- •Table of Contents
- •List of Tables
- •List of Figures
- •List of Photos
- •Abbreviation
- •Chapter 1 Organizational Structure and Duties
- •Chapter 2 Acceptance of Equipment and Plants for putting in Operation
- •Chapter 3 Personnel Preparation
- •Chapter 4 Plan for Repair of Equipment, Plant and Construction
- •Chapter 5 Safety Technology
- •Chapter 6 Fire Prevention Equipment
- •Chapter 1 Plan
- •Chapter 1 General Provisions
- •Chapter 2 Civil Works and Mechanical Equipment for Civil Works
- •Section 1 Civil Works
- •Section 2 Check of Civil Works' Condition
- •Section 3 Mechanical Equipment for Civil Works
- •Chapter 3 Management of Water Sources in Powerhouses, Assurance of Meteorology and Hydrology
- •Section 1 Water Regulation
- •Section 2 Environment in Reservoir
- •Section 3 Hydro-Meteorological Activities
- •Chapter 4 Hydraulic Turbine / Generator
- •Chapter 1 General Provisions
- •Chapter 2 Fuel Transportation and Supply
- •Chapter 3 Pulverized Coal Processing
- •Chapter 4 Boiler and its Auxiliary
- •Chapter 5 Steam Turbine and its Auxiliary
- •Chapter 6 Unit-type of Thermal Power Plants
- •Chapter 7 Gas Turbine and its Auxiliary
- •Chapter 8 Diesel Generator
- •Chapter 9 Automation and Thermo-measuring Equipment
- •Chapter 10 Water Treatment and Hydration
- •Chapter 11 Pipelines and Valves
- •Chapter 12 Auxiliaries for Thermo-mechanical Section
- •Chapter 13 Environmental Protection Facilities
- •Chapter 1 General Provision
- •Chapter 2 Generator and Synchronous Compensator
- •Chapter 3 Electric Motor
- •Chapter 5 DISTRIBUTION NETWORK
- •Chapter 6 BATTERY SYSTEM
- •Chapter 7 OVERHEAD POWER LINES (OPL)
- •Chapter 8 Power Cable Lines
- •Chapter 9 PROTECTIVE RELAY AND AUTOMATION
- •Chapter 10 Grounding Equipment
- •Chapter 11 OVER-VOLTAGE PROTECTION
- •Chapter 13 Illumination
- •Chapter 14 Hydrogen Generation Station
- •Chapter 15 Energy Oil
- •Chapter 1 LOAD DISPATCH COMMAND
- •Chapter 3 OPERATOR
- •Chapter 4 DISPATCHING AND CONTROLLING DEVICES
Section 3 Mechanical Equipment for Civil Works
Article 74. (Article 74) General requirement
1.Maintenance works
The purpose of the maintenance work at the hydromechanical equipment is to keep the equipment safe and certain conditions for the long time.
The checks of the equipment must be implemented periodically as a general rule, but additional checks are conducted as needed for example before/after natural disaster.
At the maintenance work and/or check, it is necessary to get rid of trashes in order to operate the gates certainly as well as to replace disposables.
Periodical checks by actual operation are desirable to keep the equipment in good condition.
Article 75. (Article 75) Conditions of gates
1.1Rust and wear
Corrosion at the bottom of the gate may develop rapidly, and corrosion caused by galvanic corrosion may become seriously at the limited part of a gate. Attention must be paid sufficiently to these phenomena at the maintenance.
Deterioration of the coating causes corrosion of the base metal. Therefore, condition of the coating must be checked carefully. Also the coating must be checked frequently as much as possible by means of observation, measuring thickness and so on.
The typical point at the visual check for coating is whether the following phenomena occurred or not;
-Blistering
-Cracking
-Peeling
-Chalking
2.Movement of gate
At a gate operation, the movement of gate leaf must be stable and an abnormal vibration and an abnormal sound must not occur. In addition, a gate must not be hooked unevenly. If a gate is hooked unevenly, there may be problems in water tightness and resting condition.
3.Positioning of gate
In many cases, a gate must be operated for detailed control of the reservoir water level and discharge volume. Therefore, position of the gate must be recognized correctly.
4.Water leakage from gate
Seal part of a gate may lose the function because it must endure under friction, pressure, deterioration, deformation and damage caused by intervened trashes. Attention must be paid to the above matter, and a seal rubber must be replaced if it is damaged.
5.Operating condition
When a gate is kept at minute opening (crack opening) for a long time, Vibration may occur and seal rubber may be damaged. Attention must be paid to the gate position.
97