 

 

 

 

 

 

 

 

diameters

to

 

inner

diameter

is

diameters

 

to

inner

diameter is diameters

 

to

inner

diameter

is

 

 

 

 

 

 

 

 

 

 

more than 1.5.

 

 

 

 

 

 

more than 1.5.

 

 

 

 

 

more than 1.5.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

t

 

 

a η P

 

t

 

 

a η P

 

t

 

 

a η P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

o

1

 

 

 

 

C

 

 

 

o

1

 

 

 

C

 

 

o

1

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

aaη P

 

 

 

2

 

 

aaη P

 

 

2

 

 

aaη P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Earthquake

Quoted

seismic

design of

gas No provision.

No

 

stipulation

in

the

gener

Refer

to

safety rule

related

the

Provision by notice.

No specific provision.

The

formula

has

not

b

resistant

facility.

 

 

 

 

 

 

 

 

 

rule.

 

 

 

 

 

 

 

 

 

complex

 

rule ( No.717/1987/ Consideration based on stress.

 

 

 

shown,

though

earthquake

h

 

Middle

 

 

and

 

low

pr

(Complex rule: The construction

Environmental

Protection

a

 

 

 

 

been to consider as environmental

 

 

Guideline

for

 

seismicdesign of

of

pipeline must

be

safe

agains

Industrial Location Bureau

 

 

 

 

 

load.

 

 

 

 

 

 

middle

 

 

and

 

low

pressure

 

the

stress

caused

by earthquake

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pipeline.

 

 

 

 

 

 

 

*** and other secondary load.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

High

 

 

pressure:

Guideline

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

seismic design of high pressur

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pipeline

 

 

and

 

guideline

Allowable stress design method

Allowable stress design method

Allowable stress design method

 

 

 

 

 

 

 

 

 

 

 

liquefaction

seismic

 

design

Level-1

Level-1

 

 

 

 

 

 

Level-1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

high gas pipeline.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Level-2

 

 

earthquake

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

115

Act

Gas Business Act (JP)

 

 

 

Mining Act (JP)

 

 

High Press. Gas Safety Act (JP)

 

Electric Business Act (JP)

Oil pipeline Business Act (JP)

 

 

 

Act of each countries

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

considered

in

 

case

of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pressure pipeline.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pressure test

Pressure

test

for

pressure

part

To pass the pressure test under

To withstand pressure test under

 

Pressure test for pressure part

Hydro pressure test for pipeline,

Different

with

each

c

More than 1.25 times, at leas

 

must be performed by appropriate

at least 1.5 times of

maximumat least

1.5

times

of

n

must be performed by appropriate

etc. must be performed 1.5 times

locations.

(design

 

one hour by water, or air wh

 

method.

(excluding

those

t

operating pressure.

 

 

 

operation pressure.

 

 

 

 

method.

 

 

 

 

 

of

operating

pressure

by

location)

 

 

 

water is unavailable. (1.20 times

 

have passed RT

 

 

 

 

 

Pressure test or air tightness test

At least 1.25 times in

case

of 1.5 times of maximum operating

method specified in the notice.

Class1,

Dev.1 more

than

1.25

is possible

for

C,

D

fluid

 

1.5 times of maximum operating

must be performed.

 

 

 

gas.

 

 

 

 

 

pressure.

 

 

 

 

 

 

 

 

 

 

 

 

times by water

 

does not exceed 1.05 times.)

 

pressure.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class1,

Dev.2 more

than

1.1

More than 1.1 times, at least 8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

times by water or air

 

hours as

leak

test

after

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class2

more than 1.25 times by

strength test.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

water or air

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class3&4 more than 1.4 times by

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

water

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Air tightness

No

 

leakage

when

performin

To pass the air-tight examination

To pass the air-tight examination

 

No

leakage

when

performin

No provision.

 

 

 

No provision.

 

 

 

No provision.

 

 

 

test

air-tight

 

examination

 

more than 1.1 times of maximum

more

than

normal

oper

air-tight test.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

appropriate method.

 

 

 

 

operation pressure.

 

 

 

pressure.

 

 

 

 

 

1.1

times

of

the

maxim

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Air-tight examination

und

Air-tight

examination

 

 

 

 

 

 

 

operating pressure.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

maximum

operating

pressure

o

pressure test must be performed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

normal

operating

pressure

mus

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

be performed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Welding part

Welding part of the gas facility

Pipe

joint

must

be

made

 

Non-destructive

testing

 

Welding

part

 

of

the

elect

The welding of pipeline, et

Welding procedure

and welder

Welding

procedure

and welder

 

where

gas

passing

 

through

an

welding

 

 

method

 

that

 

required

when

 

testing

by

 

facilities

where

 

gas

pa

must be performed by the welding

must be pursuant to API 1104.

 

must be pursuant to ISO 13847.

 

bear 0MPa and more must hav

equivalent effect of other than arc

pressure only.

 

 

 

 

through and bear 0.98MPa a

method

such

as

arc

we

 

 

 

 

 

 

 

 

 

 

 

good melting, no harmful defects

welding.

 

However,

it

may

 

 

 

 

 

 

 

more must have safety sha

stipulated in notice.

 

 

 

 

 

 

 

 

 

 

 

 

 

due to crack by welding and have

other

safety

method

that

 

 

 

 

 

 

 

(liquefied gas pipeline)

 

 

The welding equipment, welding

 

 

 

 

 

 

 

 

 

 

 

strength at least as required

asnecessary

strength

 

for

sa

 

 

 

 

 

 

Welding

part

 

must

not ha

consumables used for welding of

 

 

 

 

 

 

 

 

 

 

 

design strength.

 

 

 

 

 

when welding is not proper.

 

 

 

 

 

 

 

cracking and could arise cracks.

pipeline

must

have

performance

 

 

 

 

 

 

 

 

 

 

 

Confirmation of WPS, welder

 

 

 

 

 

 

 

 

 

 

 

 

 

Confirmation of WPS,welder

equivalent or more than standard

 

 

 

 

 

 

 

 

 

 

 

test,

appropriate nondestructive-

 

 

 

 

 

 

 

 

 

 

 

 

 

test,

appropriate

nondestructive-

stipulated in notice.

 

 

 

 

 

 

 

 

 

 

 

 

 

testing and criteria for RT in case

 

 

 

 

 

 

 

 

 

 

 

 

 

testing and

criteria for

RT

must

The welding method andother

 

 

 

 

 

 

 

 

 

 

 

of

high

pressure

and

 

m

 

 

 

 

 

 

 

 

 

 

 

 

 

be pursuant to JIS Z3104.

 

necessary

matter

for

weldi

 

 

 

 

 

 

 

 

 

 

 

pressure

pipeline

with

150m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

must be stipulated in notice.

 

 

 

 

 

 

 

 

 

 

 

 

diameter

and

 

more

must

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pursuant to JIS Z3104.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

116

Act

Gas Business Act (JP)

 

 

Mining Act (JP)

 

 

High Press. Gas Safety Act (JP)

Electric Business Act (JP)

 

Oil pipeline Business Act (JP)

 

 

 

 

Act of each countries

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas drip box

Gas drip box must be provided

Measure

to

remove

moistur

Measure to remove water must

No provision.

 

 

 

No provision.

 

 

 

No provision.

 

 

 

No provision.

 

 

 

 

on

pipeline

which

between natural gas pipeline and

be taken.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

accumulate water.

 

its connected compressor must be

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

taken.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Corrosion

Measure to

prevent

corrosio

Appropriate

 

measures

 

Measure to prevent corrosio

The appropriate measures must

 

The

 

painting,

 

coating

Must

be

painted

or

cover

Corrosion

control

must

protection

must be taken, if there is risk o

corrosion

protection

must

must

 

be

taken

when

bu

be taken if there is a ris

electrical

corrosion

 

protection

inconsideration

with

installation

performed to prevent the risk o

 

corrosion.

 

 

 

taken for pipeline that installed in

underground.

 

 

 

 

 

corrosion.

 

 

 

 

must

be

applied

the

pip

conditions,

 

operation

non-operation due to destruction

 

 

 

 

 

the place where the much risk of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

installed

underground

or

o

environment

and

 

c

by corrosion during design life.

 

 

 

 

 

corrosion is.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

seabed.

 

 

 

 

 

 

protection condition.

 

 

 

The

outer

electricity

supp

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

method is stipulated.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Protection

Measure to prevent damage due

Protective equipment and sign

Signs must be installed when

Appropriate protective measures

 

The protection equipment must

Pipeline must be protected from

No provision.

 

 

 

measures

to contact exposed pipeline on the

must be provided if there is a risk

installing pipeline on the ground,

must be taken if there is a risk of

be installed according to notice if

damage

or accidents

by

vehicles

 

 

 

 

 

 

road with vehicles must be taken.

of damage due to collision

pipeline

must

be

buried

un

damage.

 

 

 

 

 

there

is

a

risk

of damage

in

exposed

places

 

such

 

 

 

 

 

 

 

 

 

 

vehicle

when

 

installing

on

more

than

0.6m

and

provi

 

 

 

 

 

 

pipeline or support due to

intersection

with pipe-rack

or

 

 

 

 

 

 

 

 

 

 

ground.

 

 

 

 

 

 

signs

 

when

installing

pipel

 

 

 

 

 

 

collision

of

vehicle,

vessel an

bridge

by means of separation

or

 

 

 

 

 

 

 

 

 

 

Protective measure to prevent

buried under the ground surface.

 

 

 

 

 

 

the like.

 

 

 

 

 

barrier.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

damage of the riser pipe by vessel

When installing in the wate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

must

 

be

taken

and

must

appropriate

depth that

no

affec

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

provided sign when installing on

by vessel and wave.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the seabed, etc.

 

 

 

 

Complex

rule

stipulates

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

install pipeline in the protectiv

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

structure when burying

it

rai

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

across the road, railroad, river or

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

waterway.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interrupting

Emergency shutoff

devicefor

Gas

shutoff

device

must

No

 

stipulation

 

in

gen

Shutoff equipment to block the

Every 4km for an specified area

The

 

interval between

sectio

Section shutoff valves must be

device

pipeline

that

are

buried

providedin in

the junction point

of

rule.(

Complex

rule:

Emergency

inflow and outflow of gas must be

 

in an ordinance.

 

 

 

shutoff valves must be less tha

provided at start, end and t

 

alongside the roadsuch as gas

pipeline. Pipeline must be placed

shutoff

device

must

be

provided

provided at the main entrance of

Specified in notice;

 

 

following;

 

 

 

 

points

for following

items

on

 

shutoff device.

 

 

in

a

suitable

position

 

in

every

 

4km

 

for

p

gas equipment.

 

 

 

Every 4km for back and forth of

(1) Class1 20mile

 

 

 

pipeline;

 

 

 

 

 

 

 

 

pipeline across the city, etc.

 

 

crossing

urban

area,

etc. At the The

 

last place

entering

 

theriver

 

and

channel

cro

(2) Class2 15mile

 

 

 

(1) Operation and maintenance

 

 

 

 

 

 

 

 

 

 

 

 

 

same

 

time,

measure at th can

common

 

culvert

andjunction

 

necessary

 

place

 

for

(3) Class3 10mile

 

 

 

(2) Emergency control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

transport gas to every section and

point

and

other

point

w

management

of mountai

slope

(4) Class4 5mile

 

 

 

(3) Limit of runoff

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

be replaced by an inert gas must

necessary

for

maintenance

 

and city area, every 10km f

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

be taken. )

 

 

 

 

 

pipeline.

 

 

 

outside town.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Leak

No provision.

 

 

Leak

detection

equipment

o

No provision in general rule

Appropriate measures to prevent

 

Leak detection equipment and

No provision.

 

 

 

Testing and recording mustbe

detection

 

 

 

 

leak

 

detection

 

hole

must

(Complex rule: gas leak detection

harm must be taken in case of gas

 

leak

detection

hole

must

 

 

 

 

 

 

 

performed periodically to confirm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

117

Act

Gas Business Act (JP)

 

Mining Act (JP)

 

 

High Press. Gas Safety Act (JP)

 

Electric Business Act (JP)

 

 

Oil pipeline Business Act (JP)

 

 

 

 

Act of each countries

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

device

 

provided where necessary.

 

 

alarm equipment or leak detection

 

leak.

 

 

 

 

 

provided on pipeline system.

 

 

 

 

 

 

 

 

the

suitability

of

ope

 

 

 

 

 

 

 

 

 

 

mouth must be provided on th

 

Ventilation

equipment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

requirements.

 

 

 

 

 

 

 

 

 

 

 

 

 

flammable gas pipeline.)

 

 

common

duct,

leak

detec

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

alarm

equipment

must

 

b

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

provided where gas may leak.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Protection

No provision.

To provide operation condition

No provision in general rule

 

No provision.

 

 

 

 

Monitoring device to monito

No

specific

provision. The(

Emergency

shutdown

ystem,

device

 

monitoring equipment.

 

 

(Complex rule: alarm device must

 

 

 

 

 

 

 

the operating status of equipment

provision of

emergency

shuto

pressure

 

regulating

sy

 

 

To provide alarm system in the

be

provided

 

forabnormal

 

 

 

 

 

 

 

such

as

compressor

and

 

valv

device

that

 

can

isolate

monitoring

system

 

 

event

of abnormal fluctuation

of

pressure and flow on pipeline.)

 

 

 

 

 

 

 

must be provided on pipeline.

 

dissipate gas is stipulated in th

communication

system

must b

 

 

pressure and flow rate.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Warning

device

to

indicate i

item of compressor station.)

 

provided in station.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the event of an abnormal situation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

such

as

unusualchanges

in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pressure or flow ratemust be

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

provided according to notice.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Protection measure for buried

 

To be buried underground.

 

 

Stipulated

 

according

With little human activity 0.8m

condition

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

under road must be taken.

 

 

To keep clearance at least 0.3m.

classification rules;

 

 

Farmland 0.8m

 

 

for pipeline

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0.15m

when

crossing

w

 

Distance with ground level.

 

Piping cover item-841.142

Road, railroad 0.8m

 

 

(except

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

underground object

and

at

least

(1) Forest wilderness at least

(1) Class1

24inch

 

 

 

 

 

 

seabed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0.3m in parallel case.

 

 

 

 

0.9m

 

 

 

 

(2) Class2

30inch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2) Other area at least 1.2m

(3) Calss3&4 30inch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety

No provision for pipeline.

Safety

valve

and

other

safety

Measure

to

 

avoid

exceedin

 

No provision for pipeline.

 

 

 

Control

device

to

 

con

(The

provision

of

press

The

equipment to

 

prevent

device, etc.

 

device

 

to

avoid

exceeding e

thnormal operation temperature and

 

 

 

 

 

 

 

pressure due to normal operation

safety device

is

stipulated

in the

overpressure such as relief valve,

 

 

maximum working pressure.

 

 

measure that can be returned

to

 

 

 

 

 

 

or

oil

hammering

must

item of compressor station.)

 

isolation valve

must be

provided

 

 

 

 

 

 

 

 

 

 

reduce pressure to below normal

 

 

 

 

 

 

 

provided so as not to exceed 1.1

 

 

 

 

 

 

in order to prevent the occurrence

 

 

 

 

 

 

 

 

 

 

operation pressure, if the pressure

 

 

 

 

 

 

 

times

 

of

normal

 

op

 

 

 

 

 

 

of incidental pressure.

 

 

 

 

 

 

 

 

 

 

 

 

exceeds

the

 

normal

operat

 

 

 

 

 

 

 

pressure.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pressure.

 

 

 

 

 

 

 

 

 

 

 

 

Pressure

safety

device

mu

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

have

enough capacity

to

fu

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

absorb

pressure

fluctuation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pipeline.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Items

No provision.

Pressure

sensing

devices

an

No provision in the general rule.

 

No provision.

 

 

 

 

Seismic

sensor

and

 

str

No provision.

 

 

 

 

 

 

 

 

provided

 

backflow

prevention

devices

fo

(Complex

rule:

 

Seismicsensor

 

 

 

 

 

 

 

motion

seismograph

must

 

 

 

 

 

 

 

 

 

 

 

 

specifically

 

the

marine

pipeline

must

must be provided in the necessary

 

 

 

 

 

 

 

provided

along

 

the

 

pip

 

 

 

 

 

 

 

 

 

 

 

 

 

provided

 

in

the

appro

place

along

the

pipeline

 

 

 

 

 

 

 

pursuant to the notice.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

location.

 

 

 

 

 

 

measures to prevent disaster must

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

118

Act

Gas Business Act (JP)

 

 

Mining Act (JP)

 

High Press. Gas Safety Act (JP)

 

Electric Business Act (JP)

Oil pipeline Business Act (JP)

 

Act of each countries

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

be taken.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety

No

provision

for

pipeline

.

Control

 

function that

No

 

provision

in

generaluler.

 

No provision for pipeline.

Pipeline

 

must

 

be

provi

Stipulated

in

item

a

 

 

 

 

 

control

(Stipulated

in ordinance

Articl

compressor

 

or

pump

does

(Control function that compressor

 

safety

control device

that

compressor station.

 

 

 

 

 

 

 

device

23,

26

and

27

relat

work without ensuring that t

or pump does not work witho

 

following

 

 

function.

 

(co

 

 

 

 

 

 

 

 

 

 

production)

 

 

 

control

circuit

for

the

s

ensuring

that

the

control

circu

 

function

 

that

blower

does

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

equipment

 

 

such as monitoring

for the safety equipment suchas

 

 

work without ensuring that t

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

equipment

 

of

operating

condition

monitoring

 

equipment

 

 

 

control

 

circuit

for

 

the

s

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

is normal for pipeline which

operating condition is normal for

 

equipment such as pressure safety

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

installed in the complex area.

 

pipeline which is installed in the

 

equipment,

automatic

 

oil

lea

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Control function to gracefully

complex area. Control function to

 

detection

equipment,

emergency

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

shut down compressor and pump

gracefully

shut

down

compressor

 

shutoff

valve,

seismoscope,

an

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

or

close

emergency

s

and pump or close emergen

 

other safety equipments is normal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

equipment

 

 

by

automatic

shutoff

equipment

by automati

 

and control function to gracefully

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

manual in the event of abnormal

or

manual

 

in

 

the

even

 

shut

down

 

blower

or

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

conditions.

 

 

 

 

 

abnormal conditions.)

 

 

 

 

emergency

shutoff

equipment

by

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

automatic or manual in the event

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

of abnormal conditions.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Protective

No provision.

 

 

Earthling must be provided,if

No provision in the general rule.

 

No provision.

Earthling must be provided i

No specific provision.

 

 

No specific provision.

 

 

grounding

 

 

 

 

 

required for safety.

 

 

 

(Complex rule: Earthing must be

 

required for safety.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

provided for safety, if necessary.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Insulation

No provision.

 

 

Measure must be taken such as

No

stipulation

in

general rule.

No provision.

Pipeline

 

system

 

must

No specific provision.

 

 

The following items must b

 

 

 

 

 

 

insulation from support or other

(Complex rule: Measures must be

 

insulated

from

other

struct

 

 

 

 

taken

into account

for

 

 

 

 

 

 

 

structure,

 

 

 

application

taken

 

such

as

insulation

fr

 

such

as

 

support,

 

if

ther

 

 

 

 

selection of the insulation;

 

 

 

 

 

 

 

 

insulating

fittings

and

necessary

support

 

 

or

 

 

other

structures,

 

 

necessity for safety.

 

 

 

 

 

 

 

 

(1)

Risk for fluid

 

 

 

 

 

 

 

 

 

measure

 

for

insulation

w

application

of

insulating

fitting

 

The

insulated

intjo

 

must

b

 

 

 

 

(2)

Insulation

systems

a

 

 

 

 

 

 

installing

 

 

pipeline

in

 

and

 

necessary

 

measure

 

 

applied

to

 

pipeline

 

system,

 

 

 

 

 

other safety requirements

 

 

 

 

 

 

 

proximity

 

to

location

of

insulation

 

must

 

be

takenif

 

there is necessity for safety.

 

 

 

 

 

(requirement

as

 

op

 

 

 

 

 

 

arrester

 

 

must

be

take

necessary for safety.)

 

 

 

 

Necessary

 

insulation

measure

 

 

 

 

management

 

 

 

 

 

 

 

 

 

necessary for safety.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

must be taken when installi

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pipeline

 

in

 

close

proximity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

location of the arrester.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lightning

No provision.

 

 

To be provided, if required for

No

 

provision

 

in

thegeneral

 

No provision.

The lightning protection system

No specific provision.

 

 

No specific provision.

 

 

protection

 

 

 

 

 

safety.

 

 

 

 

 

 

rule.( Complex rule: measures to

 

 

must be provided for the part that

 

 

 

 

 

 

 

 

 

system

 

 

 

 

 

 

 

 

 

 

 

 

 

avoid

the

effects

of

lightni

 

are placed on the ground pursuant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

must be taken , if necessary.)

 

 

to notice.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

119

Act

Gas Business Act (JP)

Mining Act (JP)

High Press. Gas Safety Act (JP)

 

Electric Business Act (JP)

Oil pipeline Business Act (JP)

Act of each countries

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Others

No provision.

 

 

No provision.

Complex

ule:r

Power

f

No provision.

 

 

Emergency reporting equipment

No specific provision.

No specific provision.

 

 

 

 

 

 

 

security,

patrol

vehicle

 

 

 

 

 

 

and a

facility

to

notify

 

 

 

 

 

 

 

 

 

equipment

storage

must

 

 

 

 

 

 

authority must be provided along

 

 

 

 

 

 

 

 

 

provided.

 

 

 

 

 

 

 

 

the pipeline.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Chemical

fire

engine, patr

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

vehicle

and

equipment

stora

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

must be provided along pipeline

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pursuant to notice.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Leak test

HP once every 14 months

No provision. (according to

No provision. Airtight test is

 

No

provision. Inspection

No provision.

 

 

No specific provision.

No specific provision.

 

Others once every 40 months

safety manual)

required as a security check

 

frequency

 

must

be

done

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

accordance

with

Gas

Busin

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Act.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pressure

Prevention

 

measures

due to

Pressure regulator at appropriate

No provision.

 

 

No provision.

 

 

No provision.

 

 

No specific provision.

No specific provision.

regulator

fire caused

by

gas

leak

location, gas isolating equipment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(high pressure), shutoff device

at the entrance of regulator and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and

impurity

 

safety device at the outlet must be

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

equipment

 

at

entrance,

provided for pipeline if necessary.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

prevention

 

apparatus

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pressure rise,

flood

protection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

device,

anti-icing

 

system

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

support

 

to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

earthquake

 

and

 

ove

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

maintenance

 

for

if

gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

supplied to one user.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 